Council archive · source document
07/2277 - Operational Works - Landscaping [As Published] · 142007.2277
NEOLONG We Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
4. APPLICATIONFORMS. © 7 TE
1.14. Form1PartA
1.1.1 Ensure that the form is fully completed. |
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
4.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 {f the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form1 Part B-O Supporting Information
4.1.2 Ensure that for each box checked on Form A, the relevant additionat Forms B-O are attached.
1.1.2.4 Ensure that each of Forms B-O which are attached are fully completed.
2. REFERRALINFORMATION = 2 |. ee ee ee tle -.
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals.
3. ~ ENVIRONMENTALLY RELEVANT ACTIVITIES.
3.1 Ensure that Part G is completed if EPA referral is required.
ee : seen come nee -
AS
b
far
epee > ne me oY
af
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
4. ‘ FORM 2 -REQUEST TO CHANGE APPROVAL UM Son .
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
5. PLANS : Coe SD ee
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationat
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. SUPPORTING INFORMATION 2 “LU OST a
6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
thee aR a eT ome
7. FEE OS a ee ee ee ee
7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form.
cae ces eae . o
(OG? See GR
Receiving Officer tS saa
Having completed this form and accepted thg/application, please deliver both to the following IDAS Application Receiving
trays:-
« Ifthe application is for a Material Change of Use exclusively ~AOP1's desk in the Land Use Section.
« {fthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
« Ifthe application is for Operational Works (for parking, access, Sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
« Inall other circumstances - AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.dec
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 19 pages
Page 2
INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006 The completion of ail applicable questions on Part A is mandatory for all applications. Part A must be accompanied by we corte IBA Asshsetent Checklist if required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the ipa.qid.gov.au. Any information requested in the form may be provided in an attachment to the application. For further information about completing the following details, refer to Guide 1. Description of land 1. Street address: fnctudinghouse number, street name, suburbViocality name & postcode) (if applicable) All land the subject of the application, must be "i identified, er, a description ofthe land is not | 33 Hastings Street, Noosa Heads 4565 | . Howe Ve or te rman : re He ay Rect heb (ERAN 2, Name of water body or watercourse, within which the development is proposed: (if applicable) Advice for completing Q2 - Q2 applies if N/A development Is proposed within a water body or watecourse. 3. Lot on plan description (eg. Lot 123 on RP 4567) / GPS coordinates: Advice for completing Q3 - Most land can be identified by alot on plan description, These detais [ Lots 1 - 7 and Common Property on BUP2665 | i i Ih Par aeouanet fom Ste documents or through tte | 4 The above description is for: (tick applicable box) However, if the land on which the development is EX (i) the land on which the development is proposed; or ds have aot on plan description (ie Prop rons cons et Pave 2 ae (ii) the land adjoining the water body or watercourse, within which the development is watercourse) provide - proposed; or 0 an ban ceo rhe C1 (iii) the water body or watercourse. ii) GPS coordinates where there is no adiolnngladiacent Tend | (eo ° Moreton Bay), 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (m? or ha): Advice for completing Q7 - Q7 does not apply if the development is within a water body or watercourse. N/A | | NIA | | 675m2 Advice for completing Q8 - 08 applies if i i is si - i i developments win @ local goverament area. 8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable) Note: Areas below high water mark are not within a | Noosa local government's area unless provided for under the Local Government Act 1993. 9. Port authority for the strategic port land or strategic port land tidal area on which the Advice for completing Q9 - Q9 applies if i . fe ‘tlo) (i i developments on sategic por land ora strategic development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable) port land tidal area, For more details refer to Guide 11 [ NIA | Proposal details 10. Existing use of the land: (eg. vacant, single house, shop etc.) It there is insufficient room available, details may be [ Residential units and Commercial | provided in an attachment to the application, 11. Proposed use of the tand: (eg. 6 unit apartment building, 30 lot residential subdivision, ERA for aquacutture in ponds with @ total area of 7 ha for which wastes are released into waters etc). | 3 residential units and 2 shops | Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part /, etc) Part A must afways be accompanied by other | Part E and Assessment Checklist | completed parts of Form 1. For information about when a part of Form 1 may apply refer to Guide 1. Applicant details 13. Applicant's name: 45. Contact person: identify who is making the application, Th : i eanaleon mate the ing the appkcation, The | Foster designs P/L | | Richard Foster | When signing and lodging this application 14, Contact number: 16. Facsimile number/e-mail address: ecient tty | [OT SHe 168 07 BBt415 manager, any referral agency & the Chief Executive [email protected] (where applicable) will rety on this information when assessing and deciding the application, 17. Postal address: Hite anplicant es compeny- a contact person | PO BOX 86, PEREGIAN BEACH. QLD. 4573. | must be shown. 18. Signature: L2 19. Date: % é ; Si 3 rd October 2007 t
Page 3
INTEGRATED PLANNING ACT 1897
Part A, Version 2.4, 29 May 2006
Land owmer’s consent (if applicable}
Section 3.2.1{3) of the (PA prescribes that an
application must contain, or be supported by, the
written consent of the land owners, if the application
involves:
@ amaterial change of use;
(i) reconfiguration of a fot;
Gi) work on land below high-water mark & not within a
canal as defined under the Coastal Protection and
Management Act 1995,08
{¥) work on rail corridor land defined under the
Transport infrastructure Act 1994.
Section 3.8.1{2}(a) of the IPA provides that
landowner’s consent is not required for a mobile or
20.
Land owner's consent fo the making of this application:
Name Signature, Date
(i) Karabin Pty Ltd y
(i} RJ Selkirk Pty Ltd f
{iii) The Body Corporate ‘Sandpiper
Noosa Heads’ CTS12476
temporary ERA . (iv)
For moreinformationrefertoGudet, =f Leite eee eee - 2+ 2+ dee eee eee eee pee
(v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 32.18) of the IPA requis evidence a a quarry material on State coastal land under the Coastal Protection and Management Act 1996)?
resource entitlement ven application iS
involve 2 prescber State resource. EX NO - go to 024 (AYES - goto 022
Section 3.2.1(10}(a}(ij of the IPA prescribes that . eee: . .
applcaan nae Oe fo be operty made. 22. This application is accompanied by evidence: (tick applicable box)
ee evidence ne resource enntement (1 () of the allocation of, or entitlement to, the resource - attach evidence and go to 023(vi)
CO! hy pee . - ae . . .
Refer fo schedule 10 of the Integrated Planning C1 (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence i i i i i -
raid by the Stato m cupped oft lodging of tis development is consistent with an allocation of, or entitlement to, the resource - go
development application.
CC (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource — go to 023
Advice for completing Q23 23. Evidence of the resource entitlement:
The information in (i} - (v} is mandatory if evidence is . 7 A f ia i
requited under 022 (i) or (i) above. (i) Resource entittement / authority details (vii) Official stamp of the department
The oficial stamp of the Department of Natural administering the resource (if
Resources, Mines and Water is mandatory where the im applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
Section 3.2.1(5A) allows the resource manager to fimit
the time the evidence may be used. 023 (vi) must be ii if
complied ttre envi tne ited {iii) Position of = Officer
(iv) Signature of delegated officer
(vy) Date
(vi) pe date of evidence a
Assessment triggers 24. 1s the IDAS Assessment Checklist compieted and attached to this application?
