                                       Form 6 – Compiled Decision Notice
                                       INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


 File No:    2005/1917                             Date of Decision:      23 May 2007

1.     APPLICANT DETAILS

 Name:               Raphill Pty Ltd

 Postal address:     CARE Ken Hicks & Associates
                     PO Box 6380
                     MAROOCHYDORE QLD 4558

 Phone no:           5443 2844                 Fax no:      5443 7146

2.     PROPERTY DESCRIPTION

 Street address:     224-228 David Low Way & 3-5 Heron Street, Peregian Beach

 Real property       Lot 1 RP 152737 & Lots 75-78 P 9311, County of March, Parish of Weyba
 description:

3.     OWNER DETAILS

 Name:               Raphill Pty Ltd

 Postal address:     PO Box 186
                     PEREGIAN BEACH QLD 4573

4.     REFERRAL AGENCIES

 Referral Agency            Address                                                      Basis
 Environmental              GPO Box 2771, Brisbane Qld 4001                              Concurrence Agency -
 Protection Agency                                                                       Contaminated Land

5.     APPLICATION TYPE

 Development                      Development Details                             Preliminary        Development
                                                                                   Approval             Permit
 Material Change of Use of        Professional       Office, Commercial                No                 Yes
 Premises                         Premises, Commercial Services, Medical
                                  Centre, Shop, Restaurant & Multiple
                                  Dwelling (3 units)

 Reconfiguring a Lot              5 lots in to 3 lots                                  No                 Yes

6.     DECISION DETAILS

Council on 13 April 2006 decided to approve the application and grant a Preliminary Approval, subject to
conditions.
In relation to representations made by the Applicant, Council on 15 June 2006 decided to:
A.     Grant a Development Permit for Material Change of Use of Premises for Professional Offices, Commercial
       Premises, Commercial Services, Medical Centre, Shop, Restaurant & Multiple Dwelling (3 units) and
       Reconfiguring a Lot – 5 lots into 3 lots subject to conditions contained in the Preliminary Approval, with the
       following amendments.
B.     Delete Conditions 1, 23, 45, 49, 50, 54, 123, 130 and 131.
C.     Amend Conditions 4, 24, 27, 29, 36, 43, 48, 53, 109 and Items 5 & 10 contained within the Decision
       Notice;
Full text of the other 23 pages

Page 2

NOOSA COUNCIL IDAS Development Application Decision Notice                                          2 of 24

D.     Include two additional conditions;
E.     Refuse to delete Conditions 37, 41 & 66 for the following reasons:-
       Condition 37
       The amendment of Condition 4.1 and deletion of Condition 4.2 are to the satisfaction of the applicant and
       therefore it is agreed to retain Condition 37.

       Condition 41
       The amendment of Condition 4.1 and deletion of Condition 4.2 are to the satisfaction of the applicant and
       therefore it is agreed to retain Condition 41.

       Condition 66
       The works required as part of Condition 63 are not part of the Pathway Trunk Network and therefore
       contribution to this network is still applicable.
F.     Issue a Negotiated Decision Notice.
In relation to a request to change the development approval, Council on 23 May 2007 decided to:
A.     Approve a change to Conditions 2, 4.1, 25, 59 & 109.
B.     Issue a Compiled Decision Notice.

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.

8.     SUBMISSIONS

One properly made submission & 2 not properly made submissions. See attached list.

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached. Conditions from the
Environmental Protection Agency, as a concurrence agency are also attached.

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit
 Development Permit for Building Works               All building works

 Development Permit for Operational Works            Access and/or Carparking, Site Civil Works, Roadworks,
                                                     Stormwater Drainage, Frontage Works, Sewer Reticulation,
                                                     Water Reticulation, Site Filling, Excavation of Materials to fill
                                                     another site and Landscaping.

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                   Signature:                                Date:       25/05/07



DECISION NOTICE HISTORY
 Original Decision Notice 13 April 2006.
 Negotiated Decision Notice granting a Development
   Permit with amendment to Conditions 4, 24, 27, 29,
   36, 43, 48, 53, 109 and Items 5 & 10 of the Decision
   Notice, deletion of Conditions 1, 23, 45, 49, 50, 54,
   123, 130 and 131 and inclusion of two additional
   conditions on 15 June 2006.
 Minor change to the approval with amendment to
   Conditions 2, 4.1, 25, 59 & 109 on 23 May 2007.

A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                         3 of 24




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


                         MATERIAL CHANGE OF USE OF PREMISES
Land Use
1.     Deleted.

2.     Development undertaken in accordance with this approval must generally comply with the approved plans
       of development. The approved plans are titled and numbered:-

       2.1.   Ground Level Plan, First Floor Plan, Roof Plan, Elevations, Project No 0503, Revision A, prepared
              by H2o Architects and dated 10 November 2006;

       2.2.   Survey Plan A0.02, Basement Plan A1.00 Revision 16, Sections A6.01 Revision 16, Project No
              503, prepared by H2o Architects and dated 6 January 2006;

       and as may be amended by these conditions

3.     The development must be undertaken and operated in a manner that causes no detrimental effect upon
       the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
       emissions.

4.     The development shall incorporate the following amendments to the building design:-

       4.1.   The development shall have a maximum building footprint and a total site cover as shown on the
              approved plans.

       4.2.   The development shall have a maximum gross floor area of 1,561m².

       4.3.   The timber pergola located on the corner or Kingfisher Drive and Heron Street shall not be located
              within the road reserve;

       4.4.   The bin storage area located adjacent to the David Low Way street frontage shall be relocated and
              the screening vegetation extended through to the property boundary;

       4.5.   Sight lines from the parking aisle that serves the 6 car parking spaces, accessed off the side of the
              main entry driveway (under the medical centre), shall be improved as there is currently limited
              vision of vehicles on the ramp without vehicles in the parking aisle having to protrude some
              distance onto the actual ramp. A Traffic Engineer with appropriate qualifications in this area shall
              certify the design at the Operational Works stage.

       4.6.   The main access ramp shall be widened / flared where it joins with the basement carpark (to the
              south east of the proposed lift), to improve vehicle access onto the ramp, which is currently quite
              tight to manoeuvre and results in vehicles having to turn into the path of oncoming traffic on the
              ramp. A Traffic Engineer with appropriate qualifications shall certify the design at the Operational
              Works stage.

       4.7.   A Traffic Engineer with appropriate qualifications shall certify the design at the Operational Works
              stage with regard to the manoeuvring room at the southeast and southwest corners of the
              circulation aisle of the basement carpark due to the positioning of the Plant Room and Bicycle
              Parking Compound.

