                       AGENDA


             General
         Committee Meeting


             Monday, 15 February 2021

                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2021-02-15 General Committee Meeting Agenda(PDF, 2MB).pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 42 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                              15 FEBRUARY 2021


TABLE OF CONTENTS

ITEM                                                                         PAGE

1      ATTENDANCE & APOLOGIES                                                   3

2      CONFIRMATION OF MINUTES                                                  3

3      PRESENTATIONS                                                            3

4      DEPUTATIONS                                                              3

5      ITEMS REFERRED FROM COMMITTEES                                           3

       1    MCU20/0103 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF
            USE FOR SHOP AND SHORT TERM ACCOMMODATION AT 13 NOOSA
            DRIVE, NOOSA HEADS                                                  3

       2    MCU20/0115 - APPLICATION FOR MATERIAL CHANGE OF USE FOR
            SHORT TERM ACCOMMODATION AT 3 ROBERT STREET, NOOSAVILLE             3

       3    MCU18/0009.03 - OTHER CHANGE TO DEVELOPMENT APPROVAL FOR
            MATERIAL CHANGE OF USE - MULTIPLE HOUSING –TYPE 3 RETIREMENT
            & SPECIAL NEEDS AT 186 COOROY-NOOSA ROAD & 4 CARRAMAR ST,
            TEWANTIN                                                            3

       4    MCU18/0166 – PLANNING & ENVIRONMENT COURT APPEAL NO. BD897
            OF 2020 – REFUSAL OF AN APPLICATION FOR SERVICE & UTILITY TYPE
            3 (TOWER) AT 244 TABLELANDS RD, COORAN                              3

       5    DRAFT BUSHLAND RESERVE STRATEGIC MANAGEMENT PLANS                   4

       6    MOBILE LIBRARY REPLACEMENT PLAN                                     4

       7    COMMERCIAL HIGH USE PERMITS – TENDER PROCESS                        4

       8    NOOSA CHAMBER OF COMMERCE AND INDUSTRY INC. EXEMPTION
            REQUEST FOR THE PROVISION OF ALCOHOL FOR TEMPORARY EVENTS
            DURING COVID-19 PANDEMIC                                            4

       9    TOURISM NOOSA 2019-20 ANNUAL REPORT                                 4

6      REPORTS DIRECT TO GENERAL COMMITTEE                                      5

       10   NOOSA COMMUNITY SUPPORT CLEANING TENDER ASSESSMENT –
            2021T081                                                            5

       11   GO NOOSA PEAK PERIOD TRAFFIC MANAGEMENT – EASTER 2021              10

       12   DEBT POLICY REVIEW                                                 22

       13   FINANCIAL PERFORMANCE REPORT – JANUARY 2021                        30

7      CLOSED SESSION                                                    43




                                                                     Page 2 of 43

Section 3

GENERAL COMMITTEE MEETING AGENDA                                                  15 FEBRUARY 2021



1   ATTENDANCE & APOLOGIES




2   CONFIRMATION OF MINUTES

    The Minutes of the General Committee Meeting held on 18 January 2021 be received and
    confirmed.


3   PRESENTATIONS

    Nil.


4   DEPUTATIONS

    Nil.


5   ITEMS REFERRED FROM COMMITTEES
    PLANNING & ENVIRONMENT COMMITTEE

    1      MCU20/0103 - DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
           FOR SHOP AND SHORT TERM ACCOMMODATION AT 13 NOOSA DRIVE, NOOSA
           HEADS
           (Planning & Environment Committee Agenda, 9 February 2021, Item 1, Page 4)
           Reason for referral – Significance of the issue


    2      MCU20/0115 - APPLICATION FOR MATERIAL CHANGE OF USE FOR SHORT
           TERM ACCOMMODATION AT 3 ROBERT STREET, NOOSAVILLE
           (Planning & Environment Committee Agenda, 9 February 2021, Item 2, Page 35)
           Reason for referral – Significance of the issue


    3      MCU18/0009.03 - OTHER CHANGE TO DEVELOPMENT APPROVAL FOR
           MATERIAL CHANGE OF USE - MULTIPLE HOUSING –TYPE 3 RETIREMENT &
           SPECIAL NEEDS AT 186 COOROY-NOOSA ROAD & 4 CARRAMAR ST,
           TEWANTIN
           (Planning & Environment Committee Agenda, 9 February 2021, Item 3, Page 52)
           Reason for referral – Significance of the issue


    4      MCU18/0166 – PLANNING & ENVIRONMENT COURT APPEAL NO. BD897 OF
           2020 – REFUSAL OF AN APPLICATION FOR SERVICE & UTILITY TYPE 3
           (TOWER) AT 244 TABLELANDS RD, COORAN
           (Planning & Environment Committee Agenda, 9 February 2021, Item 5, Page 67)
           Reason for referral – No quorum at P&E Committee due to conflict of interest declarations



                                                                                           Page 3 of 43

Section 4

GENERAL COMMITTEE MEETING AGENDA                                          15 FEBRUARY 2021


   5   DRAFT BUSHLAND RESERVE STRATEGIC MANAGEMENT PLANS
       (Planning & Environment Committee Agenda, 9 February 2021, Item 6, Page 76)
       Reason for referral – Significance of the issue


   SERVICES & ORGANISATION COMMITTEE

   6   MOBILE LIBRARY REPLACEMENT PLAN
       (Services & Organisation Committee Agenda, 9 February 2021, Item 1, Page 4)
       Reason for referral – Significance of the issue


   7   COMMERCIAL HIGH USE PERMITS – TENDER PROCESS
       (Services & Organisation Committee Agenda, 9 February 2021, Item 2, Page 16)
       Reason for referral – Significance of the issue


   8   NOOSA CHAMBER OF COMMERCE AND INDUSTRY INC. EXEMPTION REQUEST
       FOR THE PROVISION OF ALCOHOL FOR TEMPORARY EVENTS DURING COVID-
       19 PANDEMIC
       (Services & Organisation Committee Agenda, 9 February 2021, Item 3, Page 21)
       Reason for referral – For further consideration


   9   TOURISM NOOSA 2019-20 ANNUAL REPORT
       (Services & Organisation Committee Agenda, 9 February 2021, Item 11, Page 76)
       Reason for referral – Significance of the issue




                                                                                     Page 4 of 43

Section 5

GENERAL COMMITTEE MEETING AGENDA                                              15 FEBRUARY 2021


6    REPORTS DIRECT TO GENERAL COMMITTEE


10   NOOSA COMMUNITY SUPPORT CLEANING TENDER ASSESSMENT – 2021T081

Author            Community Facilities Manager, Ash Saward
                  Community Services Department

Index             ECM/ Subject/ 1.05 Community Support Management

Attachments       1.   2021T081 – NCS Cleaning Tender Evaluation Summary



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Community Facilities Manager to the General Committee
meeting dated 15 February 2021 and award separable portions 1 and 2 of tender 2021T081 to
R&R McKindlay Trust, trading as Ecovia, through to 30 June 2022, with an option for 3 x 12 month
renewals to the contract upon expiration of the initial contract period.



REPORT
This report outlines the tender process for the provision of cleaning services for the Noosa
Community Support (NCS) Centre and also for domestic assistance cleaning in NCS clients’
homes. These services were procured by a tender compromising two separable portions for the
respective services and it is recommended that Council awards the tender to R&R McKindlay Trust,
trading as Ecovia, for both separable portion 1 (NCS Centre cleaning) and separable portion 2
(domestic assistance cleaning).

1.   Tender Process

An invitation to tender was publicly advertised by Council via Council’s website, Newscorp’s digital
classifieds and Noosa Today print edition on 19 November 2020. All suppliers intending to lodge
a tender response were provided the opportunity to attend a site inspection and information session
on 24 November 2020.

2.   Tender Assessment

Eight (8) conforming tenders were received and the tender evaluation panel carried out an
assessment of these submissions from the following suppliers:

1)   Achieve Cleaning Services Trust                 Separable portion 1 and 2
2)   Advanced National Services Pty Ltd              Separable portion 1 and 2
3)   Brit Cleaning Services                          Separable portion 2 only
4)   Jim’s Cleaning Gympie Gold                      Separable portion 2 only
5)   Korgi Cleaning Services                         Separable portion 2 only
6)   Quality Commercial Cleaning Pty Ltd             Separable portion 1 and 2
7)   R&R McKindlay Trust t/as Ecovia                 Separable portion 1 and 2
8)   Storm International Pty Ltd                     Separable portion 1 only

                                                                                      Page 5 of 43

Section 6

GENERAL COMMITTEE MEETING AGENDA                                               15 FEBRUARY 2021



The tenders were evaluated using the following criteria:
     Capability and resourcing
     Contract experience and capacity
     Methodology
     Quality
     Health and safety
     Environment and sustainability
     Contribution to local economy
     Price

The evaluation methodology considered non-price elements (75% of the score) and a price
component (25% of the score). The price assessment was based on submitted hourly rates, as per
the tender’s requirement. Given the nature of required service delivery, particularly that of domestic
assistance which requires the contractor’s staff to independently attend homes of vulnerable, frail
aged NCS clients, non-price elements of the assessment were key to the overall evaluation
outcome.

3.     Submissions

There were considerable variances to the quality of submissions, with some respondents failing to
address key response areas or providing only limited information.

The tenders were evaluated using the Evaluation Matrix at Attachment 1, with Ecovia scoring the
highest for both separable portions and demonstrating a strong ability to deliver all requirements
of the contract.

While other suppliers submitted tenders with lower pricing, Ecovia demonstrated significantly
higher capability in many of the non-price elements. They also showed a much greater
understanding of the unique requirements of the contract and comprehensively demonstrated how
their company could help meet Council’s needs.

Ecovia is a progressive, locally owned and operated company with a focus on environmentally
sustainable cleaning services. They have an existing team of local, long-term staff who have pride
for their community and capacity to deliver the requirements of this contract. The company offers
a range of systems and processes designed to deliver high quality outcomes to clients and they
clearly demonstrated their ability to continuously improve service delivery in their submission.
Ecovia have a strong track record delivering cleaning services to other Council teams and facilities
and are very well regarded.

The assessment panel was impressed by Ecovia’s commitment to rewarding and retaining good
staff and was pleased to see that many staff hold aged care certifications which will be of great
benefit when visiting and connecting with NCS clients.

Ecovia’s submission provided the assessment panel with a great deal of comfort regarding their
ability to competently deliver services to vulnerable, frail aged clients and the excellent safety
measures they already have in place will meet the requirements of both Council and NCS funding
bodies.

Previous Council Consideration
Nil.




                                                                                        Page 6 of 43

Section 7

GENERAL COMMITTEE MEETING AGENDA                                                   15 FEBRUARY 2021


Finance
NCS is funded by state and federal funding programs, with a vast majority of the funding for centre
cleaning and domestic assistance coming from the federal Commonwealth Home Support
Programme (CHSP). The available funding within this program is sufficient to cover the costs
associated with the award of this contract through to 30 June 2022. Activation of further contract
options will be subject to continuation of funding and satisfaction with the contractor’s performance.

