Skip to the record
For the highest quality transcripts.

Council archive · source document

Decision Notice - Concurrence Agency - EPA [As Published] · 132008.2078

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                              Officer:          Glen Conforti
                                              Direct Telephone: (07) 5449 5379
                                              Response Address: PO Box 141, Tewantin QLD 4565
                                              Email:            [email protected]
                                              Our Reference:    2008/2078
                                              Your Reference:   213306
20 March 2009

Environmental Protection Agency
Contaminated Land Unit
GPO Box 2771
BRISBANE QLD 4001



Dear Sir

                                      Decision Notice
                                    Integrated Planning Act 1997

Your Department was a referral agency for the above application and provided a response to Council
in a letter dated 18 February 2009. On 19 March 2009, Council decided to approve the application in
full subject to conditions.

Details of the decision are as follows:
1        APPLICATION DETAILS

    Application No:                  2008/2078
    Street address:                  4 Piper Street, Peregian Beach
    Real property description:       Lot 407 P 93116
    Planning Scheme:                 The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Development Permit for Material Change of Use - Detached House
3        RELEVANT PERIOD OF APPROVAL

The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development: -
          Plan         /     Rev.   Plan / Document Name                          Date
          Document No.
          Sheet 1 of 11             Site Plan – Good Building Design              23 February 2009
          Sheet 2 of 11      DC     Sub Level Floor Plan – Good Building          23 February 2009
                                    Design

                                                                                          Page 1 of 12
Full text of the other 11 pages

Page 2

                                                                                       2008/2078



      Sheet 3 of 11       DE      Ground Level Floor Plan – Good               23 February 2009
                                  Building Design
      Sheet 4 of 11       DF      First Level Floor Plan – Good Building       23 February 2009
                                  Design
      Sheet 5 of 11       DG      Sub Level Dimension Plan – Good              23 February 2009
                                  Building Design
      Sheet 6 of 11       DG      Ground Level Dimension Plan – Good           23 February 2009
                                  Building Design
      Sheet 7 of 11       DG      First Level Dimension Plan – Good            23 February 2009
                                  Building Design
      Sheet 8 of 11       DF      Elevations A & B – Good Building             23 February 2009
                                  Design
      Sheet 9 of 11       DF      Elevations C & D – Good Building             23 February 2009
                                  Design
      Sheet 10 of 11      DF      Section 1 – Good Building Design             23 February 2009
      Sheet 11 of 11              Section 2 – Good Building Design             23 February 2009
      836-01 Sheet 1      A       Cover – Spice Consulting                     14 February 2009
      of 3
      836-02 Sheet 2      A       Sub-Level      Stormwater      –     Spice   14 February 2009
      of 3                        Consulting
      836-03 Sheet 3      A       Ground Floor      Stormwater       – Spice   14 February 2009
      of 3                        Consulting

      and as may be amended by these conditions and annotations on the plans.
2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    The building height shall not exceed 8.0 metres above natural ground level and finished
      ground level.
4.    A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of work confirming compliance with the maximum
      allowable building height as required by either the conditions of  approval or the Planning
      Scheme.
5.    Existing trees within the road reserve to the north side of the existing driveway shall be
      retained, in particular the Alectryon coriaceous and Cupaniopsis anacardiodes species.
6.    To ensure screening of the development 3 Banksia integrifolia (200mm pot size) shall be
      planted to northern boundary adjacent the entry and foyer.
7.    Dense landscaping, comprising a mix of native coastal species of ground cover, shrubs and
      trees shall be provided to the whole of the rear boundary for a width of 2.5m and planted in
      accordance with Council’s Landscaping Guidelines.
8.    External colours and finishes of the building shall comprise of muted/environmental tones that
      blend with the natural environment.
9.    Gates must not be installed along the rear property boundary.
10.   The rear fence shall incorporate the following:-

