Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2015-02-03 Planning & Organisation Committee Agenda

of 92

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 71 of 122

Responsible
   Service                      Key Initiatives                 AS) ELC U LS)               Comments                           Manager

Asset Design & Investigations
                 Asset Responsibility Matrix — Develop                    Completed by Asset Management Team              Design Services
                 n consultation with operational teams                                                                    Manager
                                                             Completed

                 S tandards Review - Staff project to .                   Being handled on an as required basis. Will also be Design Services
                 eview and update standards for design                    assessed alongside the Noosa Design Manual Project. Manager
                 land construction to fit with the           O
                                                              in Track
                  oosa ethos

                 Noosa Traffic Study — New study to                       Coneultant engaged and study underway.          Design Services
                 dentify road hierarchy and guide                         Also collaborating with Department of Transport and Main Manager
                 ntersection priorities                      On Track     Roads on their Northern Area (covering Noosa) Traffic
                                                                          Study.

                  apital Program- Forward planning for                    To commence in February 2015.                   Design Services
                 2014-2015 and input into long term                                                                       Manager
                  apital program                             On Track

                                                                                                        Operational Plan — Quarterly Report

                                                                                                                                          Page 71 of 122
Log in to download the original file

2015-02-03 Planning & Organisation Committee Agenda(PDF, 14MB).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.