       4.8.   Access to the lift from the two disabled spaces shall be positioned to the east of this row of spaces
              and any necessary modifications to the plant room, structure and/or adjacent spaces will be
              included in the operational works application to ensure that a clear path to the lift is available for
              use with appropriate headroom and width. A Traffic Engineer with appropriate qualifications shall
              certify the design at the Operational Works stage;




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                         4 of 24


5.     The open space and setback areas are to be landscaped in accordance with Council’s Policy on
       Landscaping Guidelines and a properly prepared landscape plan prepared by a suitably qualified
       Landscape Architect or Horticulturalist. Such landscaping is to be completed prior to the premises being
       occupied and maintained at all times thereafter. The landscaping plan is to include:-

       5.1.   The establishment of 45 litre screening vegetation to reach a height of 4 – 6 metres along the
              length of the northern property boundary to ensure adequate screening for the adjoining
              properties.

       5.2.   The provision of either of the following species within the courtyard areas:-

              5.2.1.     BANKSIA integrifolia, exground or 200 litre bag stock to be planted in groups of 5 & 7 in
                         the one podium planter box;

              5.2.2.     HIBISCUS tiliaceus (Cottonwood), exground or 400 litre bag stock, single planted in
                         planter box;

              5.2.3.     METROSIDEROS thomasii, exground or 2 x 400 litre bag stock, double planted in
                         planter box;

              5.2.4.     PANDANUS pendunculatus, exground, single planted in planter box.

       5.3.   The provision of additional landscaping to screening all waste storage areas.

6.     Existing trees on the site and within road reserves are to be retained, except where required to be
       removed due to building operations or the conduct of the approved use.

7.     The proposed ramp walkway along the northern property boundary shall not be utilised for outdoor dining
       purposes and shall be kept clear at all times.

8.     The tenancies nearest the northern boundary of the site (shops 8 and 9 and the restaurant) shall maintain
       a focus towards the courtyard areas with limited access to the proposed ramp/walkway in order to
       minimise noise impacts on adjoining residential properties.

9.     All deliveries associated with the Business Uses on the premises shall be undertaken only between the
       hours of 7am to 7pm.

10.    Business Uses shall operate only between the hours of 7am to 10pm, 7 days a week, except Friday and
       Saturday where Entertainment and dining business uses may operate until 12 midnight.

11.    Any gate constructed across the vehicle access to the site shall remain open between the hours of 7am to
       10pm Sunday to Thursday and 7am to 12 midnight Friday and Saturday.

12.    The amenity facilities (toilets) shall be available to patrons of the development for use during the operating
       hours of businesses on site.

13.    Ground floor premises shall provide a minimum 50% glazing to shop fronts.

14.    Natural and muted earth tones shall be incorporated on external walls and roofing so as to integrate with
       the natural environment.

15.    Signage shall be integrated into the building façade and comply with Council’s policies on advertising.

16.    Signage clearly delineating the upper level residential access from the upper level commercial access
       shall be provided.

17.    Arcade and courtyard paving shall be integrated with the paving types detailed in Council’s Peregian
       Centre Masterplan.

18.    Any additional mechanical plant and equipment shall be located greater than 2 metres from any property
       boundary and shall be fully enclosed and integrated with a component of the building. Plans illustrating
       this shall be submitted to Council to the satisfaction of Manager Land Use prior to the equipment being
       installed.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                            5 of 24


19.    The bicycle racks located adjacent to the Heron Street property boundary shall be relocated within the
       courtyard areas. Amended plans detailing this shall be submitted prior to obtaining a Development Permit
       for Operational Works.

20.    Lighting of appropriate intensities is to be provided which satisfies the requirements of Australian
       Standard AS1158: Public Lighting Code.

21.    The blank walls associated with the stairways, amenities and bin storage areas on the lower floors shall
       incorporate measures in the form of landscaping, creepers, murals, vandal resistant paint, etc to deter
       vandalism.

22.    Lighting shall be directed on to the site and away from neighbouring properties.

23.    Deleted.

24.    The outdoor dining areas shall comply with Planning Scheme Policy 14 and shall only use flexible, roll-up
       or drop plastic sheeting when adverse weather conditions prevail, and these should be cleaned regularly.

25.    The development shall have a maximum height above natural and finished ground level of 8.4 metres
       except for the flumes, which shall be constructed in accordance with plans titled and numbered
       Mechanical Services Layout Roof Level Drawing No. Q0371-MS-07A dated 9 November 2006 and
       Section & Schedules Drawing No. Q0371-MS-06C, Mechanical Services Layout Level 1 Drawing No.
       Q0371-MS-05C and Ground Level – Part 2 of 2 Drawing No. Q0371-MS-04C dated 8 November 2006
       prepared by Marc Air Conditioning Services. A verification survey of the building is to be carried out by a
       Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with
       the this condition.

26.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like, thus remaining
       as open structures.

27.    Security in the form of a cash bond or trading bank guarantee to the sum of $100 000 must be submitted,
       to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
       Operational Work. The cash bond or trading bank guarantee will be returned on performance of the
       conditions of approval less any costs incurred by Council in respect of enforcing performance of this
       permit.

28.    The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
       obtaining a Development Permit for Building Works.

29.    This Development Permit lapses if the use has not happened by 15 June 2010, unless an application to
       extend the currency is approved by Council.
Land Development
Vehicle Access
30.    The main entry driveway off the David Low Way, which gives access to and from the proposed
       development, shall be designed and constructed as a left-in / left-out access driveway with no right turn
       movements permitted to or from the development and shall incorporate a pavement threshold to define a
       significant change in road environment to entering motorists.
       In accordance with the Australian Standard for Off Street Car Parking AS2890.1-2004 both the entry and
       exit must be separated by a central traffic island with a 6m wide entry and a 4-6m wide exit, separated by
       a 1-3m wide traffic island.
       In this regard the traffic island shall be shaped to promote a left-in entry and a left-out exit, with a break in
       the island to allow the smooth flow of pedestrians along the footpath without the need for pedestrians to
       step up onto the traffic island. The proposed traffic island shall also extend down part of the driveway
       ramp to help guide vehicles in the correct direction and not into the path of oncoming vehicles.
31.    A centre median shall also be provided on the lower portion of the main entry driveway (where the
       driveway bends to the south to provide access into the basement carpark) to ensure vehicles travel on the
       correct side and do not stray into the path of oncoming vehicles. This median need only be 200mm wide
       x 150mm high.