                                                                                     Page 2 of 12

Page 3

                                                                                         2008/2078



      10.1.    Be no more than 1.2m in height.
      10.2     Open construction (at least 50% transparent).
      10.3     Lightweight materials (i.e. timber).
      10.4     Dark colours to blend with the natural landscape.
11.   All vegetation shall be protected from interference resulting from clearing or construction
      activities by:
      11.1     Clearly marking vegetation to be retained with flagging tape;
      11.2     Installing protective fencing around the drip line of the vegetation;
      11.3     Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
               cause interference with vegetation; and
      11.4     Low impact construction techniques are used around vegetation to minimise
               interference with the vegetation.
12.   Cleared vegetation is to be suitably processed by one of the following methods and removed
      from the site:-
      12.1     Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
               loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
               minimum of 10 metres between edges of heaps.
      12.2     Disposal for firewood.
      12.3     Disposal for landscaping purposes.
      12.4     Transport to alternative site for breaking down materials provided that all necessary
               permits have been obtained to allow the alternate site to be used for this purpose.
      12.5     The Applicant is advised that other methods may be considered provided full details of
               the method are submitted.
      12.6     The applicant is advised that burning off is an unacceptable method of disposal.
13.   A minimum of 20% of the site shall be retained as soft landscaping.
14.   Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for building works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
15.   Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall
      not be constructed under overhead electricity transmission lines, or within any easements.
Relevant Period
16.     The Development Permit for a material change of use lapses if the use has not happened by
        19 March 2013, unless an application to extend the relevant period is approved by Council.
Demolition or Relocation of Existing Dwelling
17.   Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
      protected from damage and made safe to the standard required by the regulatory authority;
18.   All infrastructure must be disconnected, capped or sealed including:-
      a)      electricity meters removed and electrical wires disconnected; and
      b)      telephone lines are disconnected; and


                                                                                       Page 3 of 12

Page 4

                                                                                       2008/2078



      c)    high speed data cables and television provider boxes are disconnected and removed to
            the standard required by the regulatory authority;
19.   All building materials containing asbestos, including asbestos cement sheeting or roofing and
      lagging, must be removed from the building and disposed of in accordance with industry best
      practice.
20.   Waste generated during construction must be stockpiled in a centralised location and covered
      as required to prevent material being blown onto adjoining properties including the road
      reserve or food waste from generating vermin. All site waste must be disposed of to an
      approved waste disposal facility either directly or via an approved waste receptacle and
      collection service. Storage areas are to be located near the temporary access to the site so
      that access can be gained with out damage to infrastructure.
21.   All building materials containing asbestos products must be disposed on in accordance with
      industry best practice.
22.   A temporary crossing must be provided to protect road reserve infrastructure including kerb
      and channel;
23.   Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site,
      the relocation site or between the sites must be repaired or reinstated to at least pre-existing
      conditions.
24.   All disturbed areas must be revegetated or otherwise stabilised at the completion of the works.
      Disturbed areas are revegetated using species identified in PSP3 – Landscaping Plants and
      Guidelines.
25.   The transportation of all materials to and from the site must be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying out materials either to
      or from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
26.   A Waste Management Plan shall be submitted for the demolition to the Land Use Section of
      the Sunshine Coast Regional Council – Tewantin office, prior to the development permit for
      building works being issued. The Plan shall contain the following information:-
      MATERIALS ON-SITE                        DESTINATION
                                               Re-use and Recycling      Disposal
      Expected waste     Estimated   volume    On-site *specify Off-site               *Specify
      materials          (m³)                  proposed reuse or *specify              contractor      &
                                               onsite  recycling contractor     &      landfill site
                                               methods            recycling outlet
      Excavation
      material
      Green waste
      Bricks
      Concrete
      Timber         –
      please specify
      Plasterboard
      Metals – please
      specify
      Asbestos
      Other – please
      specify
      NOTE: Details of site area to be used for onsite separation, treatment and storage (including
      weather protection) shall be provided on the plan drawings accompanying your application.

                                                                                     Page 4 of 12

Page 5

                                                                                      2008/2078



Land Development
Roof Water & Stormwater Drainage
27.   Roof runoff from any new building shall be directed to a rainwater storage system or tank that
      is installed to ensure water from the rainwater storage system or tank is used for external uses
      (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming
      pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps
      and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the
      Queensland Development Code (QDC) current at the time of building approval, and shall be
      part of the plumbing application for approval. The location and capacity of the tanks shall be
      clearly shown on the plans submitted for Building Works approval and any overflow shall be
      directed to the Piper Street road frontage.
28.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. Stormwater drainage permitted to drain from the site shall be discharged as shown on
      Drawing No. 836-01A, 836-02A, and 836-03A by Spice Consulting Construction Hydraulics
      dated 14 February 2009.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
29.   All site stormwater drainage shall be by means of a gravity system.
Earthworks
30.   Earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences or structures that border the development site. Fences that are affected shall be
      replaced prior to the Building Certifier issuing the Certificate of Classification.
Site Stability
31.   A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
      determine the soil classification, establish whether any measures are required to protect the
      stability of adjoining buildings and/or structures and/or land, and make recommendations on
      the type of foundation system(s) best suited for the proposed development and recommend
      any measures to prevent slumping during excavations. The recommendations of this report
      shall be incorporated into the design and construction of the proposed development.
Erosion and Sediment Control
32.   Any person acting on this permit shall prevent erosion and sediment export from leaving the
      site. Site control measures such as silt fencing, controlled gravel access to the site and
      controlled disposal of waste, will be necessary.
General
33.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
34.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.

