Skip to the record
Accept no substitutions.

Council archive · source document

05/1148 - Amended Concurrence agency response [As Published] · 132005.1148.03

of 3

Text shows just the words. Original shows the document exactly as it was published.

                                                                                     Notice
                                                        Amended Concurrence Agency Response

4.       General advice to assessment manager
         (1) DERM does not consider the pool to be of demountable construction.

         (2) DERM advises that due to the site being situated in an Erosion Prone Area, that the removal of
             or damage to vegetation outside the boundaries of the subject site for any purpose, including
             beach access or view improvement would detrimentally impact on the level of erosion.

Pursuant to sections 334 and 363 of the Act, a copy of a decision notice or negotiated decision notice issued
by the assessment manager must be forwarded to DERM as a referral agency for the relevant application at
GPO 2454, Brisbane Qld 4001 and an electronic copy to eco.access(Wderm.g/d.gov.au.


The State's Native Title Work Procedures provide that responsibility for assessment of native title issues for
an IDAS application rests with the assessment manager. Therefore, DERM as a referral agency for the
relevant application has not provided notification to native title parties.


5.       Conditions
         (1) Only acceptable temporary or relocatable structures for safety and recreational purposes are
               permitted seaward of the Coastal Building Line.

         (2) No cantilevered structures shall protrude more than 3.Om over the Coastal Building Line.

         (3) Native, shade-tolerant coastal species are to be planted in the area shaded by the cantilevered
              structures to assist in the stability of the site.

         (4) Existing native trees on site are to be retained except where required to be removed due to
             building operations.

         (5) Native coastal species are to be planted seaward of the Coastal Building Line to reduce any
             potential impacts of natural coastal processes on the site.

                                                       END OF CONDITIONS




Delegate                                                            Enquiries:
Ben Sale                                                            Joline Lalime
Manager (Sunshine Coast)                                            Environmental Services North
Environmental Services North                                        South East Region
South East Region                                                   Department of Environment and
Department of Environment and Resource                              Resource Management
Management                                                          PO Box 168, Cotton Tree Q 4558
                                                                    Phone: 07 5459 6135
                                                                    Fax:     07 5443 9927
                                                                    Email: [email protected]




Page 2 of 2 • 091217                                               Department of Environment and Resource Management

Used in these records

About this file

File size
761 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

05_1148 - Amended Concurrence agency response [As Published].pdf · 761 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.