This checklist does not apply if the apptication requires 5 on
the completion of Parts A and 8 of the Form only. It (YES {J NO - the assessment manager may refuse to accept this application on the
must be completed for ail other applications. grounds that the application has not been properly made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
An application should be accompanied by details to
support the proposal & enable ihe assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
notification to understand the scope of the propesal
and any potential impact
Plan / Drawing / Report Number
(i) Landgraphics
Title
LANDSCAPE PLAN sandpiper
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of fodgement, fails to provide all applicable information required by Part A
and any other retevant part of Form 1.
OFFICE USE ONLY (appiicabie to assessment manager's}
DATE
FEE ($) RECEIVED
(6r1s"
| £]«| 07
RECEIVING OFFICER'S
NAME/S_
REFERENCE
NUMBERIS [o2f2279 |
iP Lintanes
Page 4
4 INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006 Notification of Engagement of Private Certifier (Optionat format) \ ' To. Council. | have been engaged as the private certifier for the building work referred to in this application. Date ofengagement / / Accreditation Number. __ Name: Signature:
Page 5
INTEGRATED PLANNING ACT 1997
Part E, Version 3.0, 3 September 2007
Building &/or operational work assessable against a planning scheme
Nature of the works
1. _\s the application seeking approval of building work assessable against a planning scheme?
No
Yes
1(a) If yes, is the application seeking approval for more than one type of building work?
e@ BX No- Complete Table A
Oo
Yes — Complete a new Table A for each type of building work
Table A
{i} What aspect of the building work is made assessable by the planning scheme (e.g. building height greater than 8.5m, building work on high
fandslip risk area)?
LVANDSCAPING woes
(i) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
1 No
Hi) Yes-Compcte Tao) = PUANS ARE LODGED CONCRRENTLY .
Table Aa)
List of approval reference/s Date approved Date approval lapses
[ 1.
GENERATE ANOTHER TABLE A
@ 2. a” application seeking approval of operational work assessable against a planning scheme?
No
Kes
(a)
{f yes, is the application seeking approval for more than one type of operational work?
No — Complete Table 8
(J Yes - Complete e new Table B for each type of operational work
Page 6
a
(v) Are the works subsequent to a previous Development Permit or Preliminary Approval for another aspect of development?
O
INTEGRATED PLANNING ACT 1997
Part E, Version 3.0, 3 September 2007
Table B
{i) What is the nature of the operational work?
(1 Roadworks (0 Stormwater (1 Water infrastructure [1 Sewerage infrastructure
fl Landscaping (2 Clearing vegetation under the planning scheme CO Earthworks
(1 Drainage works (1) Signage (1 Other — Specify below
[LANDELAGE OPERATIONAL WORKS DW ACOVPANT DA OT Aral |
(ii) Is the application for operational work involving the creation of new lots? oP wo S oT / 1% +
I No
LD Yes - Specify number below
Lo
(iii) What type of approval is being sought?
[X] Development Permit
(1 Preliminary Approval
{iv) Is there a current Preliminary Approval for this operational work on the premises?
KI No
(1 Yes - Complete Table Bfa)
Table Bia)
{4
List of approval references Date approved _| Date approval lapses
N
oO Yes - Complete Table Bib) PLAMWS ARE LOPEED CONCN ERENT]
Table B(b)
List of approval references
Date approved | Date approval lapses
[1.
| GENERATE ANOTHER TABLE B
Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of Method of lodgement
lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works
tinctixding the extent of any out and fil) [ed Confirmed
OFFICE USE ONLY
[Date received | ] [Reference numbers |
Advice for completing Part E
General advice
Q182
Part A must also be completed for all IDAS development applications.
Ail questions must be answered unless, following a response, there is a statement to go directly to a particular question.
A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.
-2-
Page 7
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkist, Version 20, 2 April 2007
Form 1 Development Application
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist’)
IMPORTANT NOTE FOR ALL APPLICANTS:
1, This checkfist was formerly referred to as the “Referrals Checkisf. Some of the ‘Guides’ to using the IDAS Application Forms continua to refer to this document as the
“Referrats Chackist’. Tha name of this checkilst was changed from 25 July 2006 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensiand State entities (2.9. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).
3.. This checkfist Is provided to assist applicants to determine when an appfcation requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager for the application.
Therefore, the completion of afl questions in saction 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A& Bont).
Itls the responsibility of the applicant to accurately complete this checklist.
Section 28 mandatory only if the proposed development is locatad In any part of a wild river area declared under the Wild Rivers Act 2005,
Depending on the nature of the apptication, an applicable State entity may be either the assessment manager or an [DAS referral agency for the application.
‘The assessment manager for the application will rely on the information provided In this checklist (as wall as any material lodged in support of tre eppiication) to Kdentify
any applicabte referral agencies for the application In the Acknowledgement Notice. The assessment manager will also rety on this information when identifying if the
application triggers referral coordination?
9. — Toassist you In answering the following questions a series of guides are available free from the {PA wabsite www.ioa.qid.gov.au. Guide 25 explains the rote of tha 1DAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10, Any other parts of Form 4 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
yaw. ipa. ald. qov,auy.
11,__ Secon 3 provides advio about he refers hat can be equred for applications for buiing work assessable again! he Bung Ret
BNO S
ee
Ne ee aN anecemert etn Ben fr CUIdIienetk tenesesble agaet the Building Roguizton 2006"
j Environmentally relevant activity 1. The application involves: (tick eppicabte box/es)
* For more Information refes to Guide 4. (1 (9 an environmentally relavant activity (ERA) for which a code for environmentat compliance
‘ Untess you answered “none cf the above" to Q1, has not been made - complete Part G of Form
pening ory assessanent by the ( @i) a mobile or temporary ERA for which a code of environmental! compliance has not been
j Yan entty, otter then the admisteing made - complete Part G of Form 1
+ authorty, is the assessment manager for the (ii) none of the above
* application, the adeninistaring authorty is a
{concurrence agency for the application in relation!
; loth mate,
! Note: An application invoWing ERA 19 and/or 20
wil also require camptetion of Part Kr of Form 1
. 01 approval where an allocation under the Water
_ Act 2000 is required. me : — see
Continued overteaf
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, tails to provide the
: completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY mae to assessment manager)
DATE RECEIVED REFERENCE NUMBERS |
1 Tha assessment manager ls responsible for assessing and deciding an IDAS app/ication. The assessment manager for an application is prescribed In schedule 8A of the [PA.
2 For additonal information refer to Guide 6 ‘Does my appication trigger the referral coordination process?’ .
3. The ‘administering authority’ may be either the Emelronmental Protection Agency, the relevant local goverment (for a devolved ERA) or the Quasnstand Department of Primary Industries and
Fisheries (for a detegated ERA).