5     REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:




                                                                                    Page 5 of 12

Page 6

                                                                                          2008/2078




 Referral Trigger                Referral Status   Referral Agency         Referral Address

 Site in an area for which       Concurrence       Environmental           Contaminated Land Unit
 area        management                            Protection Agency       GPO        Box    2771
 advice has been given                                                     BRISBANE QLD 4001
 for           unexploded
 ordnance

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.         Rev.     Plan / Document Name                       Date
 Sheet 1 of 11                        Site Plan – Good Building Design           23 February 2009
 Sheet 2 of 11               DC       Sub Level Floor Plan – Good Building       23 February 2009
                                      Design
 Sheet 3 of 11               DE       Ground Level Floor Plan – Good             23 February 2009
                                      Building Design
 Sheet 4 of 11               DF       First Level Floor Plan – Good Building     23 February 2009
                                      Design
 Sheet 5 of 11               DG       Sub Level Dimension Plan – Good            23 February 2009
                                      Building Design
 Sheet 6 of 11               DG       Ground Level Dimension Plan – Good         23 February 2009
                                      Building Design
 Sheet 7 of 11               DG       First Level Dimension Plan – Good          23 February 2009
                                      Building Design
 Sheet 8 of 11               DF       Elevations A & B – Good Building           23 February 2009
                                      Design
 Sheet 9 of 11               DF       Elevations C & D – Good Building           23 February 2009
                                      Design
 Sheet 10 of 11              DF       Section 1 – Good Building Design           23 February 2009
 Sheet 11 of 11                       Section 2 – Good Building Design           23 February 2009
 836-01 Sheet 1 of 3         A        Cover – Spice Consulting                   14 February 2009
 836-02 Sheet 2 of 3         A        Sub-Level    Stormwater      –     Spice   14 February 2009
                                      Consulting
 836-03 Sheet 3 of 3         A        Ground Floor    Stormwater       – Spice   14 February 2009
                                      Consulting

7     ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
                                                                                        Page 6 of 12

Page 7

                                                                                         2008/2078



      1.1.    On a Sunday or public holiday, at any time; or
      1.2.    On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
2.    Prior to the commencement of the development, a plumbing assessment must be obtained
      from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
      Act 2002 (as applicable).
3.    The applicant is advised that this approval does not relate to sewer main setbacks within the
      site or adjacent to the site, as a Building Certifier will assess this during the Building
      Application process and after consultation with Council’s Water & Sewerage section. All
      Building Applications will need a site plan prepared & certified by a licensed surveyor clearly
      illustrating the exact location of any sewer mains and the ‘zone of influence’ of these mains.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Development Permit for Building Works         All Building Works

11    SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Detached House Driveways Code

12    SUBMISSIONS
Not applicable

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable



                                                                                      Page 7 of 12

Page 8

                                                                                     2008/2078



14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Denis Wallace
SENIOR PLANNING OFFICER




                                                                                   Page 8 of 12

Page 9

                                        2008/2078


Referral Agency Conditions                           –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                      Page 9 of 12

Page 10

   2008/2078




Page 10 of 12


[OCR of page images]
2008/2078

 

    

ey ine

» “@éoaccess >.
+ ae eee + Low
wl. i. 7 Notice

. Concurrence Agency Response

        

Conditions of the development approval
No concurrence agency conditions need be attached to any approval.

Additional comments or advice about the application

The EPA has no record of this site being further investigated or remediated prior to its development
to date. Therefore, while no conditions apply, the applicant's attention is drawn to Defence’s
website advice i in regard to the procedure on n finding an object suspected of being UXO.

  
 

 

 

development v ich May:be- ‘tequifed ng ren other regislotion: State’ and/or: Cormonwealth?
Applicants areadvised to check with all relevant Statutory authorities for sich requirements.”

 

Enquiries: '
Ranald Scott, Project Manager (UXO) - “Environmental Protection Agency _-
| Ph: (07) 3224 5644 aoe (07) 3247°3278 email:contamland. uxo@epa. qid.gov.au ©

 

~ End of Concurrence Agency Response ~

 

a tek 7
roy Environimental Protection Agency

    

Page 10 of 12

Page 11

                                                                                                      2008/2078



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a             application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
                                                               (a) a notice giving a decision on a request to change
                                                                   or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                  Page 11 of 12

Page 12

                                                                                                   2008/2078

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
    change or cancel a condition of a development                 relevant period;
    approval.                                               (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval,
    including any condition applying to the
    development, and the identification of a code
    under section 3.1.6;3
(c) the decision to give a preliminary approval when a
    development permit was applied for;


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                               Page 12 of 12

Used in these records

About this file

File size
205 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Concurrence Agency - EPA [As Published].pdf · 205 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.