Risks & Opportunities
One of the main risks relating to this contract is that of the contractor’s staff attending vulnerable
and frail aged NCS clients’ homes alone. These risks are not insignificant, particularly given that
the home visits occur offsite and without direct supervision. Management are cognisant of this risk
and believe that Ecovia have adequate systems and processes in place, including training, regular
site visits and assessments, to mitigate the risk as much as could be reasonably hoped for. The
risk is also mitigated by requiring that all staff involved in delivering this contract hold a current,
clear police check.

Of course there is a great opportunity for Noosa’s seniors to receive invaluable assistance around
their homes from a local contractor who cares about their community and delivering a great service.
By contracting out this service, Council is able to engage specialists in this field to ensure services
are delivered to a high standard and in a manner that’s fully compliant with funding body
requirements.


Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
Departments/Sections Consulted:

       Chief Executive Officer   x   Community Services                      x   Corporate Services
       Executive Officer         x   Director                                    Director
       Executive Support             Community Development                   x   Financial Services
                                 x   Community Facilities                        ICT
                                     Libraries & Galleries                   x   Procurement
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

       Executive Services            Environment & Sustainable Development       Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                              Page 7 of 43

Section 8

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021


                                     ATTACHMENT 1




                                        Page 8 of 43

GENERAL COMMITTEE MEETING AGENDA                                   15 FEBRUARY 2021

                                                                           ATTACHMENT 1

 NAME OF TENDERER                      PRICE
  (Conforming Tenders Only)          (excl of GST)
1
2                                                                 SEPARABLE PORTION 1
3
4                                                                  NCS Centre Cleaning
5
i
Te
  NON-CONFORMING TENDERS                                                                ]
  [Commercial PropertyCleaning
 JNFCleaningService             CT     Cd      |
  [OceanPressureWashing CT
  Sal-Luka PropertyMaintenance |
  Total Control Services Pty Ltd               |
                                         1           2           3           4          5
          PART A - Non price elements
           .
                                      ervices ust ervices F d Lieaning Pty ita t/as Ecovia pty ita
                                                                  Resultant              Resultant
  Evaluation Criteria    Weighting (%)                            score x                 score x
 oma                  |          |   6 [os [wo [om [|u| s [us| @ | om |
                                           eight       eight’     weighting      i        eightin
fometowonseme        |           |   @ [om     [| om |» | me» [wml s |x|
   reso               |    tse    | wo | soo | oo | v0 | mo | soso | oo | sso | wo | sm |
  Cs ce
 feomasey             |         fs fm fw fm [| om [os [wl @ | om
   commas        | |» [a= [|= [as [oo [rs poof [om |
 foummvoaemm          |     om    | «| [w|em[o|om[ fouls ||
  exatecmictseore     |     tem   |     tas   |    sso    | sas       |    cozs | ass
          Normalised Technical Score (Tn)
           eaare-                               Advanced National | Quality Commercial |R&R McKindlay Trust| Storm International
                                        ces Trust Services Pty Ltd Cleaning Pty Ltd ‘as Ecovia Pty Ltd
  Total Fees (Pc)                                                $35
 Average Fees (Pav) $.....sccussee
 rice Score                         Pp ew ee fe
soma       sm                      ee fm ee
  Weighted Price Score (Pw)

      Total Score of price and non price elements

                                                                               Page 8 of 43

Section 9

Page 9 of 43

NAME OF TENDERER                     PRICE
 (Conforming Tenders Only)          (excl of GST)
1                                                                                      |
2                                                         SEPARABLE PORTION 2          |
3                                                                                      |
4                                                               DA Cleaning            |
5                                                                                      |
6 [Quality Commercial Cleaning Pty Ltd
7                                         $45.00
  NON-CONFORMING TENDERS
  Commercial Property Cleaning

 Sal-luka PropertyMaintenance
  Total Control Services Pty Ltd
                                        1           2           3          4          5           6          7
                                   Achieve Cleaning Advanced National  Jims Cleaning Korgi Cleaning Quality Commercial | R&R McKindlay Trust
          PARTA                                           Brit Cleaning Services ame          Cleaning Pty Ltd las Ecovia
          PART A - Non price elements Services Trust Servi                  Gold     Servi
                                        Resultant   Resultant   Resultant   Resultant  Resultant              Resultant
 Evaluation Criteria    Weighting (%)    score x     score x     score x    score x     score x               score x
                                        weighting   weighting   weighting   weighting  weighting              weighting
  Gor              pmo | om fo [om [wm | oo fo [rm fm | mf m | ins [ m9 | nso |
  conatoweeceay      |     we     | @ [emf @ | em [| [@ [om [= [ow [m [ow [ » | we |
  metnoctony     |e               | | coo Tw | om | oo | oo [ wo | soo [ so | as | 7 | 1050 | oo | 1350 |
 wry                   |   mm     | | so | oo | cm | o | oe | o | om | o | om | wo | soo | m | 700 |
  =                             [ee [ee        oe [oe [oe [ome fo Pom [i [om [ow [om                    oe [om |
  cwomenasannay      |     = |» | a [« [om [= | mf» |i [as [aw [ms [ow [ms | oo |
fount                | as         | | om [as | ox [om | wm [|r [s | so |                         [om |     | om |
 owarecwictscore      |     tse  |     tone  |    asas | tuso | anas            | aos,     |    saas | ego
         Normalised Technical Score (Tn)
            PART B - Price el                 Advanced National Brit Cleaning Servi Jims Cleaning KorgiCleaning | Quality Commercial | R&R McKindlay Trust
                                    Services Trust Services             Gympie Gold Services  Cleaning Pty Ltd t/as Ecovia
 Total Fees (Pc)                                               $44
 Average Fees (Pav) $........cccceene
  Price sare                     Po          |  eT                   | lm       | lc      fl
 Normalsed Pie Score (Po)        poe              te      ew tm |
  Weighted Price Score (Pw)

       Total Score of price and non price elements
                                                                                                          Page 9 of 43

Section 10

GENERAL COMMITTEE MEETING AGENDA                                             15 FEBRUARY 2021



11   GO NOOSA PEAK PERIOD TRAFFIC MANAGEMENT – EASTER 2021

Author           Project Officer – Transport Innovation, Joanna Ferris
                 Infrastructure Services Department

Index            ECM/ Subject/ Transport Policy
                 ECM/ Project & Contract/ Transport Strategy / Car Parking Management
                 ECM/Project & Contract/ Transport Strategy / General

Attachments      Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Project Officer – Transport Innovation to the General Committee
Meeting dated 15 February 2021, and:
A.   Approve the use of free travel on the temporary 065 Go Noosa Loop bus from 2 - 18 April
     2021.
B.   Subject to TransLink agreement, approve the use of free travel on the temporary 064
     Peregian Beach to Noosa Heads bus from 2 - 18 April 2021.
C.   Subject to TransLink agreement, approve the use of free travel on TransLink routes 628, 629
     and 632 from 2 - 18 April 2021.
D.   Delegate authority for the CEO to cancel, stand down and recommence the temporary 065
     Go Noosa Loop Bus, the temporary 064 Peregian Beach to Noosa Heads bus and TransLink
     routes 626, 627, 628, 629, 632 based on the professional advice from Council’s COVID
     Safety Team and seeking the input from Noosa Chamber of Commerce, Tourism Noosa, the
     Transport Strategy Steering Group and Hinterland Business Representatives including
     advice and information from the Queensland Government recommended COVID Safe Public
     Transport Plan as to suggested best practice and policy guidelines as their primary Terms of
     Reference.
E.   Approve the continued promotion of the Noosa Ferry in Go Noosa marketing as an alternative
     mode of travel.
F.   Approve the use of the Noosa AFL ground, The J car park and Noosa Junction Transit Centre
     as Park & Ride locations.
G.   Approve the use of Variable Message Signs (VMS) at key entry points to Noosa from 2 – 18
     April 2021 for the purpose of informing motorists of car parking availability and alternative
     travel options to the Hastings Street precinct.
H.   Approve the use of traffic control in the Hastings Street precinct and surrounding areas to
     manage vehicle and pedestrian movements from 2 - 18 April 2021 as required.
I.   Approve the use of wayfinding signage in the Hastings Street precinct, Noosa Junction and
     Noosaville from 2 - 18 April 2021.
J.   Approve the temporary conversion of 8 parallel car parks on the southern side of Hastings
     Street from the Hastings Street roundabout to 28 Hastings Street for other uses including,
     loading bays, bicycle and scooter parking, and increased footpath, from 2 - 18 April 2021
K.   Approve the continuation of the trial installation of 2 minute Drop & Go car parking bays in
     the Noosa Heads Precinct.

                                                                                    Page 10 of 43

Section 11

GENERAL COMMITTEE MEETING AGENDA                                            15 FEBRUARY 2021


REPORT
The purpose of this report is to seek Council approval for the implementation of the Go Noosa peak
period traffic management plan for the Easter holiday period from 2 – 18 April 2021.

Following on from Go Noosa Christmas 2020/21, Go Noosa Easter 2021 aligns with the 2017-2027
Transport Strategy principles and is designed to address peak period traffic whilst providing a
positive travel experience for both residents and visitors.

1.   Go Noosa Christmas 2020/21 Evaluation

In previous years the Go Noosa Christmas & Easter Peak Period Traffic Management Plans had
been presented and adopted by Council as a whole program to address peak period traffic with
evaluation undertaken following the analysis of data of both holiday periods. However, due to the
uncertainty presented by the Coronavirus pandemic during 2020 which saw the cancellation of
Easter program due to the lockdown, the Go Noosa Christmas 2020 & Easter 2021 Peak Period
Traffic Management Plans have been presented separately to allow consideration of the Covid
impacts at the time.

The full data set for Go Noosa Christmas 2020/21 has been collected however has not yet been
analysed at the time of writing this report.
However interim information indicates:
   Bus patronage on the Free Buses was not significantly reduced despite the impact of
    coronavirus including the Brisbane lockdown.
   Noosa Heads Lions Park parked a total of 4,670 cars and generated $93,400. The average
    number of vehicles per day increased from 150 to 212 due to the opening up of the grassed
    area behind the amenities block.
   Anecdotal feedback from the Noosa Ferry is that patronage was sustained over the length
    of the school holidays rather than just the peak Christmas/New Year period.
   Over 95% of free bus passengers were either very satisfied or satisfied with their bus trip.
   Approximately 66% of survey respondents would have made their trip by car if the buses
    were not free.
   60% of survey respondents indicated that based on their experience of catching the free
    buses they would be more likely to catch a bus in the future.
   Where applicable, 58% of survey respondents said the digital road-side information boards,
    showing car parking capacity in Noosa Heads & alternative travel options helped to inform
    their travel choices.
   Of the people who completed the Go Noosa survey, the majority of people who caught a free
    bus were Noosa Shire residents (58%), followed by Interstate visitors (19%), visitors from
    within Qld (16%) Sunshine Coast residents (6%) and International visitors (1%)
   The top five means by which people found out about the free buses included:
    1.     They caught a free bus last year
    2.     Street banners on power poles
    3.     Word of mouth
    4.     A sign at the bus stop
    5.     Roadside digital variable message signs




                                                                                   Page 11 of 43

Section 12

GENERAL COMMITTEE MEETING AGENDA                                            15 FEBRUARY 2021


2.    Go Noosa peak period traffic management plan – Easter 2021

The proposed Go Noosa Easter 2021 is a continuation of the Go Noosa peak period traffic
management initiatives that is carried out during the peak holiday periods of Christmas and Easter
since 2018 including;
     Free buses
     Park & Ride
     Variable Message Signs
     Traffic Control
     Paid Parking –- Noosa Heads Lions Park
     Wayfinding
     Drop & Go car parks
     Parallel parking changes in Hastings Street
     Marketing.