32.    The driveway shall be designed and constructed to grades that prevent vehicles from scraping and/or
       bottoming whilst also allowing pedestrians movements along the footpath without any level difference.
       Should any driveways be constructed to grades that do not comply with AS2890.1-2004 and AS2890.2-
       1989, Council will require that the driveway be removed and reconstructed to levels that do comply.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                           6 of 24


       Please note, a step between the driveway and the footpath shall be avoided, as it is preferred to have the
       footpath continue at a constant grade to minimise the potential for pedestrians to trip or fall.
33.    All vehicles shall enter and leave the site in a forward direction.
External Roadworks
34.    The applicant shall provide a centre traffic median within the David Low Way extending from the existing
       roundabout splitter island along the entire frontage of the site (up to a point in-line with the northern
       boundary of Lot 1 on RP 152737, #228 David Low Way and the southern boundary of Lot 0 on BUP
       101281, #232 David Low Way) to prevent vehicles from turning right into/from the development.

35.    Any roadworks widening and associated works (including pavement correction to the existing pavement,
       drainage works, modification of the footpath, landscaping, and adjustments to the existing infrastructure)
       that may be required as a result of the new centre traffic median shall be at no cost to Council. In this
       regard, plans detailing this work shall be prepared and submitted to Council for approval prior to obtaining
       a Development Permit for Operational Works.

36.    A safe U-turn facility shall be provided along the David Low Way to the north of the development, and
       within close proximity to the site, to enable northbound traffic the ability to U-turn in order to gain entry to
       the development. The provision of this facility shall be at no cost to Council, as the facility is needed to
       enable patrons of the development the ability to safely turn around. This facility shall be constructed prior
       to the approved use commencing.
       As an alternative to construction of the U-turn facility, Council may elect to enter into an Infrastructure
       Agreement with the applicant for the future roundabout to be constructed at Woodland Drive in
       accordance with the Coastal Major Roads Network Infrastructure Charges Plan (CMRNICP). This
       agreement would need to address, but not be limited to:
            Who pays for the design;
            Who constructs the infrastructure;
            The amount of costs to be borne by each party, recognising that the costs associated with
              constructing the roundabout prior to Council’s programme of 2010 will be the applicant’s;
            Use of CMRNICP contributions paid by this development towards the roundabout cost;
       All costs involved with the preparation of any Infrastructure Agreement will be borne by the applicant..
37.    A pedestrian priority crossing shall be provided in Heron Street between Courtyard E of the new
       development and the existing Peregian Centre on the southern side of Heron Street at no cost to Council.
       This crossing shall be designed as a shared zone and be consistent in design, form and function with the
       two existing shared zones in the precinct. Plans illustrating the design shall be submitted to Council prior
       to obtaining a Development Permit for Operational Works.

38.    To cater for increased pedestrian movements, in a north south direction at the Heron Street / David Low
       Way intersection, kerb ramps shall be installed and a pavement threshold shall be provided in Heron
       Street to define a significant change in road environment to motorists entering Heron Street from the
       David Low Way.

39.    To cater for increased pedestrian movements in a north south direction at the Heron Street / Kingfisher
       Drive intersection, kerb ramps shall be installed.

40.    The northern leg of the roundabout at Heron Street shall be provided with kerb ramps and a safe at grade
       gap in the central median island to facilitate safe pedestrian access in an east west direction.

41.    A raised at grade platform for pedestrians shall be provided in Kingfisher Drive (south of the proposed
       Delivery / Garbage collection bay) at the intersection with Heron Street to enable pedestrians to cross
       safely in an east west direction. This platform will by its physical nature be slow speed and shall fit in with
       the shared zone strategy for the precinct.

42.    A 2m wide pathway shall be provided between the new kerb ramps and the existing / proposed pathway
       network.

43.    A linemarked on road bicycle lane shall be provided on the David Low Way adjacent to the site at no cost
       to Council, the works shall include removal of existing lines and linemarking in accordance with Council
       requirements.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                        7 of 24


44.    All roadworks upgrading shall be designed by a suitably qualified Registered Professional Engineer
       Queensland (RPEQ) and submitted to Council for approval prior to obtaining a Development Permit for
       Operational Works.
Roadworks Contributions (Local Road Network)
45.    Deleted.
Loading / Delivery Areas
On Street Delivery Area

46.    A Delivery / Garbage collection bay shall be provided within the Kingfisher Drive road reserve at no cost to
       Council. This bay shall be sized appropriately to facilitate the requirements of a Council refuse collection
       vehicle, giving consideration to the number of bins to be serviced and the room / length needed to store
       and service these bins along the verge. In this regard a wheelie bin is 600mm wide and each wheelie bin
       is required to be spaced approximately 500mm apart to allow adequate room for the collection arm of the
       refuse truck to be able to collect each bin.
       The Delivery / Garbage collection bay shall also be positioned to provide separation to the new pedestrian
       crossing across Kingfisher Drive (south of the bay), as required by conditions within this permit, and shall
       not restrict sight lines to pedestrians approaching the crossing. The 2m pathway adjacent to this bay shall
       be aligned to provide continuous use by pedestrians even when bins are placed for collection.
47.    The Delivery / Garbage collection bay shall be appropriately line-marked and signposted to prevent
       misuse and be kept and maintained in a condition fit for use. In this regard a regulatory sign shall clearly
       define the maximum length of time a delivery vehicle can remain parked to ensure the bay is available for
       use by other delivery vehicles and the Council refuse vehicle.

Off Street Delivery Area

48.    The proposed shared “Pedestrian / Vehicle / Ambulance / Small Rigid Vehicle (SRV)” zone located on the
       parking aisle between the 6 car park spaces accessed off the side of the main entry driveway (under the
       proposed medical centre) is not approved.
       Accordingly the parking aisle shall be used for the purposes of gaining entry to the 6 car parking spaces
       only, and not combined with an ambulance / delivery space.
49.    Deleted.
Carparking
On Street
50.    Deleted.

Off Street
51.    Carparking shall be provided within the site as shown on drawing number A1.01, revision 16, dated
       06/01/06, by H2o Architects Pty Ltd (Project No. 0503), except as modified herein.

52.    The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for user class 3
       with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head
       clearance (headroom) at any point of 2.2m.

53.    All disabled car park spaces shall be designed to comply with the provisions of AS 2890.1-2004 for user
       class 4 with allowance for vehicles to enter and leave the site in a forward gear with a minimum head
       clearance of 2.3m and with a minimum head clearance (headroom) of 2.5m above the space from the
       point of entry to the space to a point 2.16m from the front.