Page 1
Page 8
INTEGRATED PLANNING ACT 1997 State-controlled road matters For more information refer to Guide 3. Undess you answered “none of the above’ t) Q2, Wn certain circumstances DMR wil be an advice agency, while.in other drasmstances DMR wit be a concurrence agency. Scheduse 2 of the IP Renulation wil assist you to determine where OMR is an advice or concurrence agency for the application. @ IDAS Assessment Checidist, Version 20, 2 Apri} 2007 2. ‘The application involves: (tick appiicabe box/es} (11) development on land contiguoust to a State controlled road and for - C1 (@) material change of use assessable agains! the planning scheme; DD (0) reconfiguring a tot unless - « the total number of lots is not increased; and « the total number of lots abutting the State-controlled road is not increased; 0 (©) operational work (not associated with @ material change of use assessable against the planning scheme or reconfiguring a lot mentioned in (b) ebove}- « associated with access to a State-controlied road; or © for filling or excavation; or « involving the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625 em? that directs stormwater to a State-controfled road. (© (i) development on land not contiguous to a State-controlled road and - 0 (2) material change of use - assessable against the local government's planing scheme; and mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by that schedule; (2 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation and exceeding the thresholds set by that schedule; (©) operational work (not associated with a material change of use assessable agains! the planning scheme or reconfiguring @ lot mentioned in (b) above)~ assessable against the local government's planning scheme; and mentioned in schedute 5 of the IP Regulation and exceeding the thresholds set by that schedule. Bi (i) none of the above Clearing vegetation For more Information refer to Guide 12. Untess you answered "none of the above" to 03, : the application reauites assessment by the Degartment of Natural Resourees and Water (NRW). (tan agency other than NRW is the assessment * manager for the application, NRW is a concurrence agency for the appiication in retation to this matter, tyou Scked 03) of (), your application requires referral to NRW for assessment regardless of whether vegetation dearing fs proposed oF nat. 3 The application involves: (tick applicable boxes) (material change of use - (a) assessable against the planning scheme; (bd) on a lot containing - « acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or « ifthere is no property map of assessable vegetation for the lot - remnant vegetation; (c)_ where the existing use of the land is a rural or environmental use; and (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1 reconfiguring a lot — (a) ona lot containing a category 1, 2 or 3 area shown an a property map of assessable vegetation or, if there is no property map of assessable vegetation for the lot, remnant vegetation; (b) where the size of the lot before the reconfiguration Is 2 hectares or larger; (c) where 2 or more lots are created; and (d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1 operational work - (a) for the clearing of native vegetation where the vegetation clearing is made assessable under Schedule 6 of the IPA; and (b) not associated with a material change of use assessable against the planning scheme mentioned in (|) or reconfiguring a lot mentioned in (ii) - complete Part J of we (iv) none ofthe above. — Oi Citi Strategie port land ' For mare information refer to Guide 11. you ticked () - the relevant Port Authority is the assessment manager fer the appiication. , (fyou ticked (i) Queensland Transport fs a concurtence agency for the application. The application involves: (1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI Act) - complete Part! of Form 1 (i) a material change of use that is inconsistent with the land use plan approved under the TI Act for the strategic port land - complete Part! of Form 1 _Bifiij) none of the above — 4) Land contiguous to a Stato-controlled road is defined In schedule 14 of the IP Reguiaton to mean land - if part of the tand Is within 100m of the State-controted road; or that is past of a future State- conbolled road, Page 2
Page 9
INTEGRATED PLANNING ACT 1997
Acid sulfate soils
For more information refer to Guide 10,
_ Unies you answered none of the above” tp Q5,
Teenie taut essesemeTty
. Han agency other than NRW is the assessment
, Manager for the application, NRW Is an advice
«agency for tha appication in relation to this
matter.
; Major hazard facilities ot possible
«major hazard facilities
For more information refer to Guite 47.
| H you answered "YES" to Q6, the application
Fequires assessment by the Department of
| Ementency Service's
i ttan agency ather than DES isthe assessment
* manager for the application, DES is a
[/eoncumrence agency for the application in
+ ¢etation to this matter.
“Water related dévelopment under the
, Watér Act 2000
{For more information about items (a) - {f), refer
, to Guide 1§. Fer more information about item
-G). rater to Guide 14 Dogs my spotcetion :
£ Uniess you answered “rane ofthe above" 7,
{the appcatonrequtes assessment by fhe
? Departmer ites ate
fan agency other than NRW és the assessment
j manager far the application, NRW ts a
* concurrence agency for the apptication in
[relation to tis matter. =
’
IDAS Assessment Checkist, Version 20, 2 April 2007
The application involves development on land situated in an identified’ local government area
and where the surface of the land is: (tick eppiicatie box)
(11 ()_ below 20m AHO® and the development will involve the excavation of 1000m?or more of
soil or sediment at or below 5m AHD, or
(1 (i) at or betow 5m AHD and the development will involve filling the site with 1000m? or more
of material
& ei none of the above
Does the application involve a ‘material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
&Nno
CI YES -compiete Part L of Form 1
6.
The ‘application involves:
C1 @ operational work, for taking or interfering with water under the Water Act 2000, that is:
{tick applicable box/es)
O(a) ina watercourse, lake or spring, (eg. a pump, grevity diversion, stream re-direction, welr or
dam) - complete Part Ke, Ks, Ks, Ka, of Ks of Form 1 whichever is applicable;
(2) (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
Kt of Form 1;
(1 (c) for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
USE - complete Part Ks of Form 1;
(1 (d) for a subastesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K: of Form 1;
(1 (e) for taking overland flow water in certain areas covered by a water resource plan
compiste Part Ke of Form 1;
(1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Fonn 1
(21 (9) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; or
Bit) none ofthe above.
\ Removal of quarry material from a
jten egency other than NRW Is the assessment
| renager forthe eppfication, NRW is 0
, Watercourse
‘For mora information refer to Gude 16,
"you answered "YES" tp 8, the appfication
D semen began
"coneunrence agency for the appiication in
‘ retation bo this matter,
Note: Part G of Form 1 Is required to be
x Completed as the activity of removing quarry
> material from @ watercourse is atso an
+ Environmentally Relevant Activity (ERA),
a Ooes the application involve development for the removal of quarry material trom a watercourse!
requiring an allocation notice under the Water Act 2000?
{INO
(I YES - comptete Parts Kr and G of Form 1
The Wentifed focal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Sundaberg, Burdekin, Gurke, Bumett, Cabcoiture, Caims, Calliope, Catoundra, Cardwell, Carpentarla, Cook,
Cooloola, Oounglas, Fitzroy, Gladstona, Gold Coast, Hervay Bay, Hinchinbrook, Isls, Johnstone, Livingstone. Logan, Mackay, Maroochy, Maryborough, Mirlum Vale, Mornington, Noosa, Pine Rivers,
Radalitte, Redtand, Rockhampton, Sarina, Thuringowa, Taro, Torres, Townsvitie, Wltsunday.
Austetian Height Datum (AHD},
oo1e
Watercourse Is defined in sch 10 of the IPA.
‘The declared ground water areas are listed in Guide
Referable dam Is defined under the Water Act 2000.
Page 3
Page 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfst, Version 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: (tick the applicable box/es)
work in coastal management dietct | [)() tidal work® as defined under the Coastal Protection and Management Act 1995 (the
* more information about preseribed fidal work ih Coastal Act) that is not prescribed tidal work - complete Part M of Form 1, OF
local goverment tidal areas refer to Guide 24. ii) tidal work i 44 i 12, ,
mu snane othe above” 08, Di thatis prescribed tidal work" other than in a canal'? -compieta Part P of Form 1; of
“ene eppfcation essesement by the C1 Gi) carried out within a coastal management district under the Coastal Act and for ~ complete
» Enviro tect Part M of Form 1 # any box/es (a} to (2) below ere ticked.
D(a) constructing or installing works in a watercourse between MHWS and HAT (ie.
aes ogee hs te apes in . other then thase works in tidal wete) where the development has been determined not
relation to Dis eater. ° to be assessable againsl the Water Act 2000 ;
Local goverment is the assessment manager if (12 .
- ho os (1b) constructing a canal’? intended to be connected to tidal waters;
(Cc) constructing an artificial waterway;
(O@) reclaiming land under tidal water,
(1) (e) disposing of dredge spoil or other solid waste material in tidal water;
(C1 (f) _ interfering with quarry material on State coastal land above high-water mark;
(11g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
CJ (h)_ removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(1) constructing a bank or bund wall to establish a ponded pasture on land, other
' than State coastal land, above high-water mark; or
( (iv)_none of the above.