2.1    Free Buses

The following existing TransLink bus services are recommended for inclusion in Go Noosa Easter
peak period traffic management plan from 2 – 18 April:
     Route 626 – Tewantin to Sunrise Beach via Noosa Heads
     Route 627 – Tewantin to Sunshine Beach via Noosa Heads
     Route 628 – Noosa Parklands to Noosa Junction, via Noosa Civic
     Route 629 – Tewantin to Noosa Junction via Noosa Civic
     Route 632 – Noosa to Cooran via Cooroy and Pomona.
Due to TransLink ticketing system, the existing 620 bus service between Peregian Beach and
Noosa Heads is unable to accommodate free travel on these services. In order to offer a free
service to residents and visitors between Peregian Beach and Noosa Heads, the following
additional bus service is recommended:
     064 – Peregian Beach to Noosa Heads shuttle bus from 8am to 6pm
Council is aware that this does cause some confusion, however we aim to mitigate this with
improved signage at bus stops. This item is regularly raised with TransLink and Council is seeking
an improvement on this arrangement.
     065 Go Noosa Loop Bus
The popular 065 Go Noosa Loop bus servicing Hastings Street, Noosa Drive, Weyba Road and
Noosa Parade is recommended with services every 15 minutes from 7am-7pm and every 30
minutes from 7pm-11pm.
The TransLink bus services 620, 631, and 630 travel outside of the Noosa Shire and are unable to
be included in the free services.

2.2   Park & Ride

To encourage people to park outside of the congested tourist areas, Council promotes the following
dedicated Park and Ride locations:
    Noosa AFL grounds (approx. 400 car parks)
    The J (approx. 100 car parks)
    Noosa Junction Transit Centre (approx. 50 car parks are converted to 6P)
    Hide & Ride where people are also encouraged to park anywhere along the free bus routes
     and ferry route.

                                                                                   Page 12 of 43

Section 13

GENERAL COMMITTEE MEETING AGENDA                                                15 FEBRUARY 2021


The Park & Ride locations are promoted through:
    Go Noosa directional signage.
    Marketing material including posters and factsheets
    Variable Message Signs.

2.3   Variable Message Signs
In addition to providing information on car parking availability, the Variable Message Signs (VMS)
promote alternate travel options including free buses, park & ride, bicycles and the ferry.

It is proposed to install high resolution video variable message signs at the following locations:
       Walter Hay Drive near Eenie Creek bridge
       Eenie Creek Road near the Noosa Civic
       David Low Way near Peregian Digital Hub
       Cooroy-Noosa road near Butler Street roundabout, Tewantin
       Sunshine Beach Road, Noosa Junction.

2.4   Traffic Control
It is proposed to utilise traffic control between 2 - 18 April 2021. The use and number of traffic
controllers will be based on anticipated demand and weather dependent.

The purpose of the traffic control is to:
    give priority to buses and pedestrians
    keep traffic moving so buses are not sitting in queues
    improve accessibility to the Noosa Heads area
    minimise traffic disruptions in the Noosa Heads area.

Use of traffic control is supported by:
    Hastings Street Association
    Lions Club who operate the paid parking
    Bus operators
    Council’s consulting traffic engineer.

It is acknowledged that it would be preferable from a visitor experience perspective for the traffic
controllers to be dressed in more relaxed attire, however, in order to meet required safety
standards, traffic controllers are required to wear high visibility long sleeve shirts and pants. Where
possible effort is made such as the wearing of broad brimmed tropical hats, flower leis and the
handing out Easter eggs. The traffic controllers also undergo a specific Go Noosa training program
to raise awareness and establish customer service standards.

2.5   Paid Parking - Noosa Heads Lions Park
As adopted at the Ordinary Meeting on 17 September 2020, the Noosa Heads Lions Park will be
used as a paid car park from 2 - 18 April 2021, weather dependent.

The Tewantin-Noosa Lions Club will operate the car park from 8:30am to 5.00pm daily. Vehicles
are charged a flat rate of $20 (incl. GST) per day or part thereof. The Tewantin-Noosa Lions Club
receive 50% of the parking fees with the remaining revenue coming to Council. Revenue to Council
goes towards:
     rectifying any damage/impact from parking on the reserve
     the hire of temporary fencing to protect children at the playground & BBQ area


                                                                                       Page 13 of 43

Section 14

GENERAL COMMITTEE MEETING AGENDA                                                15 FEBRUARY 2021


     parking signage at Lions Park
     the printing of tickets; and
     the use of traffic control to assist in the movement of pedestrians from Lions Park.

In addition, 50% of Council’s share will be held in reserve and allocated to recreational
improvements in the Noosa Heads Lions Park.

2.6   Wayfinding

To further assist pedestrians and bus passengers, temporary wayfinding signage will be installed
in and around Noosa Heads and Noosa Junction as well as at bus stops.

It is also proposed to have a bus driver passenger assistant at the Noosa Heads Bus Interchange
to assist passengers with wayfinding on week-ends and public holidays.

2.7   Drop & Go Car Parks

During Go Noosa Christmas 2020/21, two minute Drop & Go car parks were trialled on Noosa
Drive and Noosa Parade in addition to the existing drop & go car parking at the Hastings Street
Bus Interchange. The purpose of the Drop & Go car parks is to allow people to unload family and
beach gear within walking distance to the precinct without getting caught up in congestion.

Data on the use of the Drop & Go zones is currently being evaluated, however, early indications
suggest that the Drop & Go car parks were not used effectively. This may be due to a number of
factors including;
     Changes not visible enough resulting in drivers unknowingly parking in the drop off zones
     Drivers being unfamiliar with the changed conditions
     Need for increased enforcement
     Insufficient promotion of the drop and go areas.

Further refinements are required to ensure the effective use of the Drop & Go car parks and this
will be further trialled and tested over Easter including the possibility of moving the location of the
Drop & Go car parks to alternative sites in consultation with key stakeholders.

2.8   Parallel parking – Hastings Street & Noosa Parade

In order to allow traffic to flow more freely to the Woods car parking areas it is proposed to
temporarily convert eight parallel car parking bays on the southern side of Hastings Street to
increase footpath space, temporary scooter parking and loading bays.

2.9   Marketing and Evaluation

Go Noosa Easter aims to continue to build public awareness of the Go Noosa brand.
The objectives of the Go Noosa - Easter marketing plan are to:
     Raise awareness of alternative transport options to driving, such as Park & Ride, Free Buses,
      walking and cycling and the Noosa Ferry.
     Offer a relaxed and stress free alternative to driving a car into the Hastings street precinct.
It is proposed to employ a number of different marketing methods including;
     Posters & Factsheets
     Energex pole banners
     Signage at bus stops

                                                                                       Page 14 of 43

Section 15

GENERAL COMMITTEE MEETING AGENDA                                           15 FEBRUARY 2021


     Wayfinding signage
     Variable message signs
     Park and Ride signage
     Community radio announcements
     Paid newspaper advertisements
     Media launch
     Noosa Council media channels – Facebook, website, newsletter, messages on hold etc.

It is also proposed to use community and stakeholder networks to promote Go Noosa Easter
including Noosa Junction Traders Association, Tourism Noosa, accommodation providers,
Hastings Street Association and TransLink.

3.    Evaluation

Sources of evaluation will include but are not limited to:
    Bus patronage data
    Bus travel time information
    Pedestrian and cyclist counts
    Vehicle Queue length data
    Ferry patronage data
    Survey (face-to-face and online)
    Stakeholder feedback.

Previous Council Consideration

Ordinary Meeting Minutes, 15 October 2020, Item 3, Page 22
That Council note the report by the Project Manager and Project Officer – Transport Innovation to
the Services & Organisation Committee Meeting dated 6 October 2020, and:
A.    Approve the use of the 065 Go Noosa Loop bus servicing Weyba Road, Noosa Parade,
      Hastings Street and Noosa Drive from the 12 December 2020 to the 26 January 2021 with
      authority for the CEO to cancel, stand down and recommence the service based on the
      professional advice from Council’s COVID Safety Team and seeking the input from Noosa
      Chamber of Commerce, Tourism Noosa, the Transport Strategy Steering Group and
      Hinterland Business Representatives including advice and information from the Qld
      Government recommended COVID Safe Public Transport Plan as to suggested best practice
      and policy guidelines as their primary Terms of Reference.
B     Approve the use of the Noosa AFL ground, The J car park and Noosa Junction Transit Centre
      as Park & Ride locations.
C.    Approve the use of Variable Message Signs (VMS) at key entry points to Noosa from 12
      December 2020 to the 26 January 2021 for the purpose of informing motorists of car parking
      availability.
D.    Approve the use of traffic control in the Hastings Street precinct and surrounding areas to
      manage vehicle and pedestrian movements from the 12 December 2020 to the 26 January
      2021 as required.
E.    Approve the use of the Noosa Heads Lions Park for paid parking on the 12 to 13 December
      2020, 19 to 20 December 2020, 26 December to 17 January 2021 inclusive, and 23 to 26
      January 2021.
F.    Approve the use of wayfinding signage in the Hastings Street precinct, Noosa Junction and
      Noosaville from the 12 December 2020 to the 26 January 2021.


                                                                                  Page 15 of 43

Section 16

GENERAL COMMITTEE MEETING AGENDA                                               15 FEBRUARY 2021


G.   Approve the temporary conversion of 8 parallel car parks on the southern side of Hastings
     Street from the Hastings Street roundabout to 28 Hastings Street for other uses including,
     loading bays, bicycle and scooter parking, and increased footpath, from 12 December 2020
     to 26 January 2021.
H.   Approve the investigation and trial the promotion of the Noosa Ferry in Go Noosa marketing
     as an alternative mode of travel.
I.   Approve the trial installation of 2 minute Drop & Go areas on Noosa Parade and Noosa Drive.
J.   Approve the use of the 064 Peregian Beach to Noosa Heads shuttle bus from the 12
     December 2020 to the 26 January 2021 with delegated authority for the CEO to cancel, stand
     down and recommence the service based on advice from Council’s COVID Safety Team.
K.   Approve the use of free travel on TransLink bus services on routes 626, 627, 628, 629 and
     632 from the 12 December 2020 to the 26 January 2021 with delegated authority for the CEO
     to cancel, stand down and recommence the service based on advice from Council’s COVID
     Safety Team.