54.    Deleted.

55.    Signage shall be provided to all frontages of the development to advise/direct patrons to the basement
       carpark.

56.    All owners / tenants shall be required to inform their visitors / customers of the basement car parking
       arrangements, particularly when such patrons are required to make an appointment or booking (as is
       often the case for a Medical Centre Uses and Restaurant Uses). These requirements shall be
       incorporated into the Community Management Scheme for the development and a copy submitted to
       Council for approval prior to the approved Uses commencing.

57.    All car parking shall be kept, maintained and line-marked in a condition fit for use.



A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                         8 of 24


58.    At least 2 motorcycle/motorscooter spaces shall be provided on site, and in this regard a maximum of 1
       carparking space shall be permitted to be removed/altered to accommodate these 2 spaces. These 2
       spaces should be positioned close to the main entry ramp that enters the basement carpark to allow
       people travelling on motorcycle or scooter to quickly locate a parking space without having to park in a
       standard car park space.
Bicycle Facilities
59.    End of trip bicycle storage facilities, showering facilities and changing rooms shall be provided in
       accordance with Council’s latest policies to encourage cycling and walking to the development by staff
       and customers.
Vegetation Protection & Preservation
60.    Vehicular pavements within the drip zone of any proposed trees on site (or existing trees to remain) shall
       be designed as a pervious pavement (such as grass paving cells or similar), to allow water that falls on
       this surface to penetrate to the trees root system. The pavement shall be constructed so as not to
       damage the tree or their root system and in this regard temporary fencing may need to be provided
       around existing trees during construction to help protect them.
       Plans shall be submitted to the Council for approval that clearly show the type and extent of the pervious
       pavement and the temporary fencing prior to obtaining a Development Permit for Operational Works.
Park Contributions

61.    A Park contribution of $3,616 towards the acquisition of additional parkland or the improvement of existing
       parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit
       for Operational Works in accordance with Council’s Planning Scheme Policy PSP24 Park Requirements
       for Development Applications. This amount will be subject to variations in the Consumer Price Index, All
       Groups Brisbane from December 2005 until the date of payment.
Frontage Works
62.    Footpath improvements such as topsoiling, grassing, and tree planting (with low shrubs and shade trees)
       shall be provided to all road frontages of the site (i.e. the David Low Way, Heron Street, and Kingfisher
       Drive) in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines and the Peregian
       Centre Master Plan, to the satisfaction of the Manager – Design, Works Directorate. This landscaping
       shall not obstruct safe road use and safe conditions for pedestrians and cyclists by limiting sight lines. All
       grass shall be couch, free of weeds.

63.    A new 2.0m wide concrete path shall be constructed along all frontage of the site (i.e. the David Low Way,
       Heron Street, and Kingfisher Drive), in accordance with Council’s design standards and to an alignment
       that protects any significant vegetation or any underground services.

64.    All paths and kerb ramps shall be designed and constructed to ensure pedestrian safety using non-slip
       materials and to produce an evenly graded surface finish.

65.    All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath
       paving and landscaping such as trees and grasses in accordance with Council’s Standard specifications
       prior to commencement of the use permitted by this permit.
Pathway Contributions
66.    A pathway contribution of $813 towards external major pathways, in accordance with Planning Scheme
       Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council prior to obtaining a
       Development Permit for Operational Works. This amount will be subject to variations in the Consumer
       Price Index, All Groups Brisbane from December 2005 until the date of payment.

Internal Pedestrian Pathways

67.    All internal pedestrian ramps and pathways shall be designed and constructed to ensure pedestrian safety
       using non-slip materials and to provide disabled access in accordance with the appropriate Australian
       Standards.
Undergrounding Power
68.    All existing overhead electricity wires to the frontages of the development (David Low Way, Heron Street,
       & Kingfisher Drive) shall be redirected underground to help beatify the streetscape and aid with the growth
       of street trees. This work shall be at no cost to Council.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                         9 of 24


Stormwater Drainage
69.    All stormwater drainage shall be collected on site and discharged so there is no net increase in
       stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged
       to Council’s existing drainage structures in Kingfisher Drive. Plans of the drainage design shall be
       prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
       Development Permit for Operational Works. In this regard the capacity of Council’s existing drainage
       system shall be determined in order to ensure that the existing system has capacity to carry additional
       flows.

70.    Roof runoff from any new buildings shall be directed to a rainwater storage system or tank (with a
                                                2
       minimum storage capacity of 12 litres/m of roof area) that is installed to ensure water from the tank can
       be used for external uses (such as watering gardens, irrigation, ornamental ponds, water features,
       topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets internal to the building.
       All rainwater tanks are to be designed and installed in accordance with the Queensland Development
       Code (QDC), Part 25 – Rainwater Tanks, and to the satisfaction of Council’s Manager Plumbing Services.
       The location and capacity of the tanks shall be clearly shown on the plans submitted for Building Works
       approval and any overflow shall be directed to the stormwater drainage system for the development.

71.    All stormwater on site, except roof water, shall be discharged through an approved Gross Pollutant Traps
       (GPT) prior to being permitted to discharge into Council’s drainage system.
       To this end, a detailed maintenance plan shall be prepared for the GPT, which shall be submitted to the
       Council for approval prior to obtaining a Development Permit for Operational Works.
       The approved maintenance plan shall be incorporated in the Community Management Scheme for the
       development (if no Community Management Scheme then in the development’s maintenance plans) and
       a copy of this shall be provided for Council’s records prior to commencement of the approved Use.
72.    Any GPT proposed within the basement carpark shall be capable of being serviced and maintained by
       ensuring sufficient head clearance over the GPT.

73.    All site stormwater drainage shall be by means of a gravity system in accordance with section 3.4.4.12 of
       Council’s Planning Scheme.

74.    All stormwater drainage lines that will become a Council asset shall be inspected by closed circuit
       television (CCTV) prior to commencement of the approved Use.
       CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
       satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
       inspection, including any additional inspection necessary following defect identification and rectification.
       This charge is payable prior to the issue of Operational Works approval and will be determined on the unit
       rate basis current at the time of approval.
75.    Plans of the drainage scheme shall be prepared by a Registered Professional Civil Engineer and
       submitted to Council prior to obtaining a Development Permit for Operational Works. The applicant shall
       note that a Development Permit for Building Works will not be granted until a Development Permit for
       Operational Works has been issued in regard to the drainage scheme.
Sewer Mains
76.    The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
       accordance with Council’s standards and requirements at no cost to Council.