Operational work below high water | 10, The application involves operational! work that is: ( tick the applicable box/as)
mark (qi) tidaf work's as defined under the Coastal Protection and Management Act 1995 (the
ireve ries shut presct lv Coastal Act) that is not prescribed tidal work - complete Pert M of Form 1; Of
«local goverment fdal areas refer to Guide 24. C0 (i) tidal work that is prescribed tidal work" - complete Part P of Form 1; 0°
Fy oeariarsie eoetarirada CO Gil) carried out within a coastal management district!S under the Coastal Act and for -
1 Quegrestand Transpor aS: Senos i ; in ti -
Okhesa ‘agency of disposing of dredge spoil or other solid waste material in tidal water - complete Part
} Local govemment Is the assessment manager ,
for all prescribed tidal work, jaiming land under tidal water - complete Part M of Form 1, Of
. (C00) reclaiming land under tidal wat
C1() constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
Ew) noneotthe above -
Coastal management . 11. The application involves: (tick the applicable box/es)
* For mora Information refer to Guide 18. (1 (i) amaterial change of use assessable under a planning scheme involving operational
ae axtswered “none af the oo the work carried out completely or partly in a coastal management district's
Environmental Protection Agancy (EPA). {1 (ii) a material change of use assessable under a planning scheme Involving building
Ian agency other than EPA is tha assessment work, carried out completely or partly in a coastal management district that is -
a aan sexton « the construction of a new premises with a GFA of at least 1000m?
cretation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?
Li (ii) reconfiguring a lot assessable under schedute 8 of the IPA where the land is situated
completely or partly in a coastal management district
(1) reconfiguring a tot’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal'2 - complete Part M of Form f
. C1 (¥)_ noneofthe above
10. Tidal work i defined in sch 10 of the IPA.
W Prescribed tdal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or party within a local government bial area,
12 Canal means canal 2s defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined In sch 10 of the IPA. .
4 Prescribed tidal work is defined in the Coastaf Protection and Management Reguiation 2003 and includes certain tidal works completaly of party within a local government tidal area.
15 Coastal management district Is defined in sch 10 of the IPA and means 8 coastal management dlstict under the Coastal Protection and Management Act 1995, other than an area declared as @
coastal management district under section 47(2) of that Act,
8 GFA\s dafined in sch 14 of the IPA to mean the gross floor area. For a definiion of how to calculated GFA, go to the planning scheme agains! which the application is being assessed.
17 Under 117 of the Coastal Protection and Management Act 1995, an application for ceconiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the apptication for the operational works to construct the artificial waterway.
Page4
Page 11
oo
INTEGRATED PLANNING ACT 1997
Development within the fimits of a”
port
For mora information refer to Guide 18. For
information about prescribed dal work refer to
Guide 24.
Htyou answered. “YES" to Q12, the appication
tiggers referral to the Pot Authority.
“The Port Auttiortty is 8 concurrence agency if the
development is —
© win 200m of a shipping channel or an entry
end exit shipping contdor for the port
© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
© within 1000m of a planned port facity
identified ’in a tand use ptan approved under
the Transport Infrastructure Act 1994.
{n all other situation the Port Authorfty Is an
j advice agency,
IDAS Assessment Checkdst, Version 20, 2 April 2007
Does t the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?
KINO
11 YES - complete Part M of Form 1, or Part P of Form 1 ifthe work is prescribed Eda! work
‘Marinas
{ For more information refer to Guide 18. For
information about whather 8 marina ts prescribed
dal work refer to Guide 24, The locel
| govemment fs the assessment manager for al
[ Prescrtbed Odat work.
Wyou answered “YES" to Q13, the application
tigers referral to Fire
Service as an advice agency.
Tidal works In strategic port land tidal
lareas
"For more information refer to Guide 18.
* Untass you answered "NO’ to 014, the retevant
| Port Authority is the assessment manager for the
43. Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?
RINO
(YES - compiete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work
Ooces the application involve tidal works within a a strategic mor land Tidal area”?
No
(DYES - complete Part M of Form 1
4.
application and the Environmental Protection
; nae (PA) and Susension Transoa
i'Heritage 15. Does the application involve development i ina heritage registered place as defined under the
"For futher information refer to Guide 19, Queensiand Heritage Act 1992?
{ tfyou answered “YES” to O15, the application INO
. tiggers referral to the Queensiand Heritana
- Coumed| as concurrence agency forthe - (CI YES - complete Part C of Form 1
1 sopteaton.
? . . 15(b)The application involves: (tick applicable boxes)
CS(p neapptcaton weve efealt he Ey (i) amaterial change of use assessable against the planning scheme and the lot shares a
. as an advice common boundary with a protected area or registered place under the Queensland
+ agency for the application Heritage Act 1992;
, Di) reconfiguring a lot if the lot shares a common boundary with a protected area or
' fegistered place under the Queensland Heritage Act 1992;
: (1 (iii) none of the above.
‘Declared catthmerit areas 6 The application i is in an area za declared to 5 be acatchment area under the Water Act 2000 and
iF information, in Kstof tha involves: (tick the
cae cetana Cn Cee ont |
j refer to Guid (@ reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
1 Untess you answered ‘none of the above” to (i) development assessable against the planning scheme involving the establishment or
' Q16, the application requires assessrter by the expansion of a waste water disposal system, other than a disposal system for carrying
oa enna ase out an environmentally televant activity under the Environmental Protection Act 1994;
{tan agency other than NRW ts the assessment EX (iii) none of the above
_ manager for the application, NRW Is a
* poncurrence agency for the application int
‘etation to this matter.
18 High water mask is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring Ode.
149 Marina bs definad In the Transport Operations (Maritime Pobution) Re
195.
teguistion
20 Strategic port land Udal areas ara the areas generaly $0 metres seaward of high wates mark ojacent lo szategic port land,
PageS
Page 12
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Contaminated tand 17. The application Involves: (tick the eppiicable box/es)
Applications involving material change of use (2 @) reconfiguring a fot for which all of part of the premises are —
and! this
ee mou o eho aces {a) premises mentioned in the IPA, schedule 8, part 1, table 2—
For mare information refer to Guide §. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above" to ¢ item 6, including the exemption otherwise provided for by paragraph (e); or
an, hide -actenry rooney dpa « item 7, including the exemption otherwise provided for a mining activity or petroleum
Enyironmental Protection Agency (EPA).
agency other than EPA's the assessment activity; or
manager for the appication, EPA wil be a (b) in an rea for which an area management advice has been given for unexploded
cancun agency for Re appicabon In ordnance - complete Part N of Farm 1
Electricity infrastructure
For more information cefer to schedute 2of the 1P
Regulation.
Uniess you answered "norte ofthe above" tb
+ O18, the application riggers referral to the
@ favour of as advice agency.
é
18. The application involves: (tick the applicable box/es)
O(i) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 4
EK (il) none of the above -
= . : we ty ee
C1Q) reconfiguring a fot where any part of the lot is -
subject to an easement in favour of a distribution entity or transmission entity under the
Efectricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a tot If~
© any part of the premises Is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easements for a transmission
grid or supply network under that Act, and
© any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement,
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
(1) operational work that |s filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
@ any part of the premises Is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act.1994 and the work Is located wholly or partly in
the easement;
the work is located whally or partly within 10m of a substation site;
E4(v)_ none of the above.