Ordinary Meeting Minutes, 17 September 2020, Item 8, Page 16
That Council note the report by the Project Manager Transport Innovation to the General
Committee Meeting dated 14 September 2020 and:
A.   Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over 2020/21
     Christmas holiday period from 14 December 2020 to 27 January 2021 with delegation to the
     CEO to reduce the days subject to weather and advice from the Council COVID Safe team;
B.   Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over 2021
     Easter holiday period from 2 April 2021 to 18 April 2021 with delegation to the CEO to reduce
     the days subject to weather and advice from the Council COVID Safe team;
C.   Approve the use of the Noosa Heads Lions Park Reserve for paid car parking over the 2020
     September holiday period from 19 September 2020 to 5 October 2020 with delegation to the
     CEO to reduce the days subject to weather and advice from the Council COVID Safe team;
D.   Write to the Department of Natural Resources, Mines and Energy and seek Ministerial
     Approval for an inconsistent secondary use of the Noosa Heads Lions Park (Lot 117 on
     SP108103) for paid car parking during school holidays and long weekends for the period of
     the public health declaration for the COVID-19 pandemic; and
E.   That an amount equivalent to 50% of Council’s share of the ‘profit’ from car parking in the
     Noosa Heads Lions Park Reserve be held ‘in reserve’ and allocated to recreational
     improvements in Lions park for residents and visitors alike, noting that the term ‘profit’ refers
     to Council’s share of the revenue less costs associated with rectifying any damage/impact
     from parking on the reserve, the hire of temporary fencing to protect children at the
     playground & BBQ area, parking signage at Lions Park, the printing of tickets and the use of
     traffic control to assist in the movement of pedestrians from Lions Park.

Finance
It is proposed that the peak period traffic management plan for Easter be funded by the Sustainable
Transport Levy and income generated from the Noosa Heads Lions Park paid parking. The below
table details all proposed initiatives and estimated costs. (Exact costs were not available at the
time of writing this report, estimates are based on quotations from previous Christmas & Easter
services).




                                                                                      Page 16 of 43

Section 17

GENERAL COMMITTEE MEETING AGENDA                                                   15 FEBRUARY 2021


Table 1: Peak Period Traffic Management Initiatives and Cost Estimates

 Initiatives        Details                                                      Dates           Estimated
                                                                                                     Costs
 5 TransLink Bus       Route 626 – Tewantin to Sunrise Beach via Noosa          2 – 18 April      $36,438
 Services               Heads
                       Route 627 – Tewantin to Sunshine Beach via Noosa
                        Heads
                       Route 628 – Noosa Parklands to Noosa Junction, via
                        Noosa Civic
                       Route 629 – Tewantin to Noosa Junction via Noosa
                        Civic
                       Route 632 – Noosa to Cooran via Cooroy and Pomona

 065 Go Noosa                                                                    2 – 18 April      $46,195
 Loop Bus
 064 Peregian                                                                    2 - 18 April      $28,456
 Beach – Noosa
 Heads Bus
 Park & Ride        The Noosa AFL ground, The J carpark and the Noosa            2 – 18 April        $1,500
                    Junction Transit Centre will be promoted as the key Park
                    & Ride locations for the free 065 Go Noosa Loop bus.
 Variable           Car parking availability and alternative transport options   2 – 18 April      $15,000
 Message Signs      shown on digital variable message signs (VMS) at the
                    main vehicle entry points including:
                     Walter Hay Drive
                     Eumundi Noosa Road
                     David Low Way (Sunshine Beach end)
                     Cooroy Noosa Road and
                     Noosa Junction
 Traffic Control    Traffic control                                              As required:      $28,000
                                                                                 2 – 18 April
 Parallel Parking   Replace 8 car parks on southern side of Hastings Street      2 – 18 April        $1,000
 in Hastings St     to reduce congestion causing reverse parking close to
                    roundabout.
 Wayfinding         Wayfinding signage to assist visitors find places to park,   2 – 18 April        $2,500
 signage            catch the Loop Bus and assist pedestrians with
                    convenient routes around Hastings St area
 Noosa Ferry        User pays. Include in marketing only.                        2 – 18 April        $1,000
 Drop & Go                                                                       2 – 18 April        $5,000
 zones
 Marketing                                                                                         $10,000
 Total                                                                                            $175,089
 Paid Parking       Use of Lions Park for overflow parking. Refer separate       2 – 18 April      ($68,000)
 revenue –          Council report to General Committee dated 14 September                       Lions Club
 Noosa Heads        2020.                                                                          - $34,000
 Lions Park                                                                                      (less GST)
                                                                                                      Noosa
                                                                                                    Council -
                                                                                                     $34,000




                                                                                           Page 17 of 43

Section 18

GENERAL COMMITTEE MEETING AGENDA                                                15 FEBRUARY 2021


Remaining Sustainable Transport Levy balance

 Sustainable Transport Levy as at 31 January 2021                                          $1,397,015
 Peak period traffic management cost estimate.                                    $           175,089
 Contingency 15%                                                                  $               26,263
 Lions Park car park Noosa Council net revenue estimate                   ($34,000)
 Net Costs                                                                                   $167,352
 Balance                                                                                  $1, 229, 662


Risks & Opportunities
Table 2 below identifies risks and the mitigation for each initiative as well as opportunities.




                                                                                       Page 18 of 43

Section 19

GENERAL COMMITTEE MEETING AGENDA                                                                                                              15 FEBRUARY 2021


Table 2: Risks & Opportunities

 Item                    Risk                                                             Mitigation
 065 Go Noosa Loop Bus
 Scope/Deliverables      Risk that bus movements are restricted by heavy congestion.      The use of traffic control may partly mitigate this risk, however this risk is
                                                                                          not able to be fully mitigated.
                         Currently finalising the section 43 agreement for 065 Go Noosa   Maintain dialogue with TransLink contracts team and senior management.
                         Loop & 064 Peregian Beach – Noosa Heads service.

                         Coronavirus Pandemic                                             Council’s Covid Safe team to approve operators Covid Safe Plan.
                                                                                          Delegated authority to cancel, stand down, recommence, reduce or
                                                                                          extend the service.
 Programme               Confusion regarding which buses are free.                        All marketing material will advertise which buses are free and which are
                                                                                          not as well as dedicated Park & Ride locations.
                                                                                          There is a “Free Bus” corflute sign on the dashboard of all free buses
 Finance                 Costs may be higher than reported.                               Use last Christmas daily average costs as a guide.
                         Costs may be impacted by Covid.                                  Negotiate penalties associated with “pull out” clause with operator.
 Opportunity             Loop bus to provide free buses until 11pm (previously 10 pm)     All marketing material to promote evening service on the loop bus.
                         this will allow employees to make use of free buses as well as
                         residents and visitors to travel for free in the evening.
                         Loop bus will also service the Hillsong patrons going to The J   NA
                         and Farmers Market Shoppers going to the AFL grounds on
                         Sundays.
 Park & Ride
 Scope/Deliverables      Park & Ride sites are difficult to direct drivers to.            Review wayfinding signage.
                         Low uptake of the AFL ground Park & Ride                         Review wayfinding signage & all marketing material
                         Agreement from stakeholders to operate Park & Ride from AFL      Consult with stakeholders to alleviate concerns.
                         Grounds and The J
 Information Management Systems – VMS & App
 Scope/Deliverables      VMS boards ineffective in advising motorists of parking          Reduce the number of messages displayed on the VMS boards. Evaluate
                         availability and congestion.                                     effectiveness of VMS boards through survey question.



                                                                                                                                                      Page 19 of 43

Section 20

GENERAL COMMITTEE MEETING AGENDA                                                                                                           15 FEBRUARY 2021


Item                    Risk                                                            Mitigation
Traffic Control & temporary wayfinding – Hastings St precinct
Scope/Deliverables      The traffic control may not be fully effective.                 Develop procedures that are appropriate and flexible and monitor to direct
                                                                                        changes when needed.
Programme               Traffic control seen as “road works” in Hastings Street.        Traffic controllers to undertake “Welcome to Noosa” training as well as Go
                                                                                        Noosa customer service training.
                                                                                        Work within existing standards to enhance the uniform for traffic
                                                                                        controllers to provide a festive, holiday atmosphere.
Finance                 Use of traffic control dependent on weather and traffic         Monitor need for traffic control and span of hours. Note inclusion of
                        conditions.                                                     contingency.
Temporary replacement of parallel parking on Hastings Street
Scope/Deliverables      People parking in the loading bays.                             Infringement notices.
Political               Objection from traders and patrons to replacement of parallel   All marketing material and signage will explain that it is a temporary
                        parking with temporary footpath and loading bays.               change during the peak holiday period.
Opportunity             Opportunity for more efficient delivery of goods to Hastings    NA
                        Street at busiest times of year.
Noosa Ferry Promotion
Scope/Deliverables      Low uptake.                                                     Ensure wide reach of marketing
                                                                                        Collaborate with stakeholders to promote widely.
Opportunity             Collaboration with private operator to market alternative       NA.
                        transport solutions.
Drop & Go Zones
Scope/Deliverables      People parking in the two minute drop off zone.                 Local law enforcement.
                        People unaware of two minute drop off zone.                     Use signage to raise awareness.
                                                                                        Promote through all marketing material.
                        Drop off zones not being used.                                  Monitor and review locations.
Political               Community oppose the change in timed parking to two minute      Communicate that it is a trial and a temporary measure for the peak period
                        drop off zone.                                                  only.




                                                                                                                                                 Page 20 of 43

Section 21

GENERAL COMMITTEE MEETING AGENDA                                                15 FEBRUARY 2021


Consultation
External Consultation - Community & Stakeholder
    Hastings Street Association
    Tourism Noosa
    Tewantin-Noosa Lions Club
    Noosa Ferry


Departments/Sections Consulted:

    Chief Executive Officer       Community Services                          Corporate Services
    Executive Officer             Director                                    Director
    Executive Support             Community Development                   X   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                   X   Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health                Revenue Services

    Executive Services            Environment & Sustainable Development   X   Infrastructure Services
    Director                      Director                                X   Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning             X   Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 21 of 43

Section 22

GENERAL COMMITTEE MEETING AGENDA                                               15 FEBRUARY 2021


12   DEBT POLICY REVIEW

Author           Manager Financial Services, Trent Grauf
                 Corporate Services Department

Index            ECM/ Subject/ 27.48 Council Policies

Attachments      1.    2020-21 Debt Policy



EXECUTIVE SUMMARY
In December 2020, Council resolved to proceed with an application to Queensland Treasury
Corporation (QTC) to refinance its existing debt under the Local Government Debt Refinancing
Program. To support the loan refinancing application, Council’s current 2020/21 Debt Policy has
been updated.

RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 15 February 2021 and, pursuant to section 192 of the Local Government Regulation 2012,
adopt the updated Debt Policy for the 2020/21 financial year.