77.    The existing sewer main that currently crosses part of the site shall be relocated at no cost to Council to
       make way for the new development and basement car park.

78.    All existing and/or future sewer mains within the site or adjacent to the site which are intended to remain,
       shall be accurately located by a licensed Surveyor whom shall determine their ‘zone of influence’ (taken
       as the area within a 45-degree angle measured from the invert of the sewer main to the finished surface
       level) and arrange for easements to be created over these mains where the ‘zone of influence’ impacts on
       the subject site.
       This ‘zone of influence’ for both existing sewer mains and proposed sewer mains shall be shown on all
       plans submitted for Operational Works approval and Building Works approval to ensure no damage
       occurs and no encroachments result.
79.    To ensure Council’s sewer mains are accessible for maintenance purposes and are protected from risk of
       damage, no structures requiring a building permit (eg. buildings, swimming pools, retaining walls
       exceeding 1m in height, raised terraces, etc) shall be constructed within this ‘zone of influence’ and as
       such the applicant shall amend Operational Works plans, including Building plans to ensure compliance.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 10

NOOSA COUNCIL IDAS Development Application Decision Notice                                       10 of 24


Town Water Supply
80.    The site shall be connected to Council’s existing town water supply and be constructed in accordance with
       Council’s standards and requirements at no cost to Council.

81.    Each water connection to the water reticulation system shall extend to the property boundary and be
       metered. Where multiple units including leased buildings are served by a single service, multiple water
       meters to each individual unit or leased building shall be installed. All fees for the supply of water meters
       shall be paid to the Council.
Service Easements (Sewer / Stormwater)
82.    A registered easement shall be created over the ‘zone of influence’ of all sewers within the subject site
       and over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
       easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
       twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
       finished surface) and be no less than 3.0m wide. In this regard a licensed surveyor shall accurately locate
       all sewer mains and determine the necessary width of the easement, which shall be shown on any plans
       submitted for Operational Works / Building Works approval. To this extent the surveyor shall certify that
       the sewer and the zone of influence is wholly contained within the easement to be created.
       In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
       writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
       additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
       A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
       commencing.
       Any changes required by Council’s Solicitor must be corrected immediately.
83.    A registered easement shall be created over any stormwater drainage pipes within the site that collect
       stormwater from a Council road or convey stormwater from any adjoining property (for example, where
       drainage pipes are provided within the site to prevent adjacent properties from additional ponding/flooding
       due to works on the subject site).
Headworks Contributions
84.    Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30
       on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at
       the rates applicable at the time of payment. An estimate only of the contribution rates under the current
       policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index,
       All Groups Brisbane from December 2005 until the date of payment.
       Water Supply         $10,059
       Sewerage             $27,965
       TOTAL                $38,024
       All headworks contributions must be paid prior to the issue of a Development Permit for Operational
       Works.
       Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
       contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
       In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
       the contribution or trading bank guarantee will be returned.
Site Stability
85.    A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, determine the
       soil classification, establish whether any measures are required to protect the stability of adjoining
       buildings and/or structures, and make recommendations on the type of foundation system (including
       retaining wall structures) best suited for the proposed development. This information shall be submitted to
       the Council for assessment and approval prior to obtaining a Development Permit for Operational Works.

Earthworks

86.    A Geotechnical engineer must be on site to supervise and direct all excavation works, and foundation
       constructions (i.e. Level 1 supervision in accordance with AS3798-1996). Such work shall only be carried
       out during dry weather conditions. Should any risk of soil movement occur - all work shall be suspended
       until steps (approved by the Geotechnical engineer in conjunction with Council’s Manager of Building
       Services) have been taken to ensure that no further slippage will result.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 11

NOOSA COUNCIL IDAS Development Application Decision Notice                                       11 of 24


87.    Boundary wall movement shall be monitored throughout construction and if movement occurs -
       construction is to be stopped immediately and appropriate action is to be taken to arrest the movement.
       Further work shall only take place after a re-assessment of the conditions on site by the Geotechnical
       engineer and Noosa Council’s Manager of Building Services.

88.    Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
       structures that border the development site. In this regard any fences to be replaced shall be clearly
       shown on the plans submitted for Operational Works approval. Fences that are affected shall be replaced
       prior to the Building Certifier issuing the Certificate of Classification.

89.    The builder, landscaper and all workers associated with the construction of the proposed development
       shall at all times comply with the directions of the Geotechnical engineer and the reasonable and lawful
       directions of Council officers.

90.    Any filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
       Engineering Design Standards Manual and so as not to cause the ponding of water on any adjoining
       lands or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating
       natural surface levels and contours of the adjoining properties must be provided with the application for a
       Development Permit for Operational Works for Filling and Drainage.

91.    A Registered Professional Engineer Queensland shall certify all designs and certify that he or she has
       supervised all engineering works and that all works have been completed in a workmanlike manner in
       accordance with the Australian Standards and good engineering practice.
Construction Issues
92.    A Construction Management Plan (including a Traffic Management Plan) addressing all construction
       phases shall be prepared by suitably qualified persons in consultation with the Peregian Beach Business
       Association and submitted to Council for approval prior to obtaining a Development Permit for Operational
       Works. The report should aim to address every foreseeable problem that is likely to occur during the
       construction process and include recommendation on how these can be overcome or minimised and shall
       also address parking for construction workers.
       To ensure construction is undertaken appropriately, the Construction Management Plan shall also include
       a section written by a Geotechnical engineer addressing the excavation and surrounding site support
       systems.
93.    A Condition Survey is to be carried out on adjoining buildings, structures and services prior to any
       excavation or construction works taking place on site. If distress already exists, a photographic survey
       shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
       implemented. A copy of this report is to be submitted to Council within 5 business days of the survey and
       prior to construction work proceeding.
       This report will be held by Council until all work is completed and will be used for verification purpose and
       to ensure that all buildings, structures and services are left in at least the same state as before
       construction commenced.
94.    The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
       use of vibrating installation techniques for sheet piling and other construction vibrations caused by
       excavating, earthmoving or demolition machinery or other similar construction techniques) unless
       approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator
       of such equipment shall at all times comply with the directions of the Geotehcnical engineer and the
       reasonable and lawful directions of Council officers.
       The proposed use of such equipment shall be detailed in any application for a Development Permit for
       Operational Works.
Erosion and Sediment Control
95.    Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
       control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
       waste, will be necessary.
     In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
     to the Council for approval prior to obtaining a Development Permit for Operational Works.
General
96.    A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
       specifications for all engineering works that will become Council infrastructure, which shall be submitted in
       conjunction with an application for a Development Permit for Operational Works. In this regard a
       DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
       with any application for Operational Works.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 12

NOOSA COUNCIL IDAS Development Application Decision Notice                                        12 of 24


97.    Digital detailed design drawings and calculations shall be submitted with any application for a
       Development Permit for Operational Works in respect of roadworks and stormwater drainage works. To
       avoid conflict with underground pipes or services, all existing and proposed services required by the
       development shall be shown on the plans.

