PM Submission Support - Michelle Holzberger - MCU16/0153 & REC16/0041
The Assessment Manager Noosa Shire Council 9 Pelican Street TEWANTIN QLD 4565 Dear Sir/Madam, RE: APPLICATION MCU16/0153 AND REC16/0041 215 DAVID LOW WAY PEREGIANBEACH QLD 4573 (LOT 77 ON 5P231615) I make the following submission supporting the proposed Essence of Peregian Beach development application currently being advertised. The reasons for my support of this development are as follows: • I have considered the plans of the development proposed and understand there is a mix of accommodation proposed which will have 20 short term motel rooms and 12 dual use apartments, a small conference centre plus 26 beach houses. • I am supportive of a mix of both short stay and permanent living as I believe these are both very much needed in Peregian Beach and the wider Noosa region, which will be enjoyed by both residents and visitors. • The design is well considered to embrace the village atmosphere and is in keeping with a true Peregian Beach and coastal community feel, being set back off David Low Way to the West, on an infill development site, which is currently vacant. • This project also provides an opportunity for people to move closer to amenities such as the Village shops and restaurants, the supermarket & pharmacy, patrolled beach and direct access to public transport. There are very limited opportunities to achieve this type of development, given the current shortage of appropriate locations in both Peregian Beach proper and the Noosa region. • The project will have a positive effect on the economy which creates prosperity for everyone working and living in Peregian Beach. • The site is complimentary to the Noosa Shire Council's recent works in Rufous Lane and provides an excellent connection to both Rufous Lane and the Digital IT Hub which is owned and operated by Noosa Shire Council. The people working In this precinct will need to live and work close to their employment, which is in keeping with the work/life balance of the Peregian Beach community. ",. ro 9 6 n ••. R: -- p n\ I):"'" . CJ
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
.,
Page 2.
• This project will create much needed jobs both during the construction and post
construction
• The developer is a local resident who has a passion and a proven-track record in Peregian
Beach, which has been demonstrated by the quality of the design and construction of the
Peregian Village Market which has become a great asset to Peregian Beach.
In summary, I support the approval of this development because
/l'l(.. SurJ6h,,~ &'5; 1<; !OdL?0J 1-'1 !/If}4'<WIv-e .
We ~~/ Cle.uY fr7qf ,<; hocf- ~ tlCCO//7(?7cotrci6D-'7
0( ~I
On/ !Jchcot hdiit2tj ()ed~a::I 00 -/k
( 1
~/d t!:aJ!
fc4 co OcaJ~doJ«n rw&~
Signed: -pllh~ Dated.d.ll-/ -.1.b / --.!..-7 .
'-' II
Address:
UA<d )
Used in these records
PM Submission Support - Michelle Holzberger - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
PM Submission Support - Michelle Holzberger - MCU16/0153 & REC16/0041Related documentApplication case desk ↗
About this file
- File size
- 502 KB (small file)
- File type
No other editions are linked here.