REPORT
At the Ordinary Meeting on 17 December 2020, Council resolved to refinance all of Council’s
current debt balances over a 20-year term and capitalise the early repayment adjustment (ERA)
charge. The closing date for debt refinancing applications to QTC is 26 February 2021, and Council
is required to provide a current Debt Policy as part of the supporting documentation.

In line with the Local Government Regulation 2012, Council adopts its Debt Policy on an annual
basis with the budget, and it includes an outline of borrowings proposed during the current year
plus a forecast of borrowings over the ensuing 9 year period.

The following changes are proposed to the current 2020/21 Debt Policy to ensure a compliant
refinancing process and that the policy is reflective of the revised borrowing program:
    Undertaking of debt refinancing activities: The following clause has been included in the
     Debt Policy to facilitate undertaking of debt refinancing activities:
     Council will periodically review its existing debt portfolio to assess the appropriateness of the
     current structure and whether any net benefit can be achieved through refinancing.
     Consideration will be given to borrowing rates, existing cash reserve levels, future cash flows,
     financial sustainability indicators and the principles outlined in Council’s Financial
     Sustainability Policy.
    Proposed Refinanced Borrowings: Appendix B of the Debt Policy outlines the entire
     existing debt pool (approximately $20.3 million) proposed to be refinanced over a 20-year
     term.




                                                                                      Page 22 of 43

Section 23

GENERAL COMMITTEE MEETING AGENDA                                              15 FEBRUARY 2021


    Proposed New Borrowings 2020/21: Two changes are required:
     o     Inclusion of a new loan for the capitalisation of ERA costs (approximately $2.9 million).
     o     Removal of the proposed $3.4 million in new loans for 2020/21 capital works based on
           revised works timing and available cash reserves.
    Proposed New Borrowings Future Years: This will be reassessed as part of the 2021/22
     budget process and capital works program.

It should be noted that these amounts may change depending on the date the refinancing
application is processed, movement in market interest rates and timing of loan repayments.

Previous Council Consideration
Ordinary Meeting Minutes, 17 December 2020, Item 3, Page 21
That Council note the report by the Director Corporate Services to the Services & Organisation
Committee Meeting dated 8 December 2020 and:
A.   Agree in principle to the 20 year fixed interest refinancing of Council’s current total debt
     balance at the latest applicable QTC borrowing rate;
B.   Agree to recapitalise the early repayment adjustment through the refinancing transaction to
     ensure cash reserves are maintained; and
C.   Authorise the Chief Executive Officer to submit an application by 26 February 2021 to the
     Department of State Development, Infrastructure, Local Government and Planning seeking
     borrowing approval for the refinancing transaction.

Special Meeting Minutes, 10 July 2020, Item 2, Page 3
That Council note the report by the Director Corporate Services to the Special Meeting dated 10
July 2020 and:
A.   Adopt the Financial Sustainability Policy, which is provided as Attachment 1 to the report;
B.   Pursuant to section 191 of the Local Government Regulation 2012, adopt for the 2020/21
     financial year the Investment of Surplus Funds Policy, which is provided as Attachment 2 to
     the report; and
C.   Pursuant to section 192 of the Local Government Regulation 2012, adopt for the 2020/21
     financial year the Debt Policy, which is provided as Attachment 3 to the report.

Finance
Council borrowing is effectively guaranteed by the State Government, and as such any borrowing
must be approved by the Minister for Local Government (in accordance with the Statutory Bodies
Financial Arrangements Act 1982).

Risks & Opportunities
Failure to effectively comply with legislation regarding the review, update and adoption of required
policies and new policies may compromise effective organisational governance and compromise
Council’s short and long term financial sustainability.

Consultation
External Consultation - Community & Stakeholder
Queensland Treasury Corporation.

                                                                                     Page 23 of 43

Section 24

GENERAL COMMITTEE MEETING AGENDA                                                15 FEBRUARY 2021


Internal Consultation

Departments/Sections Consulted:

    Chief Executive Officer       Community Services                      X   Corporate Services
    Executive Officer             Director                                X   Director
    Executive Support             Community Development                   X   Financial Services
                                  Community Facilities                        ICT
                                  Libraries & Galleries                       Procurement & Fleet
                                  Local Laws                                  Property
                                  Waste & Environmental Health            X   Revenue Services

    Executive Services            Environment & Sustainable Development       Infrastructure Services
    Director                      Director                                    Director
    Community Engagement          Building & Plumbing Services                Asset Management
    Customer Service              Development Assessment                      Buildings and Facilities
    Governance                    Economic Development                        Civil Operations
    People and Culture            Environmental Services                      Disaster Management
                                  Strategic Land Use Planning                 Infrastructure Planning,
                                                                              Design and Delivery




                                                                                         Page 24 of 43

Section 25

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021


                                     ATTACHMENT 1




                                       Page 25 of 43

GENERAL COMMITTEE MEETING AGENDA                                             15 FEBRUARY 2021

                                                                                 ATTACHMENT 1

   WM  MENeew,                                                            Council Policy
  me    i    Reeleele                                                   DEBT POLICY
  Corporate Plan Reference:                 Long term planning for Noosa Shire

  Endorsed by Council:                      15 February 2021
  Policy Author:                            Director Corporate Services

 POLICY BACKGROUND
 The purpose of this policy is to ensure the sound management of Council's existing and future debt.
 The policy will provide clear guidance for staff in the management of Council's debt portfolio and
 maintenance of appropriate debt and debt service levels.
 This policy applies to all Councillors and Council staff and extends to all borrowing activities of Council
 and any controlled entities.
 COUNCIL POLICY
 Council will utilise a debt management strategy based on sound financial management principles and
 ensure net debt (net financial liabilities) remains within financial sustainability targets.
 Borrowing Purposes
 1.   Council will not utilise loan funding to finance operating activities or recurrent expenditure.
 2.   Council undertakes full analysis of all funding options as outlined in the Long Term Financial
      Model, including a forward program of capital works, to determine loan funding requirements.
 3.   Council recognises that infrastructure demands placed upon Council can often only be met
      through borrowings, but will always be mindful of the additional cost incurred by the community
      when assets are acquired through borrowings which increases the cost of providing capital
      infrastructure.
 4. — Council will endeavour to fund all capital renewal projects from operating cash flows and borrow
      only for new or upgrade capital projects, having regard to sound financial management principles
      and giving consideration to inter-generational equity for the funding of long term infrastructure
      projects.
 5.   Where capital expenditure is deferred from one year to the next, the drawdown of approved
      loan funds will be reviewed to minimise interest expenses.
 6.   Borrowings for infrastructure that provides a positive rate of return on investment will take priority
      over borrowing for other assets.
 Debt Term
 7. | Where capital projects are financed through borrowings, Council will repay the loan over a term
      which takes into consideration the expected life of those assets, and over a term that optimises cash
      flow efficiency.
      7.1.  If surplus funds become available, and where it is advantageous to Council, one-off loan
            repayments will be made to reduce the term of existing loans.
      7.2.  |In an environment of fluctuating interest rates, and where there is a distinct economic
            advantage to Council, consideration will be given to renegotiating any outstanding loans
            to obtain the best long-term benefit to Council.

                                                                                    Page 25 of 43

Section 26

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 26 of 43

GENERAL COMMITTEE MEETING AGENDA                                            15 FEBRUARY 2021

 Repayment Ability
 8.   Council will maintain close scrutiny of debt levels to ensure that relevant sustainability indicators
      will not exceed target parameters recommended by Queensland Treasury Corporation and the
      Local Government Regulation 2012
 Borrowing Sources
 9.   Council will raise all external borrowings at the most competitive rates available and from
      sources available as defined by legislation. Consideration will be given to the provision of loans
      to business activities and other specifically identified projects and activities from surplus cash
      reserves held by Council by way on an internal loan.
 Proposed New Borrowings
 10   Pursuant to section 192 Local Government Regulation 2012, Council must prepare a debt policy
      each year that states the new borrowings planned for the current financial year and the next 9
      financial years.
      10.1 Proposed Borrowings are outlined in Appendix A
 Refinancing of Existing Borrowings
 11   Council will periodically review its existing debt portfolio to assess the appropriateness of the
      current structure and whether any net benefit can be achieved through refinancing.
      Consideration will be given to borrowing rates, existing cash reserve levels, future cash flows,
      financial sustainability indicators and the principles outlined in Council's Financial Sustainability
      Policy. The debt policy will include any proposed refinancing initiatives for the current year and
      the next 9 years.
      11.1 Proposed refinancing of existing borrowings are outlined in Appendix B
 Leases
 12   Funding alternatives for asset acquisition also includes leasing. Leases are defined under
      accounting standard AASB 16 as a contract for the right of use over an asset for a temporary
      period of time.
      12.1 Any low value (under $10,000) or short term (under 12 months) leases are considered an
           operating expense.
      12.2 However, all other lease arrangements under AASB 16 are reported as a right-of-use
           asset with a corresponding liability in the balance sheet recognised with all other debt and
           loan borrowing instruments.
      12.3 Any lease arrangement greater than $2 million (other than any lease for office premises)
           are considered borrowings under the Statutory Bodies Financial Arrangement Act 1982
           and will require prior approval by the Queensland Government before they are committed.
      12.4 Council will also undertake a lease vs. buy analysis before entering into any lease
           contract.
 Internal Loans
 13.  The provision and approval of an internal loan will depend on the availability of surplus cash at
      the time of consideration and the capacity of either the business activity or operational activity
      to repay the loan.
      13.1 All decisions regarding internal loans will be made by Council as part of the annual budget
           process. The approval to establish an internal loan will only occur following confirmation
           that Council's relevant sustainability indicators in the 10 year financial forecast will not be
           compromised.

                                                                                  Page 26 of 43

Section 27

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 27 of 43

GENERAL COMMITTEE MEETING AGENDA                                             15 FEBRUARY 2021

       13.2 The term of any internal loan will be appropriate to the life of the infrastructure / asset
            being financed.
       13.3 The interest rate will be the sum of
            (a)   the equivalent QTC borrowing rate for the proposed term;
            (b)   the QTC administration charge; and
            (c)   an additional margin above the QTC borrowing rate.
            In all cases, where business activities are subject to the provisions of the National
            Competition Policy, the cost to the business will be no less than what would apply to an
            equivalent private sector business.
       13.4 Provision for the repayment of an internal loan will be included in the annual budget for
            the business or operational activity.
 GUIDING PRINCIPLES
 The purpose of establishing a Debt Policy is to:
 .     Provide a comprehensive view of Council's long term debt position and the capacity to fund
       infrastructure growth for the Shire;
 .     Increase awareness of issues concerning debt management;
 .     Enhance the understanding between Councillors, community groups and Council staff by
      documenting policies and guidelines;
 .     Demonstrate to government and lending institutions that Council has a disciplined approach to
       borrowing.
 ROLES AND RESPONSIBILITIES
 Pursuant to section 192 of the Local Government Regulation 2012 detail of the proposed borrowing
 for the current year and the future 9 years will be prepared annually as part of the budget process.
 Applications outlining proposed borrowings will be forwarded to the Minister for Local Government for
 approval.
 Periodic Credit Reviews will be undertaken by the QTC on behalf of the Minister for Local
 Government.
 Loan proceeds will be drawn down subject to cash flow requirements annually so as to minimise
 interest expenses.
 All lease proposals will be referred to Financial Services for evaluation to assess alternatives for
 funding asset acquisition and to ensure statutory compliance.
 MEASUREMENT OF SUCCESS
 Financial sustainability indicators remain within target ranges and the provision of necessary
 infrastructure is not constrained through the lack of capital funding.
 Details of outstanding loans will be reported annually in Council's Financial Statements and Annual
 Report.
 DEFINITIONS
 Business Activity — A Council activity subject to the application of full cost pricing principles as
 defined in the Local Government Act 2009 and Local Government Regulation 2012.
 Inter-generational equity — This relates to the fairness of the distribution of the costs and benefits of
 a policy when costs and benefits are borne by different generations. (i.e. the principle whereby those
 who derive a direct benefit from the service or infrastructure provided actually pay for that service).

