Original source · versioned page text
4-12 Bottlebrush Avenue -Noosa central. Drawings - Minor change application
Remove timber pergola, aluminium balustrade,
4 3 2 1
zincalume roof and gutter, gate and lattice
screens
Exit
Exit
Exit
Exit
Exit
62
loading bay Existing driveway and car park
44
remove equitable car
remove existing concrete kerb and equitable car park Remove existing brick paving and
park
drainage outlets for upgarde previous approval bed - shown hatched remove existing concrete kerb and
45 drainage outlets for upgarde
remove equitable car
park
48 49 50 51 52 53 54 55 56 57 58 59 60 61
46
4 3 2 1
47
works subject to Minor change
Boundary
application shown red dashed
remove existing non- remove all existing elements shown dashed remove existing non-
compliant stair compliant ramp and
Bottelbrush Avenue remove trees shown dashed
timber retaining wall
FLEXURE Pty Ltd USE FIGURED DIMENSIONS. ISSUE AMMENDMENT Title
CLIENT
THE BODY CORPORATE OF NOOSA CENTRAL DO NOT SCALE FROM THE date details
PLAN G EXIST, DEMOLITION
DRAWINGS. CONFIRM ALL Date 11 October 2024
GRANT CALDER ARCHITECTURE AND URBAN DESIGN DIMENSIONS ON SITE PRIOR
TO CONSTRUCTION OR
FABRICATION. IT REMAINS Scale
PROJECT NOOSA CENTRAL STAGE 2, 6 Bottlebrush Avenuen Noosa Junction THE CONTRACTORS
RESPONSIBILITY TO ENSURE Drawn Grant Calder
21 Bursaria Street Peregian Beach
ph: 0488 084 184 - ALTERATIONS AND IMPROVEMENTS - SCHEMATIC DESIGN COMPLIANCE WITH ALL
RELEVANT CODES AND
email - [email protected] REGULATIONS IS Checked Grant Calder
Registered Architect- BOAQ 3112 MAINTAINED AT ALL TIMES.
Drawing No GC 138 SD 02 Issue - 0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.