Ot
Oi
Land designated for community
infrastructure
. Appiications involving devetopment on tand
designated for community infrastwcture may
tigger this referral
For more information refer to schedute 2 cf the
(PReauiaon.
if you answered “YES” to 015, the applicatton
reqube assessment by Ie cet
Oe ee a ieee supose,
tan agency other than the designator is the
i assessment manager for the appiication, thé
designating agency will be a concurrence
agency for the application in retation to this.
matter.
19. Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behaif of the State; and
(iii) other than development -
{a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
BINo
Dyes
Page6
Page 13
INTEGRATED PLANNING ACT 1997,
SEQ Regional Plan
For more information refer to scheduta 2 of the
IP Regulation.
Reter to Chapter 2, part 5A end schedule 10 ct
the Intearated Pianning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Unies you ersyrered “none of the above" to
20, te apgtcaon requires assessment by the
Office of Urban Management
“Fishetiés matters
{ For mora information refer to schedule 2of the IP
Regutaton,
. Uniess you answered ‘none of the above’ to
‘00, lahaqej-rsddie tpresensee bl
Prtrras
;
Hf an agency other than OPISF Is the assessment]
manager for the appication, DPI&F Is a
+ concurrence agency for the application in
tetation to iterrs (7) - (N) and an advica agency
_Inretton t tem (Vp,
TOAS Assessment Cheekdist, Version 20, 2 April 2007
20. The-application involves (tick applicable box/es) -
©) (i) amaterial change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
OO (i) an urban activity -
(0 inanarea included in a structure plan where the IPA, section 3.1.6
applies;
(2 inanarea not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
CD (ii) intensive animal husbandry, or
LD (ll) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
0 (i) anurban activity and not specified in section 2.4(2); or
(i) residential development involving a ruraf residential purpose and not
specified in section 2.6(2)
{c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
O (i) anurban activity and not specified in section 2.10(2);
© (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
(ii) intensive animal husbandry
C1 (ii) reconfiguring a fot-
On land (n a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
21. The application involves: (tick the applicable box/es)
(1) ()_ an assessable material change of use for aquaculture - complate Part Or of Form 1;
(1) (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Ferm 1;
O (it) assessable operational work completely or partly within a declared fish habitat area.
complete Pert O2 of Form 1;
(J (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
C1 (y) development assessable under the IPA, schedute 8, part 1, on land that adjoins a °
declared fish habitat area;
{X] (vi)_ none of the above.
Page?
Page 14
INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport
Fox more Information refer to Guide 23, schedule
SA of the IPA, 8 schedule 2 of the IP Regutation.
Uniess you answered “none of the above’, the
application diggers referral to QT asa
concutrence agency.
Railway safety and efficiency
For more information refer to Guide 23, schedule
GA cof the IPA & schedule 2 of the IP Reaulaton.
Unies you answered ‘none of the above’, the
appication triggers referral to OT as a
concurrence agency,
* Moonie to Brisbane pipeline
- For more information refes to schadute 2of the IP
« Requiation.
Unies you enswered ‘none of the above’, the
‘eppication tiggers referral tp the hotder of
pipeline cence No ¢ issued under the Petroleum!
Act 1923, currently Santos ONT Pty Ltd, for
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tck the appficable box/es)—
24,
__Billiv) none of the above.
23.
(2 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
D Gi) reconfiguring a tot—
(la) oniand that is completely or partly within a public transport corridor, and the
total number of lots increases;
(Jb) on land that is compietely or partly within a future public transport corridor or
an airport's public safety area;
C1(c)__ onland thatis within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is §000m? or greater;
()(g) _ for a residential purpose within the 25 ANEF contour for an airport;
Cl (e) for a residentia! purpose resulting in 100 or more allotments.
(1 fit) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(12) is completely or partly within a public transport corridor or a future public
transport corridor;
(1b) will result in work that encroaches into an airport's operational airspace.
The application involves: (ck the eppicable box/es}—
0 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule. .
D1 Gi) reconfiguring a lot—
{J (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement,
(J (b) _ onland thatis within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater,
on land that abuts rail corridor land, commercial corridor and or future raifway
land, and the total number of lots increases;
on land that abuts rail corridor land, commercial corridor {and or future railway
land and an easement abutting the corridor or future railway land Is created;
(1) __ onland that is completely or party within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(D6 _ for aresidential purpose resulting in 100 or more allotments.
D iii) operationat work assessable against the planning scheme, but not associated with a
material change of use mentioned in {i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m?, on land that—
(2) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
((b) _ is completely or partly within future railway land, or a railway tunnel easement,
C6) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
[1] (iv) none of the above.
The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and Involves: (tick the applicable bax’es}—
[i a materia! change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement
(2 (ij reconfiguring a tot
L fill) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling nol associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
EX] (iv) none of the above,
Oe
Ow
Pages
Page 15
INTEGRATED PLANNING ACT 1997
Koala habitat area
For mora Information, refer to Guide 26 and
schedule 2 of the IP Requiztion.
‘Untess you answered “none of the above”, the
IDAS Assessment Checkitst, Version 20, 2 April 2007
25. The application involves: ftick the applicable box/es}—
(i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that Is not for a domestic
applleation requires raferra! to the Emronmerital activity and will result in -
Brotection Agency as 2 concurrence agency. Ci (a) dearing of native vegetation over an area greater than 2500m?,
(J) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
0 © anextension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;
(1 @) extracting gravel, rock or sand from an area greater than 5000m?;
C1 €) excavating or filling an area greater than 5000m?;
(2 (f) additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
(i) reconfiguring a fot In a koala conservation area or koala sustainability area that will
fesultin-
(a) anincreased number of lots;
(1 () clearing of native vegetation over an area greater than 2500m?.
D (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring @ lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2600m?.
(2 (iw operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a fot mentioned in (if) above) that is not for a domestic activity
and will result in -
(J (a) clearing of native vegetation over an area greater than 2500m?;
‘ (1 (b) extracting gravel, rock or sand from an area greater than §000m?,
(1) (¢)_ excavating or filling an area greater than 5000m?,
Bl (\)none of the above. oe ae -
“Wild river area 26, Does the application involve development in a vad river area declared under te Wid Rivers Act
+ For more information, refer to Guide 27 2005?
“you answered YES to Q26, you must atso [INO
* completa section 2 of this checkiist. This wil
enable you to determing if your application can (YES
proceed in a wid river area and which reterral
agency wil assess your appfication against the
Wild Rivers Code, or if the proposed
davelopment is “prohibited” In a wild river area.
Note: Development can be ‘prohibited’ in a wild
fiver aroa because the appication cannot ba
socepted by the assassnent manager.
‘Preliminary Approval
iooeereara vee Gaacimntacl
ne Department of Local
7 “Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the Infegrated Planning Act 1997?
{XI NO
CyYes
- Wetlands
Domesic activity means the construction or use
of a single residence on a lot and any reasonably
associated buiding or structure. Examples of a
buflding or structure that could be reasonably
associated with a single resktence include:
caretaker’s residence, granny Rat, building or
, Stucture used for a home business,
Note; Wetland Is defined In the Integrated
Planning Regutation 1993.