                                                                                    Page 27 of 43

Section 28

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 28 of 43

GENERAL COMMITTEE MEETING AGENDA                                                 15 FEBRUARY 2021

 Net financial liabilities ratio — This ts an indicator of the extent to which the net financial liabilities of
 Council can be serviced by its operating revenues. A ratio greater than zero (positive) indicates that
total liabilities exceed current assets, whereas a ratio of less than zero (negative) indicates that current
 assets exceed total liabilities and therefore Council would appear to have the capacity to increase
 loan borrowings.
 QTC — Queensland Treasury Corporation.

 RELEVANT POLICIES AND LEGISLATION
 .    Local Government Act 2009
 .    Local Government Regulation 2012
 .     Statutory Bodies Financial Arrangements Act 1982
 .     Statutory Bodies Financial Arrangements Regulation 2007

  Version control
    Version    Reason! Trigger                Change (Y/N)  Endorsed! Reviewed by     Date
    1.0        Create new                                   Manager Financial Services 25/12/2013
    2.0        Annual Review                                Manager Financial Services 02/06/2014
    3.0        Annual Review                       Y        Manager Financial Services 02/06/2015
    4.0        Annual Review                       N        Manager Financial Services 20/05/2016
    5.0        Annual Review                                Director Corporate Services 19/05/2017
    6.0        Annual Review                       Y        Council                  29/06/2018
    7.0        Annual Review                       Y        Council                   06/07/2018
    8.0        Annual Review                       N        Council                  28/06/2019
    9.0        Annual Review                       Y        Council                   10/07/2020
    10.0       Refinancing Review                  Y        Council                   17/02/2021

                                                                                        Page 28 of 43

Section 29

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 29 of 43

GENERAL COMMITTEE MEETING AGENDA                                                                                                  15 FEBRUARY 2021

 Appendix A
 Schedule of Proposed Borrowings:

               2020/21      2021/22      2022/23      2023/24      2024/25      2025/26      2026/27      2027/28       2028/29      2029/30
                 $,000        $,000        $,000        $,000        $,000        $,000        $,000        $,000        $,000        $,000

  Borrowings

        -    The 2020/21 proposed borrowing represents the capitalisation of the early repayment charge incurred from the refinancing of Council’s existing QTC debt
 Borrowing   pool. The actual borrowing amount may vary slightly depending on the market value of the borrowings at the actual date of refinancing.
             * Difference between Book Value and Market Value of QTC Debt pool as at 31 January 2021

 Appendix B
 Schedule of Proposed Refinancing of Existing Borrowings:

               2020/21      2021/22      2022/23       2023/24     2024/25      2025/26      2026/27      2027/28       2028/29      2029/30
                 $,000        $,000        $,000        $,000        $,000        $,000        $,000        $,000        $,000        $,000
  Refinanced
  Borrowings

             The 2020/21 borrowing proposed for refinancing represents 100% of Council's existing QTC debt pool as at 31 January 2021. This amount may vary
  Borrowing | slightly depending on the timing of the actual date of refinancing.
  Purpose
            *Book value of QTC Debt pool as at 31 January 2021

                                                                                                                                         Page 29 of 43

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                      15 FEBRUARY 2021


13     FINANCIAL PERFORMANCE REPORT – JANUARY 2021

Author             Manager Financial Services, Trent Grauf
                   Corporate Services Department

Index              ECM/ Subject/ 22.09 – Monthly Financial Performance Report

Attachments        1.   Statement of Income and Expenditure (Profit & Loss and Capital)
                   2.   Statement of Financial Position
                   3.   Statement of Cash Flows
                   4.   Summary of Materials and Services Expenditure



EXECUTIVE SUMMARY
Year to date (YTD) operating performance against current budget as at 31 January 2021 is
positive, with operating revenues performing above forecast due to Council facilities and business
activity sales outperforming COVID-19 budget assumptions. The YTD net operating position, both
budget and actual, is high reflecting the recognition of revenue associated with rates and charges
levied in January.

 YTD Financial Performance Summary
                                Budget             Actual           Variance     Variance      Status
                                   $m                 $m                 $m            %
 Operating Revenue                   $83.8          $88.3               $4.5        5.4%      On Track
 Operating Expense                   $55.2          $54.9               $0.3        0.6%      On Track
 Operating Position                  $28.6          $33.5               $4.8       16.9%
 Capital Revenue                      $4.4           $6.6               $2.2       49.9%    Above Budget
 Capital Expenditure                 $13.0          $12.4               $0.6        4.7%      On Track

Financial statements including Statement of Income & Expenditure, Statement of Financial
Position (balance sheet), and Statement of Cash Flows are included as attachments for information
for Council.

Figure 1: Actual Performance Compared to Budget

 $100                                    YTD Budget ($m)
     $90                     $88.3
                    $83.8                YTD Actual ($m)
     $80
     $70
     $60                                                    $55.2        $54.9

     $50
     $40
     $30
     $20
     $10
      $-
                Operating Revenue                      Operating Expenditure




                                                                                             Page 30 of 43

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                       15 FEBRUARY 2021


Council’s performance against key measures of financial sustainability have been calculated as at
January 2021. These indicators enable the reader to assess Council’s success in managing its
budget, cash and debt as well as undertaking sustainable asset management. The table below
contains a snapshot of a number of key measures, with full detail included in the report.

 YTD Measures of Financial Sustainability
                                    Target       Current      Actual YTD
                                                 Budget
 Operating Surplus Ratio            0-10%         -3.0%          37.9%            On Track
 Net Financial Liabilities Ratio    <60%          -8.5%          -53.7%           On Track
 Cash Cover Ratio                  3 months    7.9 months      9.7 months       Above Target
 Asset Sustainability Ratio         > 90%        100.1%          58.9%            On Track


RECOMMENDATION
That Council note the report by the Manager Financial Services to the General Committee Meeting
dated 15 February 2021 outlining January 2021 year to date financial performance against budget,
including performance against key financial sustainability indicators.


REPORT
Operating Revenue (YTD Benchmark 58.3%)
Council has received 91% ($88.3 million) of its operating revenue budget ($96.9 million).
Commentary on each revenue category is provided below.

 Category              Summary                          Comments
 Rates and Levies      $70.2 million (103%) of the         Waste utility charges $909k above YTD budget
                       annual budget of $68.4               (107% or $13.3 million of $12.4 million budget
                       million has been earned              earned), due to commercial collection services
                                                            previously impacted by the COVID-19
                                                            pandemic recovering earlier than forecast
                                                            (partially offset by additional contractor
                                                            operating costs)
 Fees and              $4.4 million (66%) of the $6.6      Building application fees $121k above YTD
 Charges               million annual budget has            budget (72% or $480k of $667k budget earned)
                       been earned                         Plumbing application fees $87k above YTD
                                                            budget (69% or $699k of $1.0 million budget
                                                            earned)
                                                           Development assessment fees $111k above
                                                            YTD budget (65% or $1.0 million of $1.6 million
                                                            budget earned) – offset by additional
                                                            consultancy and other application processing
                                                            costs
 Sale of Goods         $6.6 million (90%) of the $7.3      Holiday Park sales $1.4 million above YTD
 and Services          million budget has been              budget (144% or $2.3 million of $1.6 million
                       received                             budget earned) – Parks reopened earlier than
                                                            forecast    following    COVID-19        pandemic
                                                            closures. Positive revenue variances that hold
                                                            through the financial year will be offset in part by
                                                            additional variable operating costs
                                                           Community Facilities (NAC, NLC and The J)
                                                            $825k above YTD budget (94% or $1.4 million
                                                            of $1.5 million budget earned) – Facilities
                                                            reopened earlier than forecast following


                                                                                               Page 31 of 43

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                                      15 FEBRUARY 2021


 Category              Summary                                       Comments
                                                                        COVID-19 pandemic closures. Positive revenue
                                                                        variances that hold through the financial year
                                                                        will be offset in part by additional variable
                                                                        operating costs
                                                                      Waste management disposal fees and sale of
                                                                        recoverable materials $418k above YTD budget
                                                                        (67% or $2.7 million of $4.0 million budget
                                                                        earned)
 Interest              $454k (52%) of the $870k                            Interest revenues on cash invested will need
 Received              annual budget has been                               ongoing monitoring given further recent interest
                       earned                                               rate cuts and impacts on term deposit / cash
                                                                            fund rates
 Unitywater            On track                                      Nil
 Dividend and
 Tax
 Other Revenue         $1.5 million (75%) of the $2.0                      Recoupment of Unitywater charges from
                       million budget has been                              lessees $97k above YTD budget - offset by
                       earned                                               additional utility charge expenses
                                                                           Commercial lease revenue $93k above YTD
                                                                            budget (73% or $667k of $919k budget earned)
 Operating             $3.3 million (54%) of the $6.1                      50% ($1.2 million) of the financial assistance
 Grants,               million budget has been                              grant was prepaid in May 2020 and may impact
 Subsidies             received                                             on Council’s 2020/21 final operating position if
                                                                            the prepayment approach is discontinued by the
                                                                            Australian government
                                                                           All operating grants are in line with budget
                                                                            expectations at this stage
 Unitywater            On track                                            Unitywater distributions are fixed each year so
 Distributions                                                              there is little budget variance risk
                                                                           Unitywater have advised that distributions will
                                                                            not change due to any COVID-19 impacts on its
                                                                            financial position

Figure 2: Operating Revenue Position by Type (Excluding Rates)

  $7.0                                             $6.6


  $6.0
                                                                                YTD Budget ($m)
  $5.0                                                                          YTD Actual ($m)
         $3.9 $4.4                          $3.9
  $4.0
                                                                                        $3.2 $3.3
  $3.0
                                                                                                    $1.9 $1.9
  $2.0

  $1.0                               $0.5                 $0.7 $0.9
                       $0.4                                                $0.5 $0.6

  $0.0
                                                                                          Grants
             Charges