98.    To facilitate production of As Constructed drawings it is suggested that all design drawings are submitted
       in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are
       available at www.adac.com.au).

99.    Any damage caused to any public utility during the course of construction shall be repaired to Council’s
       standards and at no cost to Council.

100.   Any alteration of any public utility or other facilities necessitated by the development of the land or
       associated construction works external to the site shall be at no cost to Council.

101.   The transportation of all materials to and from the site shall be undertaken in a manner such that no
       particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
       be covered to prevent materials including dust being windblown from the vehicle.

102.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design
       intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services
       and structures. All of which shall be submitted to Council for checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to drainage structures,
       finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
       As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
       www.adac.com.au).
       Approval of works shall not be granted until all As Constructed information has been supplied and
       accepted by Council.
Environmental Health
103.   Waste storage and disposal facilities must generally comply with Planning Scheme Policy No:9 “Waste
       Management Multi-Dwellings and Commercial and Industrial Premises”.

104.   The waste storage area at David Low Way is to be relocated and serviced from Kingfisher Drive. The
       additional waste storage area is to be shown on the site plan.

105.   The external bin wash area (4m x 2m) at the eastern end of the complex is to be provided with;

       105.1. Approved screening to the northern and eastern sides;

       105.2. Cold water tap, hose and drain outlet connected to the sewer.

106.   The off-street refuse pick-up bay in Kingfisher Drive is to be increased in length in a southerly direction to
       suit the length of a refuse vehicle, of a minimum of 11 metres. Clear turning circles must be met.

107.   The waste storage area at the rear of the restaurant is to be provided with mechanical exhaust ventilation,
       as natural ventilation is not permitted in the Acoustic Consultant’s Report.

108.   On-site litterbins are to be provided within each courtyard.

109.   Four combined street litterbins and smokers bins to a design approved by Council’s Environmental Health
       Section shall be supplied and installed at the developers expense at the following locations:-

       109.1. On or near the footpath area at the end of the Pedestrian Arcade adjacent to the David Low
              frontage of the site;

       109.2. On or near the footpath area adjacent to the pedestrian crossing along the Kingfisher Drive
              frontage of the site; and

       109.3. On or near the footpath area adjacent to both courtyards W and E along the Heron Street frontage
              of the site.

       Details of the location and design of these shall be submitted to Council for approval prior to the issuing of
       Operational Works.



A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 13

NOOSA COUNCIL IDAS Development Application Decision Notice                                        13 of 24


110.    Refuse containers must be provided in accordance with the requirements of the Environmental Protection
        (Interim Waste) Regulation 1996 and (Waste Management) Regulation 2000, for the storage and
        collection of refuse.

Noise

111.    Strict compliance with the Acoustic Consultant’s TTM Consulting P/L. Report No: 50596 dated September
        2005, 20 December 2005 and 21 February 2006. Upon completion of the development and prior to any
        occupation, the Acoustic Consultant is to provide written certification to Council that the development is in
        accordance with their recommendations.

112.    Submission of a further acoustic report to Council for approval prior to the issue of a development consent
        for building works, that shows final details of the noise control measures for the car park exhaust,
        restaurants cooking, refrigeration and waste storage room ventilation systems and compliance with
        Council’s Local Law 12 – Control of Nuisances and the Environmental Protection Regulation 1998.

113.    An acoustic barrier is to be provided on the roof above the restaurants in accordance with the Acoustic
        Consultant’s TTM Consulting P/L Report No. 50596 dated 21 February 2006.

114.    The eastern ground floor outdoor dining area is not to be used after 10pm. All patrons are to leave this
        area prior to 10pm, and restaurant doors leading to this area kept closed after 10pm.

115.    The exhaust ventilation ducts from the restaurants must be relocated a minimum 6 metres from the
        northern boundary.

116.    The proposed fixed glazing to the eastern external wall of Apartment 3 is to be of sufficient density to
        prevent noise nuisance from patrons and music noise from the two restaurants.

117.    All plant, equipment or motors for the basement air intake are to be located within the basement car
        parking area.

118.    Noise emission from air conditioning equipment shall comply with the following requirements:

        118.1. The equipment shall be installed and located in a manner that prevents excessive noise in
               accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-the-
               spot fines) may apply for offences.

        118.2. Submission of written certification from a suitably qualified person confirming that the noise levels
               comply when measured at either the residential boundary or outside the most exposed part of an
               affected building, whichever is the closest to the equipment. This is required immediately after
               installation of the equipment and prior to any occupation of the building, and in a format approved
               by Council.

        118.3. A person must not use equipment on any day if it makes or causes noise to be made –

               118.3.1.   From 10pm to 7am: More than the lower of either –

                               40 dB(A)

                               3 dB(A) above the background noise level

               118.3.2.   From 7am to 7pm: More than the lower of either –

                               50 dB(A)

                               5 dB(A) above the background noise level

               118.3.3.   From 7pm to 10pm: More than 3 dB(A) above the background noise level.

Trade Waste

119.    Liquid waste generated by industry, small business and commercial enterprises is referred to as Trade
        Waste and shall comply with the following:




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 14

NOOSA COUNCIL IDAS Development Application Decision Notice                                      14 of 24


       119.1. A Trade Waste Permit shall be obtained prior to the discharge of trade waste to Council’s
              sewerage system.

       119.2. All trade waste requirements complying with Council’s Trade Waste Policy and including pre-
              treatment devices, must be shown on hydraulic plans submitted to Council for approval prior to
              issuing the development permit for building work.

       119.3. Vehicular access shall be provided to each grease arrestor and/or pre-treatment device for
              cleaning and servicing by Council’s contractor, and must allow vehicles to enter and leave the site
              in a forward direction. Where access is restricted, a pump out line to an approved location is
              required.

       119.4. Trade waste requirements must be in place, inspected and approved prior to commencement of
              trading or operation.