Uniess you answered “none of the above” to
28, tha application Involves referal to the
28. The application involves: (tick Ure applicable boxes) -
C1q@_— amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
OO (i) reconfiguring a lot -
in of within 100m of a wetland that will result in
D [a) more than 10 lots being created; or
C2 (b) lots less than 5 hectares;
(iil) none of the above
Page$
Page 16
INTEGRATED PLANNING ACT 1997 Conservation Estate Urban purposes is defined in the integrated conservation, nurad, natural or widemess area . purposes’. Untass you answered "none of the above” to 02%, the application involves referral to the: ” agency for the application. 83 an advice IDAS Assessment Checklist, Version 20, 2 April 2007 29. The application involves: (tck the appicable boxes} [2 @ a material change of use for urban purposes that is in or within 100m of any of the following - Da) a protected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992;; (F(b) a State forest or timber reserve under the Forestry Act 1959; (1 (©) amarine park under the Marine Parks Act 2004; (1d) arecreation area under the Recreation Area Management Act 1988; (Je) a world heritage area listed under the World Heritage Convention; [1 (f} Brisbane forest park under the Brisbane Forest Park Act 1977. OD Gi) reconfiguring a tot if - O(a) any part of the lotis situated in, or within 100m of, any of the following - O)() — aprotected area, forest reserve, critical habitat or area of major interest under the Nature Conservation Act 1992; (O@) a State forest or timber reserve under the Forestry Act 1959; 0 (ii) a marine park under the Marine Parks Act 2004; . CQ) arecreation area under the Recreation Area Management Act 1988; ‘ (Cy) __ aworld heritage area listed under the World Heritage Convention; Brisbane forest park under the Brisbane Forest Park Act 1977; and (21 (b) the reconfiguration involves more than 10 lots being created, or any tot resulting from the reconfiguring Is less than 5ha; DAW none of the above. Page 10
Page 17
LAND GRAPHICS
DRAWING TRANSMITTAL REGISTER
LandGraphics
Landscape Architects
Principal: Robert J. Burrell B.sc.G.0.LA. AALLA
Second Floor. Esplanade and Second Building, Cotton Tree
P.O. Box 18 Maroochydore 4558
Telephone (07)5443 4044
Facsimile (07) 5443 4534
Mobile 0417 627670
To: Foster Designs Attention: Richard Foster
Project: Sandpiper Issued By: Margaux de Bruyn
33 Hastings St, Noosa Heads
JobNo | Day: 28 | 03 | 03 | 22 | 23 | 02 | 02 | 02
LGFD 1227 Month: 09 | 10} 10] 10] 10] 11] ity tl
Year: 07 | 07 | 07 {| 07 | 07 | 07 | 07 | 07
Drawing No. / iption Drawings sent / Issue
Lv SKETCH for Discussion
L’ CONCEPT LC 01 01 of 01 AJA
Pool Sketch for Discussion
Pool Sketch for Discussion No. 2
OPW Overall Lay LAO] 01 of 02
OPW Schedules, Spec LA02 02 of 02
Distribution No. of, ies / Electronic (E
Foster Design (Richard Foster 1 JEJE JEJE |S JE
Clients (Mr & Mrs Selkirk 3 E|2 /E
Reason for Issue
P Preliminary TT Tender P P ||P
A Approval C Construction A AJA
X_Information _R_as Requested x Xx
Please contact us if copies received are not clear
Page 18
Een
i h CONSTRUCTION DETAILING: LEGEND
{ PLEASE NOTE THAT ONCE OPERATIONAL WORKS Sandpiper - 33 Hastings Si, Noosa Heads
APPROVAL HAS BEEN SECURED FURTHER
ry NSC APPROVED HASTINGS STREET REDEVELOPMENT DOCUMENTATION AND DETAILING MLL BE Hardscape
GRANITE PAVEMENT TO EXTEND TO SHOPFRONT UNDERTAKEN FOR CONSTRUCTION ISSUE. a P
| \/ AND DOWN DRIVEWAY AS SHOWN THIS MAY INCLUDE BUT [S NOT LIMITED fea
(refer finishes schedule) TO: DETAILS OF POOL, TIMBER CONSTRUCTION, FG) PAVEMENT BANDING
rr REAR FEATURE FENCE, SIGNAGE, TRELUS, TT
SEATING AND BINS 4 EHH FEATURE PAVEMENT LINE OF BUILDING OVER OUTDOOR SHOWER ANO DIMENSIONING FER PAVEMENT AREAS & COPING
BY NSC [ ‘BARS’ EXTEND INTO STREETSCAPE (refer fist level plan below)
rH TO CREATE INTEGRATION WITH SHOPFRONT
(refer finishes schedule) PLANTER WALLS
HAY eee SCORE Ee 1 \ Fl
a —— SM Fe soem
I i { f (|| | FIT Tm#ER eonroWaKe sears
|
[© _a| Fearne cousros
RETAIL 1
SEATING, BINS AND —
STREET UGHTING
:
L
L
x
By N
RETAIL 2
“TTT t ry |
RELOCATE KERB& I CARPARK
CHANNEL FOR’ o i -LL-
DRIVEWAY wounne | Bauen 7 | —||—— f--—- --
aNDMakecooD)=— ff USS ett ttt he Te et ee | pp occ ttre L Pott aman nn 4 |
ROADWAY I 1 I Fe ee EE pe a t
REQUESTED MOVE TO CI
NSC PROPOSED Elaocarpus TIL
obovatus STREET TREE LI PohofoJofofoyc '
AS SHOWN RATHER THAN = ~ =
‘AS NOMINATED ON —<—== = = n=
GAMBLE MCKINNON = $ 3 38 3 a 3 eustTine SEWER
GREENS PLANTING PLAN EXISTING STONE PITCH TO BE CAPPED &
NSC APPROVED HASTIN EET REDEVELOPMENT
TO ALLOW BETTER SIGHT J, * GRANITE PAVEMENT EXTENDS TO SHOPFRONT WALL TO BE RETAINED REDUNDANT PIT
UNE AND ALLOW ee OW! DRIVEWAY AS SHOWN BOARDWALK WATH GENCH "AND CUT BACK IF TO BE MADE SAFE
FOR DRIVEWAY NECESSARY TO COUNCIL
ONDENING {afer finishes schedule) SEATING AND FEATURE BOLLARDS REQUIREMENTS
a (lo future detail)
| ( jround Floor & Basement | ntry sweat OUTDOOR SHOWER PAVED BOARDWALK
(to future detail)
/ ( NSC COUNGIL BOARDWALK
PLEASE NOTE THE EXISTING PROPOSED ARTWORK
DRIVEWAY FOR THE PREMISES FIXED TO BOUNDARY POOL GATE —s a AO ONTING AND
SHARES THE SAME LOCATION. WALL PROVIDING (roter finishes schedule) @x DI ” {BENCH SEATING ON NSC
{7 WOULD BE ASSUMED THAT THE INTEREST ON EXITING VENTILATION c 4x MYO all | S32 — FAND TO BE RETAINED AND
STREETSCAPE DESIGNS HAVE THE LOBBY voip PRIVACY SCREEN TI "73 PROTECTED DURING CONSTRUCTION
ACCOUNTED FOR SIGHT LINES. (Wo Architectural detail) 4xDOR yi? j ‘