                                                           Income




                                                                               Other
                                             Goods &




                                                                                                      Unitywater
                                             Services
                                             Sales of




                                                            Rental
                          Interest
             Fees &




                                                                                                       Share of




                                                                                                                   Page 32 of 43

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                                              15 FEBRUARY 2021


Operating Expenditure (YTD Benchmark 58.3%)
Actual operating expenditure is currently 55% ($54.8 million) of full year budget ($99.9 million).
Detailed commentary for each expenditure category is provided below.
 Category                   Summary                                       Comments
 Employee                   $19.6 million (56%) of the                         Under expenditure for permanent staff salaries
 Costs                      annual budget of $34.8                              and wages ($1.7 million) partially offset by
                            million has been expended                           additional spend on casual staff and external
                                                                                labour hire ($769k) as well as overtime and
                                                                                allowances ($150k)
 Materials and              $23.2 million (52%) of the                         Council buildings and facilities $150k below YTD
 Services                   $44.5 million annual budget                         budget (40% or $419k of $1.0 million budget
                            has been expended                                   spent) – timing of utilities as well as scheduled
                                                                                maintenance and cleaning services
                                                                               Libraries services $74k below YTD budget (40%
                                                                                or $650k of $1.7 million budget spent) – timing of
                                                                                library collection purchases and programs
                                                                               Waste Management costs $71k below YTD
                                                                                budget (56% or $5.5 million of $9.8 million budget
                                                                                spent) – collection bin purchases lower than
                                                                                forecast. Offset by lower revenues
                                                                               Gallery costs $58k below YTD budget (36% or
                                                                                $169k of $467k budget spent) – timing of events
                                                                                and progress of gallery pre-feasibility review
                                                                               Schoolies-related costs $80k unbudgeted – to be
                                                                                addressed at Budget Review 3
                                                                               Development application costs $71k above YTD
                                                                                budget (92% or $194k of $210k budget spent) –
                                                                                offset by additional application revenues
                                                                               Holiday parks $370k above YTD budget (99% or
                                                                                $856k of $861k budget spent) – variable
                                                                                operating costs from parks reopening earlier than
                                                                                budgeted following COVID-19 pandemic related
                                                                                closures - offset by additional revenues
 Finance Costs              On track                                      Nil
 Depreciation               On track                                      Nil
 Other Expenses             On track                                      Nil
Figure 3: Operating Expenditure Position by Type

$25.0                              $23.2 $23.2

            $19.9 $19.6                                                   YTD Budget ($m)
$20.0
                                                                          YTD Actual ($m)
$15.0
                                                                                    $11.1 $11.1
$10.0

 $5.0
                                                    $0.9 $0.8
                                                                                                       $0.1 $0.1
 $0.0
                                                          Finance Costs
                                       Materials




                                                                                        Depreciation
                Employees




                                                                                                          Other




                                                                                                                   Page 33 of 43

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                                     15 FEBRUARY 2021


Capital Revenue
YTD capital revenue of $6.5 million received comprises cash contributions from developers ($1.2
million) and capital grants ($5.3 million). Note that the timing of capital grant receipts are generally
dependent on the timing of grant conditions and also capital delivery performance, and that the
timing of the receipt of developer contributions (both cash and contributed) is unpredictable.

Figure 4: Capital Revenue by Type

 $6.0
                                                                 $5.3

 $5.0
                                                                        YTD Budget ($m)
                                                                        YTD Actual ($m)
 $4.0
                                              $3.1
 $3.0

 $2.0
                $1.2                   $1.2
 $1.0
                                                                             $0.0                 $0.0
 $0.0
                       Contributions




                                                     Subsidies




                                                                                    Contributed
                                                      Grants /




                                                                                      Assets
                          Cash




Capital Program
Actual capital expenditure (excluding commitments) is $12.4 million (YTD budget $13.0 million).
Detailed discussion of progress in the delivery of the capital works program is provided through a
separate report by the Asset Planning Manager.

Figure 5: Capital Program Delivery Performance

$12.0
               $10.4
                                       $9.9
$10.0                                            YTD Budget ($m)
                                                 YTD Actual ($m)
 $8.0

 $6.0

 $4.0

 $2.0                                         $1.5               $1.3       $1.2                  $1.2


 $0.0
               Capital works                  Other capital                Loan redemption




                                                                                                         Page 34 of 43

Section 35

GENERAL COMMITTEE MEETING AGENDA                                                                         15 FEBRUARY 2021


Cash Management and Investment Performance
Total cash on hand at the end of January was $65 million. Included in this balance are funds held
in trust and for restricted purposes (e.g. unexpended levy and grant funds), cash inflows beginning
from the January rate levy, prepaid grants including the financial assistance grant and other capital
works grants, as well as any other monies committed for funding capital projects which are
underway and will continue during the financial year.

The following pie charts present the mix of cash held at January 2021 by agency (graph on the
left) and by credit risk rating (graph on the right). All funds have been invested in accordance with
the Investment Policy and in consideration of the principles of ethical investment, preservation of
capital, return on investment and counterparty thresholds.

Figure 6: Closing Cash Held by Agency and Credit Rating



                                    CBA                                                       A1 +
                                    3%                                                  (Commercial Banks)…




                                QTC                                                             A1 +
                                97%                                                            (QTC…




The following chart monitors the 12 month trend on total cash and the agencies invested. While
the bulk of cash from rates and levy is forecast to be received in February, early payments
received during January provided for an increase in cash overall of $4 million. This will be
reinvested in February in line with Council’s Investment Policy.
Figure 7: 12 Month Trend of Cash Invested by Agency
  90,000,000


  80,000,000


  70,000,000


  60,000,000


  50,000,000


  40,000,000


  30,000,000


  20,000,000


  10,000,000


          -
              Feb-20   Mar-20   Apr-20   May-20   Jun-20   Jul-20   Aug-20   Sep-20   Oct-20   Nov-20   Dec-20     Jan-21


               Bendigo TD         Westpac TD        NAB TD          Suncorp TD        CBA TD       QTC           CBA Operating



                                                                                                                    Page 35 of 43

Section 36

GENERAL COMMITTEE MEETING AGENDA                                                                                                                                                                15 FEBRUARY 2021


Measures of Financial Sustainability
The following table incorporates a set of financial sustainability indicators to further assist in
managing Council financial performance. There are no current emerging risks regarding financial
performance year to date.

 Category                                                                                                                                                                          Comments
 Operating Surplus Ratio                                                                                                                                                              Intent: Identifies the extent to
                                      90%                                                                                                                                              which revenues cover operational
                                      80%
                                                 77.3%                                                                                                                                 expenses, to ensure community
                                      70%
                                                                                                                                                                                       equity is not degraded
                                                         59.1%
                                      60%                                                                                                                                             Target: 0 – 10%
                                      50%                           43.2%                                                                                                             Result: 37.9%
                                                                                                               37.9%
                                      40%                                      30.9%                                                                                                  Comment: The ratio is at the
                                      30%                                                                                                                                              second peak for the year following
                                                                                         15.7%
                                      20%                                                                                                                                              the issue of rates and levies in
                                      10%                                                              4.6%                                                                            January.
                                       0%
                                      -10%
                                                  Jul        Aug        Sep        Oct       Nov       Dec         Jan        Feb        Mar        Apr        May       Jun


                                                         Actual                          Budget                           Minimum                               Target


 Cash Expense Cover                                                                                                                                                                   Intent: Indicates how long
                                      14.0                                                                                                                                             Council can continue paying its
                                                  11.9                                                                                                                                 day-to-day expenses from cash at
  Months (Cash to Cover Operations)




                                                             11.5                                                  11.5
                                      12.0                                                                                    11.1
                                                                        10.2
                                                                                                                                         10.7
                                                                                                                                                    10.1
                                                                                                                                                                                       bank without needing additional
                                                                                   9.5                                                                                   9.7
                                      10.0                                                              8.7                                                    9.1                     cash flows
                                                                                             8.6
                                       8.0
                                                                                                                                                                                      Target: > 3 months
                                                                                                                                                                                      Result: 9.7 months
                                       6.0
                                                                                                                                                                                      Comment: Whilst current cash
                                       4.0                                                                                                                                             cover remains above target,
                                       2.0                                                                                                                                             business as usual expenditure
                                                                                                                                                                                       and any other unforeseen
                                        -                -          -          -         -         -           -          -          -          -          -         -         -
                                                 Feb         Mar        Apr        May       Jun       Jul         Aug        Sep        Oct        Nov        Dec       Jan
                                                                                                                                                                                       financial impacts through to 30
                                                                                                                                                                                       June 2021 will degrade Council’s
                                                             Actual                                                                 Minimum (>0 months)                                cash holdings.
                                                             Target (3 months)                                                      Maximum (6 months)

 Asset Sustainability Ratio                                                                                                                                                           Intent: Measures the extent to
                                      120%                                                                                                                                             which assets are being replaced
                                                                                                                                                                 100.1%                as their condition degrades to
                                      100%                                                                                                                                             ensure service potential is
                                                                                                                                                                          90%          maintained
                                       80%
                                                                                                                                                                                      Target: 90% of depreciation
                                                                                                                   59%
                                       60%                                                             55%                                                                             budget spent on renewals
                                                                                             45%                                                                                       annually
                                                                                   34%
                                       40%                              29%                                                                                                           Result: In line with budget
                                       20%                   13%                                                                                                                      Comment:        The     ratio  will
                                                   1%                                                                                                                                  progressively     increase    each
                                            0%                                                                                                                                         month     as     expenditure    on
                                                   Jul       Aug        Sep        Oct       Nov       Dec         Jan        Feb        Mar        Apr        May       Jun
                                                                                                                                                                                       renewals occurs.
                                                   Actual Renewal Spend (%)                                   Target (%)                    Renewals Budget (%)




                                                                                                                                                                                                        Page 36 of 43

Section 37

GENERAL COMMITTEE MEETING AGENDA                                                                                                                        15 FEBRUARY 2021


 Category                                                                                                                                 Comments
 Net Financial Liabilities Ratio                                                                                                             Intent: Outlines the level that net
                                                                                                                                              Council debt can be serviced by
                80%
                                                                                                                                              operating revenues. A ratio below
                                                         60%
                60%                                                                                                                           zero implies that liabilities are less
                                                                                                                                              than cash (and other current
                40%                                                                                                                           assets) and there is adequate
                                                                                                                                              borrowing capacity available if
                20%                                                                                                                           needed.
                                     0%
                                                                                                                                             Target: less than 60%
                                                      Target                             Budget                        YTD Actual            Result: -54%
   -20%                                                                                   -8%                                                Comment: Council has low debt
   -40%
                                                                                                                                              levels and strong cash holdings.

