Decision Notice - Concurrence Agency - EPA [As Published] · 132008.2078
2008/2078
10.1. Be no more than 1.2m in height.
10.2 Open construction (at least 50% transparent).
10.3 Lightweight materials (i.e. timber).
10.4 Dark colours to blend with the natural landscape.
11. All vegetation shall be protected from interference resulting from clearing or construction
activities by:
11.1 Clearly marking vegetation to be retained with flagging tape;
11.2 Installing protective fencing around the drip line of the vegetation;
11.3 Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
cause interference with vegetation; and
11.4 Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
12. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
12.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
12.2 Disposal for firewood.
12.3 Disposal for landscaping purposes.
12.4 Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
12.5 The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
12.6 The applicant is advised that burning off is an unacceptable method of disposal.
13. A minimum of 20% of the site shall be retained as soft landscaping.
14. Security in the form of a cash bond or trading bank guarantee to the sum of $5000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
15. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall
not be constructed under overhead electricity transmission lines, or within any easements.
Relevant Period
16. The Development Permit for a material change of use lapses if the use has not happened by
19 March 2013, unless an application to extend the relevant period is approved by Council.
Demolition or Relocation of Existing Dwelling
17. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority;
18. All infrastructure must be disconnected, capped or sealed including:-
a) electricity meters removed and electrical wires disconnected; and
b) telephone lines are disconnected; and
Page 3 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Concurrence Agency - EPA [As Published]Related documentApplication case desk ↗
About this file
- File size
- 205 KB (small file)
- File type
No other editions are linked here.