AND VEHICLE ACCESS, TORERGOLA OVER jPeeSzun WES _ 3x CRI ped {x008 ox 3 } f=, (rater photos)
TRIANGULAR SHADED AREAS 1x DOR exe exes ie Rs 8x0) r jo
REFLECT SIGHT LINES. ereerraermrperee er Speer meer: \ sebinne, \\ Saimrszen| eons. \\ tM -/ == (aiOwENTS
f = — t ‘ T == fran cme | Gocgaen J
—.-—«s§s = >?—- | PROPOS! AR: yaaa Ty TAA u —— ‘A C1107 | OPERATIONAL WORKS APPLICATION | MiB
= SG H LORNA = < CECCeECrey CCU at WHEN : = » lear | suaceprorcewarrcanion — | us
— F pTORMW perp BS
fe TANK | T oe
ee aaa a 23
= " al ee Te rie i =
=| ; Sx DIASS. jae AX MET tho 3x BAC cit Suna ce AEN \ _—=
—— = Sx TEC {15x D1 bre 46 DIA Be desis 5x WES zen Sx WES zen \ =
[c.f 1x PAN pen 4x DIA SS 6x DIA bre 7x DIA bre TCG = =
‘ed LOBBY 4x PIT cho } \ =! *
fo 2xMYO ell ; r= = 2
5 — PROPOSED RIVATE TT Fatt i ; =
i = wanda. IMT DEVELOPMENT. eee ts be ©
a fp 4 4x TECH He =
‘View trom Main Beach, Noosa looking south to —{~— -— tained lip t —
development site with existing boardwalk, seating, and 3] \___}} | trellis tt x MRE ano: t 3 4
vegetation including Paim, Pandanus and underptanting 4 oe 4x DIA bre A, 5, EF TOR 'GECOPING LANDGRAPHICS
that is to be protected and retained iad a «TEC. = | % <q =
erent Lit a ce ae = Re 5.567]
cowie eal nl _ SEN: eur Eee [=e OF STEP Laupeeare ancusreers
C POT tH t * | RES 233 acca Dab md
el t il il & ERP Og sTeP mee AE ET
a eh ; I: Sy x | ES RL 30 =e
* 6 t t J =e BASEDF POOL
Popa ‘ X H x Fr 4 Cd x kx kD Panis x s = do lad one eeege ee
CARRS EREEES = a iw L {oR FPN ; rep OF LEDGE an
i 3 2 3 3 ia = J " Tf = SANDPIPER"
\ 3 8 < 1 == 33 Hastings Si, Noosa Heads
VENTILATION ‘ix PIT rho! = =
4 volo ‘4x WES zen = . i int Ver
° n Fl VENTILATION MOUND SOIL UP. uy ne Karabin Pty Ltd Joint Venture
3 voID To 800mm ABOVE 3x MYOat\ ——
Zé PERGOLA OVER FGL TO ALLOW St EUG oi . —
TO FUTURE DETAIL ’ TREE PLANTING ix DOR exc ‘
; : First [evel & Beach AXccess mea = = Foster Designs Pty Lid
showing vegetation to be protectad and retained oa RETAINMENT AND Oey te
LANDSCAPE PLAN FOR aacensi UNDER Lanse Ee
PROPOSED ARTWORK GLASS POOL FENCE A ene REAR BOUNDARY OPERATIONAL WORKS
FIXED TO BOUNDARY AND POOL GATE (el plan above FENCE AND GATE Overall Layout
OPERATIONAL WORKS WALL PROVIDING DENOTES BOUNDARY e) {(reter deta)
VIEW INTEREST OF PRIVATE / COMMUNAL
WHEN ENTERING LOBBY FINISHEO LEVELS: space | WATER FEATURE: vor om |e
ALL LEVELS SHOWN ON THE LANOSCAPE PLANS CREEK EMERGES FROM PALM GROVE TO FLOW THROUGH aa ne
ARE FINISHED LEVELS OR LEVELS TO THE LANDSCAPE AND SPILL INTO SMALL PLUNGE POOL (2.4m i i ws
TOP OF THE FINISHED SURFACE. INTERNAL DIAMETRE), FEATURE STONE/ PEBBLES CONTINUE : « [ome
. TH BASE OF POOL TO SIGNIFY CONTINUING i oct soar
33 Hastings St, Noosa Heads PLEASE REFER TO THE ARCHITECTURAL FLOW. CREEK THEN CONTINUES ON OTHER SIDE WHERE IT EXITS a
DOCUMENTATION BY FOSTER DESIGN PTY LTD THROUGH MAILBOX OPENING IN SHOWER WALL AND IS FILTERED om | iaeen
FOR STRUCTURAL LEVELS AND AND RECYCLED GACK TO CREEK BEGINNING THROUGH STONE ae To ce me
OTHER INFORMATION. SHOWER BASE.
Lar izz7| Lact OV OF oz 8
Page 19
Sandpiper - 33 Hastings St, Noosa Heads Sandpiper - 33 Hastings St, Noosa Heads
CODE BOTANICAL NAME COMMON NAME MATURE | MATURE | FLOWER COLOUR | POTSZE | QUANTITY EXTENT OF WORKS NOTE:
HEIGHT | SPREAD Contractor should take full account of documentation of CMa 3. COC NERISED. wove MATERIAL 5. TURF - SUPPLY AND LAY Advanced tree stock planting
. ‘Engineer and Electrical Engineering Plant mata“ial js to be approver superintendent prior to Empire “Sapphire” approved) selection to Noosa Shire Council
TREES Works. Landscape works ae ‘a cide the fatiowing: planting. Planting is to be cared out In a manner consistent . pipe Zoysia depth - 25 (or siewar approval and ‘quidolnes.
1. Topsoll- Supply and incorporation Tope guyed and suahod paper Dela Agvanced B.Turt to be tld within 24 hours of Se ston 150
CAR acu Carpentaria acuminata Carpentaria Palm 50m | 30m | - 100L 3 2. ‘Shaping of gardon areas Container Ptanting. Smatier piant stock Is to be staked as Ce toa Faisal eare err Literer
PAN pen Pandanus pedunculatus Screw Pine §.0m 4.0m : x-ground 4 3. Containers od Plant sere - Supply and instattation eee, ieee spaunct pass righ sootbas of plamt at oquivatent es per manufacturers recommendations,
x ifoli i 4 nm ~ Supply and Spread of plant ¥ a 6. Turf to be close butied and rolled in accordance wan 2100 x 75 x 75 Hwd stakes. All
PIT tho. Pittosporum rhombifolium White Holly 5.0m | 2.0m White 100L 3 5. Tut Supply & Lay accepted oe 10 ensure a smooth even Surface Stakes to be chaméared, centraty
8 of works PLANT STOCK NOTES Practice Bointed & driven vertically into
Je the rootball
SHRUBS Container sues on ten win Potsin milimetves & Bagsin lures. 6, MAINTENANCE OF LANOSCAPE WORKS Grouse °
+. TOPSOIL - SUPPLY AND INCORPORATION may be re janis are: ; 8. Monitor plant performance and st ress constantly and take Approved securing material such
. ; ie 3) Undersized proportional to specified container stze or te remedial action Soll moisture levels are i
DIA bre Dianella brevipedunculata Flax Lily 07m | 07m | Bhe 440mm 80 | Planing areas ao lobo prouressvey fled wih pram ithe rot system underdeveloped See ae ctv ecabishenen ismavhesuin tes nie 8
DIASS Dianella "Sitver Streak” "Silver Streak" 0.7m 0.7m Blue 140mm Kr d garden mix’ type. Soil suppiler as well as intended mx ») Oversized 4 proportional fo specie container size or db. Prune and shape all shrubs and toes es sequired tops. secured jooaaby ree &
, a . severely root bound . Clear unk to 1200mm & ches xed 10 stake wil .