120.   Bin washing areas for commercial and industrial developments exceeding 600mm x 600mm shall be
       roofed and the floor fall to a bucket trap prior to discharge to the sewer. Rainwater should be excluded
       from the bin washing area. Bin washing should take place only at the bin washing area.

121.   Each restaurant must be provided with its own 1000lt grease arrestor as follows;

       121.1. Located in the basement car park floor directly beneath the restaurants

       121.2. Be provided with trafficable lids

       121.3. Be provided with draw-off lines to a common location in the landscaped area adjoining Kingfisher
              Drive.

122.   Future food premises eg; café, coffee shop, take-away are required to have specific trade waste facilities
       including a dedicated sewerage line connected to a grease arrestor located at the eastern end of the
       basement car park. A common grease arrestor of 2000 litres may be shared. These facilities should be
       installed during the initial construction stage, otherwise certain types of food premises may not be able to
       be approved in the future.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 15

NOOSA COUNCIL IDAS Development Application Decision Notice                                      15 of 24


                                        RECONFIGURE A LOT
123.   Deleted.

124.   The lot reconfiguration / amalgamation shall generally be in accordance with proposal plan S05-0123.1,
       dated 19/09/05 by Urban Strategies, except as modified herein.

125.   For the purpose of conditions contained within this permit, a Plan of Survey means the plan for the
       reconfiguration of a lot required to be endorsed by Council pursuant to S3.7.1 of the Integrated Planning
       Act 1997.

126.   In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal documentation
       shall be presented to Council and shall be submitted in the correct form with the fees prescribed in
       Council's adopted fee schedule.

127.   Prior to Council endorsing the Plan of Survey, a duly executed copy of any required Grant of Easement
       shall be submitted to Council for perusal.
       Any changes required by Council’s Solicitor shall be attended to prior to endorsing the Plan of Survey.
       Any necessary Titles Office forms requiring the consent of Council is to be submitted prior to the
       endorsing of the Plan of Survey.
128.   Prior to the endorsement of the Plan of Survey, the Applicant's Solicitor shall give Council's Solicitor an
       appropriate undertaking in writing that in conjunction with lodgement of the Plan of Survey at the Land
       Titles Office, the Title Deed and the easement documents will also be lodged and any additional Titles
       Office forms or requisitions requiring the consent of Council being attended to forthwith.

129.   Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and charges due and
       payable to Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of
       the Plan of Survey.

130.   Deleted

131.   Deleted.

Additional Conditions 15/06/06

                             MATERIAL CHANGE OF USE OF PREMISES

132.   Payment of a contribution to Council in lieu of two (2) off-street car parking spaces in accordance with
       Council’s Policy on Cash Contributions in Lieu of the provision of Off Street Carparking, prior to issue of
       Operational Works Approval. Such payment shall be in accordance with the contribution rate adopted by
       Council at the time the application was lodged and shall total $21,380.00.

133.   Prior to the use commencing, a certificate from a registered Professional Civil Engineer shall be submitted
       to Council for each Development Permit for Operational Works issued pursuant to this permit. The
       engineer shall certify that he has supervised those works and that they have been completed in a
       workman like manner in accordance with good engineering practice and in accordance with that permit.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 16

NOOSA COUNCIL IDAS Development Application Decision Notice                                      16 of 24




                                    Concurrence Agency Conditions –
                                    Environmental Protection Agency
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 17

NOOSA COUNCIL IDAS Development Application Decision Notice                                      17 of 24




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 18

NOOSA COUNCIL IDAS Development Application Decision Notice                                      18 of 24




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 19

NOOSA COUNCIL IDAS Development Application Decision Notice                                      19 of 24




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 20

NOOSA COUNCIL IDAS Development Application Decision Notice                                         20 of 24



                                     Local Laws, Policies & State
                                     Regulation Requirements
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      The applicant is informed that approval of this development application will trigger an Infrastructure
        Charge in accordance with the Coastal Major Road Network Infrastructure Charges Plan for the estimated
        amount of $242,458 and is subject to variations in the Consumer Price Index, All Groups Brisbane from
        December 2005 until the date of payment. An Infrastructure Charge Notice will be issued in accordance
        with Chapter 5 of the Integrated Planning Act 1997.

2.      It is recommended that the applicant incorporate the principles of Council’s TravelSmart Noosa Program
        to encourage mode shift and create improved access to the development.

3.      The applicant is informed that payment via credit card transaction will not be an acceptable method of
        payment for development contributions conditioned in this permit or for infrastructure charge notices
        issued separately.

4.      The applicant is advised that a Compliance Permit for all plumbing and drainage works within the
        boundaries of the development site shall be obtained from Council’s Plumbing Services Section prior to
        obtaining a Development Permit for Building Works.

5.      Where any food premises is to be included in the development, the following is required:

        5.1.   Plans and an application should be made to Council’s Environmental Health Section for approval
               prior to any building approval, fitting out or use of the premises.

        5.2.   Construction and use of the food premises should comply with Council’s Food Premises Policy and
               the Food Safety Standards.

        5.3.   Toilets for customers and staff should be provided in accordance with the Building Code of
               Australia. Obtain advice from a building certifier.

        5.4.   Plans and approval is required for any mechanical exhaust ventilation system which should comply
               with AS1668. A certificate is required from the installer certifying the system complies with the
               Standard.

        5.5.   Licence and registration is required for any food premises listed in Schedule 1, Food Hygiene
               Regulation 1989, prior to use of those premises.

        5.6.   A detailed statement indicating the purpose of the food premises, type of food sold, proposed
               menu and number of persons served, is to accompany the plans approval application.

6.      The number of patrons for each of the restaurants will be determined by the size of the kitchen and the
        adequate provision of all other required facilities.

7.      A mechanically ventilated air-lock may be required between the waste storage room and the “back of
        house” area of the ground floor restaurant.

8.      The operator of any body piercing or tattooing business should comply with the Public Health (Infection
        Control for Personal Appearances Services) Act 2003 and:

        8.1.   Obtain a licence to operate prior to commencing the use.

        8.2.   Comply with the Infection Control Guidelines of the Act.

        8.3.   Premises to comply with the standard in Part 15 of the Queensland Development Code.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 21

NOOSA COUNCIL IDAS Development Application Decision Notice                                       21 of 24


9.     The operator of any beauty treatment and/or hairdressing business should comply with the Infection
       Control Guidelines of the Public Health (Infection Control for Personal Appearances Services) Act 2003.