   -60%                                                                                                                  -54%

 Investment Return                                                                                                                           Intent: Ensure appropriate return
                                                                                                                                              on investment yield for cash at
                                                                                                                                              bank.
                                                                                                                                             Target: 0.25% above current
                                                                                                                                              Bloomberg commonwealth 10
                                                                                                                                              year bond rate yield (0.01%)
                                                                                                                                             Result: 0.46%
                                                                                                                                             Comment: Regardless of the
                                                                                                                                              current levels of low long term
                                                                                                                                              bond and interest rates (due to
                                                                                                                                              current economic conditions),
                                                                                                                                              Council’s investment return still
                                                                                                                                              remains above target

 Rates in Arrears                                                                                                                            Intent: Ensuring that the amount
                                                                                                                                              of    unpaid    rates     remains
                                           12.0%
   Percentage of Annual Rates in Arrears




                                                   10.3%                                                                                      sustainable    and    does    not
                                           10.0%
                                                                                                         9.6%                                 negatively impact cash flows
                                                           8.3%
                                                                  7.5%
                                                                                                                                             Target: 5% industry benchmark
                                            8.0%                                                                7.1%
                                                                         6.9%
                                                                                6.5%                                                         Result: 5.7%
                                                                                          5.8%                          6.0% 5.8% 5.7%
                                            6.0%                                                                                             Comment:         Arrears       %
                                                                                                  4.5%
                                                                                                                                              progressively decreasing towards
                                            4.0%
                                                                                                                                              target as outstanding balances
                                                                                                                                              are collected
                                            2.0%

                                            0.0%
                                                   Feb     Mar    Apr    May     Jun      Jul     Aug    Sep    Oct     Nov   Dec   Jan

                                                                                Actual             Target




Previous Council Consideration
Nil.

Finance
As above.

Risks & Opportunities
Council’s risk register includes a number of risks that could impact on ongoing financial
sustainability. Effective budget management and reporting is an important risk mitigation tool.

                                                                                                                                                                Page 37 of 43

Section 38

GENERAL COMMITTEE MEETING AGENDA                                                   15 FEBRUARY 2021


Consultation
External Consultation - Community & Stakeholder
Nil.

Internal Consultation
All areas of Council are consulted as part of the regular monitoring of budget performance.

Departments/Sections Consulted:

 X     Chief Executive Officer   X   Community Services                      X   Corporate Services
       Executive Officer             Director                                X   Director
       Executive Support             Community Development                   X   Financial Services
                                     Community Facilities                        ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                                  Property
                                     Waste & Environmental Health                Revenue Services

 X     Executive Services        X   Environment & Sustainable Development   X   Infrastructure Services
       Director                      Director                                    Director
       Community Engagement          Building & Plumbing Services                Asset Management
       Customer Service              Development Assessment                      Buildings and Facilities
       Governance                    Economic Development                        Civil Operations
       People and Culture            Environmental Services                      Disaster Management
                                     Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 38 of 43

Section 39

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 39 of 43

GENERAL COMMITTEE MEETING AGENDA                                                          15 FEBRUARY 2021

  Profit and Loss Statement

  Revenue
     Recurrent Revenue
     Rates, levies and charges                             68,388          69,225            70,254           1,029       103%
     Fees and charges                                        6,640           3,921            4,353             432        66%
     Interest received                                         870             411             454              43         52%
     Sale of Goods and major services                        7,281           3,885            6,558           2,673        90%
     Sale of contract and recoverable works                     23               -               1                1        2%
     Rental & lease income                                   1,197            737              851              114        71%
     Other income                                             796              518            649               130        82%
     Grants, subsidies, contributions and donations          6,115           3,183            3,296             113        54%
     Unitywater Distributions                                5,650            1,914           1,914               -        34%
                                                           96,958          83,795           88,330            4,535        91%
  Expenses
     Recurrent Expenses
     Employee benefits                                     34,752           19,922           19,617            305         56%
     Materials and services                                44,473           23,173           23,191            (18)        52%
     Finance costs                                           1,538            888              850              39         55%
    Depreciation                                            18,963          11,062           11,076            (14)        58%
     Other expenses                                            189             121             125              (4)        66%
                                                           99,915           55,166          54,857             309         55%
OperatingResut =                                             957)           28,629            ATS              BAS
  Summary of Capital Revenue and Expenditure
  Capital Funding
     Capital cash contributions and infrastructure charges   1,521            1,217           1,217               -        80%
     Contributed assets                                      2,000              10              10                -        0%
     Capital grants and subsidies                           11,642           3,143            5,312           2,169        46%
     Cash / revenue                                         18,810           8,673            7,125          (1,548)       38%
     New loan borrowings                                     3,420               -                -               -        0%
     Other capital revenue                                       -               -              11               11        0%
TotalCapitalRevenue                                         87,892         13,043           13,676
  Capital Expenditure
     Contributed assets                                      2,000              10              10                -        0%
     Capital works - constructed assets                    28,867           10,365            9,935           (430)        34%
     Capital works - other capital                           4,111            1,462           1,279           (183)        31%
     Loan redemption                                         2,414            1,207           1,207               -        50%
     Other capital expenses                                      -               -            1,245           1,245        0%
Total CapitalExpenditure                                   37,892          13,083           13,676

                                                                                                            Page 39 of 43

Section 40

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 40 of 43

GENERAL COMMITTEE MEETING AGENDA                                                 15 FEBRUARY 2021

ae
    Cash and cash equivalents                               52,550                 64,578                  57,023
    Trade and other receivables                               9,117                 37,425                   5,440
    Inventories                                                 181                    180                    181
    Contract Assets                                               -                     27                     27
    Other current assets                                      2,912                  3,156                  4,732
                                                            64,760                 105,366                 67,403
    Non Current Assets held for sale                              -                      -                       -
Total Current Assets                                        64,760                 105,366                 67,403
Non Current Assets
    Trade and other receivables                              49,593                 49,593                 49,593
    Investments                                             88,040                 88,040                  88,040
    Investment property                                       3,000                  3,000                   3,000
    Property, plant and equipment                           961,982                927,765                929,355
    Right of Use Assets                                           -                    161                    161
    Intangible assets                                         8,400                  7,964                  7,635
Total Non Current Assets                                  1,111,014              1,076,521               1,077,783
Total Assets                                              1,175,774              1,181,887               1,145,186
Current Liabilities
    Trade and other payables                                  6,512                 12,320                  10,642
    Contract Liabilities                                          -                  1,568                   1,568
   Borrowings                                                 3,152                  1,798                   3,023
    Lease Liablities                                              -                    54                      54
    Provisions                                                7,582                  2,459                  4,630
   Other                                                      4,780                  1,111                   1,561
Total Current Liabilities                                   22,026                  19,309                 21,478
Non Current Liabilities
   Borrowings                                                19,114                 18,493                  18,493
    Lease Liabilities                                           110                    110                    110
    Provisions                                               15,307                 15,399                  15,307
Total Non Current Liabilities                               34,531                 34,002                  33,910
Total Liabilities                                           56,557                 53,311                  55,388
Net Community Assets                                     1,119,217              1,128,576               1,089,798
Community Equity
    Asset Revaluation Surplus                               103,738                86,525                  86,525
    Retained Surplus / (Defeciency)                               -                      -                       -
    Shire Capital                                         1,015,479               1,003,273               992,284
    Current Year Net Earnings                                     -                38,778                   10,989
Total Community Equity                                   1,119,217              1,128,576               1,089,798

                                                                                               Page 40 of 43

Section 41

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 41 of 43

GENERAL COMMITTEE MEETING AGENDA                                                      15 FEBRUARY 2021

     Cash Flows from Operating Activities
     Receipts from Customers                                               82,924             54,078              91,168
     Payments to Suppliers and Employees                                   (81,041)           (46,690)           (82,671)
                                                                             1,883             7,389               8,498
     Receipts:
     Investment and Interest Revenue Received                                3,470              1,564              3,937
     Rental Income                                                           1,194              851                1,003
     Non Capital Grants and Contributions                                    6,087              3,296              5315
     Income Tax Equivalent Received                                          1,200              804                1,857
     Income from Equity Investments                                          1,850                  -              1,396
     Payments:
     Borrowing Costs                                                             -                  -                  -
     Interest Expense                                                       (1,092)              (74)               (143)
     ‘Net Cash Inflow/(Outflow) from Operating Activities =                14,592)            13,830             21,861
Cash Flows from Investing Activities
     Receipts:
    Proceeds of Sale of Property, Plant and Equipment                            -               217                 284
     Grants, Subsidies, Contributions and Donations                         13,162              6,530              8,640
     Payments:
     Payments of Property, Plant and Equipment                             (31,529)           (10,485)           (24,208)
     Payments for Intangible Assets                                         (1,449)             (780)             (1,710)
     Net Movement in Loans and Advances                                          -               125                 125
     Net Cash Inflow/(Outflow) from Investing Activities =                (19,816)            (4,394)           (16,869)
Cash Flows from Financing Activities
     Receipts:
     Proceeds from Borrowings                                                3,420                  -                  -
     Payments:
     Repayment of Borrowings                                                (2,670)            (1,881)            (3,950)
     ‘Net Cash Inflow/(Outflow) from Financing Activities ==                  750,           (881)               (3,950)
    Net Increase/(Decrease) in Cash and Cash Equivalentsheld =             (4474)             7555                 1,042
     Cash and Cash Equivalents at the beginning of the reporting period    57,024              57,023             55,981

                                                                                                    Page 41 of 43

Section 42

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021




                                       Page 42 of 43

GENERAL COMMITTEE MEETING AGENDA                                                         15 FEBRUARY 2021

 Materials and services
 Advertising and Marketing                               202             99               78             21         38%
 Administration Supplies and Consumables                 683            345              282             63         41%
 Audit Expenditure                                       160               2               1               1         0%
 Communications and IT                                   678            387              285             102        42%
 Commission Paid                                         605            363              652            (290)       108%
 Consultancy Services                                    928             424             491             (67)       53%
 Contract Services                                    21,968           11,325          11,235            90         51%
 Contributions, Donations, Sponsorship and Prizes       3,387           1,720           1,699             21        50%
Electricity                                             1,639            959             964              (6)       59%
 Internal Fleet Costs and External Plant Hire           1,615           888             1,093           (205)       68%
 Grants Paid to Community Organisations                 1,552            911             891             20         57%
 Insurance                                               625            605              604               2        96%
 Legal Expenses                                         1,105           600              744            (144)       67%
 Operating Leases and Rentals                            256             175             183              (8)       71%
 Software and Maintenance                              2,003            1,000            998               2        50%
 Subscriptions and Registrations                         263            206             229              (23)       87%
 Waste Levy Payments                                    1,185            676             736             (60)       62%
 Water and Sewerage Charges                             1,091            611             465             146        43%
 All Other Materials and Services                      4,528            1,877           1,561            316        34%
                                                     44,473            23,173         23,191             (18)       52%

                                                                                                       Page 42 of 43

Section 43

GENERAL COMMITTEE MEETING AGENDA   15 FEBRUARY 2021



7   CLOSED SESSION

    Nil.




                                       Page 43 of 43

GENERAL COMMITTEE MEETING AGENDA                           15 FEBRUARY 2021

7    CLOSED SESSION

     Nil.

                                                                Page 43 of 43

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.