10.    All refrigeration plant including motors, should be situated within the building or suitably provided with
       noise reduction measures and located as to prevent a noise nuisance in accordance with the nuisance
       provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such offences.

11.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement,
       concrete, builder’s waste or rubbish should not be permitted to enter or be placed where it could
       reasonably be expected to move into a roadside gutter, storm water drain or a watercourse. On the spot
       fines apply for such offences.

12.    The plans for the proposed building work have not been assessed for compliance with the requirements of
       the Building Code of Australia as they relate to people with disabilities. Your attention is drawn to the
       matter that either or both the Disability Discrimination Act 1992 (commonwealth) and the Anti-
       Discrimination Act 1991(Queensland) may impact on the proposed building work.

       Noosa Council recommends that the following matters be considered to address equitable access and
       facilities in the building:

       12.1. The building and environs should be designed to meet the requirements of the Human Rights and
             Equal Opportunity Commission “Advisory Notes on Access to Premises” and AS1428.2;

       12.2. Applicants should be aware that a “Disability Standard on Access to Premises is being developed
             and most likely will result in changes to the Building Code of Australia;

       12.3. Any services and facilities in the building complex must allow independent, dignified and equitable
             use of the services and facilities for all people.

13.    This proposal has not been assessed in relation to the spread of fire between properties / buildings. It is
       the building certifiers responsibility to assess the requirements for fire services, fire separation and
       appropriate methods of construction as part of the building works approval process. Referral to the
       Queensland Fire and Rescue Service (QFRS) may be required as part of the Building Approval process.

14.    Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa
       Council’s Plumbing Services Section in accordance with the Plumbing & Drainage Act 2002 (as
       applicable).

15.    Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
       operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
       accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
       Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
       requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
       works must be submitted to Council with the lodgement of any application for operational works over the
       site.

16.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law
       No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that
       makes or causes audible noise to be made from the building work:-

       16.1. On a Sunday or public holiday, at any time; or

       16.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
       A maximum penalty of $1,500 applies to an offence under this legislation.




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 22

NOOSA COUNCIL IDAS Development Application Decision Notice                                      22 of 24



                                    List of Submitters
                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION



BF Murphy        Murmag Peregian Holdings        PO Box 26               NOOSA HEADS QLD 4567




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 23

NOOSA COUNCIL IDAS Development Application Decision Notice                                              23 of 24



                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

   The following is an extract from the Integrated                           (6) If an application involves assessment against
   Planning Act (Chapter 4).                                              a concurrence agency code, appeal rights for
                                                                          submitters for the application are not available
   Division 8 - Appeals to                   court      relating     to   against the part of the approval that represents the
   development applications                                               concurrence agency’s response for the code.
   Appeals by applicants                                                  Appeals by advice agency submitters
   4.1.27.(1) An applicant for a development application                  4.1.29.(1) An advice agency may, within the limits of
   may appeal to the court against any of the following-                  its jurisdiction, appeal to the court about the giving of
   (a) the refusal, or the refusal                 in   part,   of   a    a development approval for a development
       development application;                                           application if-

   (b) a matter stated in a development approval,                         (a) the development application involves impact
       including any condition applying to the                                assessment; and
       development, and the identification of a code                      (b) the advice agency told the applicant and the
                            1
       under section 3.1.6;                                                   assessment manager to treat its response to the
   (c) the decision to give a preliminary approval when a                     application as a submission for an appeal.
       development permit was applied for;                                   (2) The appeal must be started within 20 business
   (d) the length of a currency period;                                   days after the day the decision notice or negotiated
                                                                          decision notice is given to the advice agency as a
   (e) a deemed refusal.                                                  submitter.
      (2) An appeal under subsection (1)(a) to (d) must                   Appeals for matters arising after approval given
   be started within 20 business days (the “applicant’s                   (co-respondents)
   appeal period”) after the day the decision notice or
   negotiated decision notice is given to the applicant.                  4.1.30.(1) For a development approval given for a
                                                                          development application, a person to whom any of
       (3) An appeal under subsection (1)(e) may be                       the following notices have been given may appeal to
   started at any time after the last day a decision on the               the court against the decision in the notice-
   matter should have been made.
                                                                          (a) a notice giving a decision on a request for
   Appeals by submitters                                                      extension of the currency period for an approval;
   4.1.28.(1) A submitter for a development application                   (b) a notice giving a decision on a request to make a
   may appeal to the court about-                                             minor change to an approval.
   (a) the giving of a development approval, including                        (2) The appeal must be started within 20 business
       any conditions (or lack of conditions) or other                    days after the day the notice of the decision is given
       provisions of the approval; or                                     to the person.
   (b) the length of a currency period for the approval.                        (3) Subsection (1)(a) does not apply if the
                                                                          approval resulted from a development application
       (2) The appeal must be started within 20 business                  (superseded planning scheme) that was assessed as
   days (the “submitters appeal period”) after the day                    if it were an application under a superseded planning
   the decision notice or negotiated decision notice is                   scheme.
   given to the submitter.
                                                                             (4) Also, a person who has made a request
      (3) If a person withdraws a submission before the                   mentioned in subsection (1) may appeal to the court
   application is decided, the person may not appeal the                  against a deemed refusal of the request.
   decision.
                                                                              (5) An appeal under subsection (4) may be
      (4) If an application involves both impact                          started at any time after the last day the decision on
   assessment and code assessment, appeal rights for                      the matter should have been made.
   submitters are available only for the part of the
   application involving impact assessment.                               Division 9 - Appeals to court about other matters
       (5) If an application is processed under section                   Appeals for matters arising after approval given
   6.1.28(2), appeal rights for submitters for the                        (no co-respondents)
   application are available only for the aspects of the
   development that would have required public                            4.1.31.(1) A person to whom any of the following
   notification under the repealed Act.                                   notices have been given may appeal to the court
                                                                          against the decision in the notice-
                                                                          (a) a notice giving a decision on a request to change
                                                                              or cancel a condition of a development approval.
   1
        Section 3.1.6 (Preliminary approval may override local planning
       instrument)



A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Page 24

NOOSA COUNCIL IDAS Development Application Decision Notice                                      24 of 24

                                      2
(b) a notice under section 6.1.44 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




A c:\docume~1\tblogg\locals~1\temp\bcl technologies\easypdf 5\@bcl@6c06e85a\@[email protected]

Used in these records

About this file

File size
339 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

05_1917 - SUPERSEDED Compiled Decision Notice [As Published].pdf · 339 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.