BAC cit Backhousea citriodora Lemon Scented Myrtie 6.0m | 20m | White 300mm 10 55 tn be nominated. S08 5 10 be mounded (2 facitate good Unbalanced or uncharacteristic of normal or spectfiog Te anal Formed nas #
: Grainage to hardstand areas (max. 1:3 grade) and is to finish jemove yy inspection
CRI ped Crinum pedunculatum ‘Swamp Lily 4.5m 1.5m White 200mm 9 50mm bolow edging after setilement. Organic additive o iveleaeeers the hopee’ sc envro a. den beds at $ months {low phosphorus type) Wet 400mm, nom, composted organic
i i Similar i incorporated throughout Suitably acclimatised for the specific environment . Contracts H maintain to date writien log book mutch ot NSC approved. Form
DOR exc Doryanthes excelsa Gymea Lily 20m | 20m | Red 200mm 5 elias ielieGeulansli Res the ©) diseased, infested with pests or suffering trom other © toord inepection sbservations and avin Turtte shallow dish drain to base of tree.
EUG rei Eugenia reinwardtiana Beach Cherry 1.5m 1.5m White 200mm 8 A slow release fertiliser such as “oSmocote” or lis equivaient is form of significant stress Cone. Mound st pit ego
MET tho Metrosideros thompsonii NZ Christmas Bush 6.0m | 20m | Red 300mm 6 also 10 be Incorporated wath Individual plantings in accordance Hen Troe pit be excavated to min.
WES zen Westringea zena Zena’ 1.0m 4.0m White 200mm 2 wah ne manlecturersrecommendaions: Segante Saronic sro be Tea Tree Fines mulch to 3 agah $0 fable pen asd 4 ‘ope Sin
to « predominant depth of 100mm ater settlement. " Ce ~* 20% onganie Content, light
GROUNDCOVERS 2 SHAPING OF GARDEN AREAS / TURF MOUNDS Mulch to be graded 10 aveld placement ageinet green plant ss compaction only.
fo tooinata dreinage of onnece war nd fo show planting to ‘stems and overflow onto pavement, tawn otc. 3 : tex 2 organic content), Backéil
inti best advantage. Contractor Is 0 seek Confirmation of finished 3 original subgrade material, light
MYO elt Myoporum ellipticum Coastal Myoporum 0.3m 1.5m White oer 17 lovels prorto final ptantings end apptication of . E 5 z compaction only. Raotball to sit
TEC hil Tecomanthe hilli ‘Roaring Meg 0.3m 1.5m Orange 140mm, 10 ‘All gerden beds to be well drained. Drainage chall be provided 2 on lop of backfi
for in areas of that stay saturated for extended periods to the 3 Slow retease fertiliser to
TURF potential detriment of plantings. = manufacturers specifications
MAROWOO! OD DRESSED Ensure pat Cultivate subgrade to 150 depth
a ig “Sanphire® “ . edges are
Empire Zoysia “Sapphire’ ‘Sapphire’ 25mm POSTS WITH ARRASSED TOUGHENDED GLASS porous
EDGES BOLTED INTO POOL GATE & FENCE
A BLOCK WITH ANGLED
TOP AND FEATURE
PLANT SPECIES SELECTION: ROUTED BANDS AS SHOWN —_ .
PLANT SPECIES HAVE BEEN SPECIFICALLY 3 PLANTING DE.TAIL-ADVANCED STOCK NTIS
SELECTED FOR THIS HASTINGS ST PROJECT:
- THAT ARE NATIVE OR NATURALISED TO THE NOOSA AREA
+ TOLERANT OF THE HARSH COASTAL ENVIRONMENT
- PERFORM SPECIFIC FUNCTIONS AS PART OF THE PLANTED LANSCAPE,
INCLUDING, SHADE, FRAMING, BORDER DEFINITION AND SCREENING ,
- ARE AESTHETICALLY PLEASING AND FIT THE LANDSCAPE STYLING CONSTRUCTION DETAILING:
- FIT WITHIN AND ARE SIMILAR TO THE HASTINGS ST PLEASE NOTE THAT ONCE OPERATIONAL WORKS
STREETSCAPE REDEVELOPMENT APPROVAL HAS BEEN SECURED FURTHER
DOCUMENTATION AND DETAIUNG WILL BE
UNDERTAKEN FOR CONSTRUCTION ISSUE.
= THIS MAY INCLUDE BUT IS NOT LIMITED
HARDSCAPE. FINISHES SCHEDULE, by TO. DEALS OF POOL TMBER CONSTRUCTION,
° “ SIGNAGE, TRELLIS,
Sandpiper - 33 Hastings St, Noosa Heads we GUTOGOR SHOWER, es DIMENSIONING
TYPE COLOUR FINISH SUPPLIER CONTACT
PAVEMENT BANDING ‘Quarriedstone - Mushroom’ | Finely textured non-stip paver | CHELMSTONE AMENDMENTS.
400 x 400 x 40mm paver laid over concrete base to Rick Otterea aa OPERATIONA. | APPLICATION =
i 4 a for HORS ry
modules manufacturers specification Ph: 07 32793177 B [0211-07 | AMENDED POR OPW APPLICATION a
GRANITE PAVEMENT NSC Approved grey / green Textured finish and pavement | BETTASTONE Pty Ltd
granite and pink granite pattem in match to approved j Darren Bartiett fl 3
paver modules streetscape redevelopment =| Ph: 03 9369 1122 1s
PAVEMENT AREAS & “Warickstona - Ivory’ 400 x Finely textured non-siip paver | CHELMSTONE ee 200—
COPING 400 x 40mm paver modules - | laid over concrete base lo Rick Otteraa i
FOR COPING cut to 400 x manufacturers specification Ph: 07 32793177 . . =
200 x 40mm BOLLARDSAT SLATS TYPICAL. DETAIL BOLLARDSAT GATE TYPICALDETAIL 120@A3 1
PLANTER WALLS Blockwork rendered to match | Render texture to match refer Architectural i
general building render generat building render documentation ALLOW FOR BIKAFLEX OR AN APPROVED. comm mien
proot if EXPANSION JOINT EVERY 4m AND WHERE wa GLAZ «
(water as per detail) PAVING MEETS OTHER ELEMENTS branche Fade ons —_ war siorrep pet |
: Beow . a
STONE WALLS Stone sourced from ‘Smail mortared gaps, dose to be sourced from site GROUT JONTS UP MEMBRANE = £ e
Basement excavation ELfounded stones rom J meee prone mocrwous of —__abewnsccoremiz LanDGRAPHICS
basement excavation — sa 7 s ~ — SURROUND AND CAPPED TO
MEMBRANE COATING TO
. TOP FOR MAINTENACE ACCESS
TIMBER BOARDWALK & “Supa Deck spotted gum 140 | Finish dressed timber with | IRONBARK TIMBER —— ae ae TG MGATIONS oe oan. ° |} ——setzcr aencen 70 Lanpscare ancwireets
SEATS x 32 on hardwood bearers, ‘Nature's Timber Oil' from PRODUCTS +, QMRAETE KO ee PROVIDE GEOTEXTILE SURROUND -----|---} - + [Ij TCH BUD ie Rah et
joists and seat trames (to INTERGRAIN in ‘Natura to | Ph: 07 5445 2755 em erceeen owen S30 MORTAR BED WITHNO VOIDS, ALON TO DRAINAGE CELL & AGGREGATE . LL. LE 7 BROMIDE IMPORTED One area
future detail) manufacturers specification | INTERGRAIN CEMENT ADHESIVE, BRUSH UNDERSDE OF LAYER P= pe PROVIDE DRAINAGE CELL SESS
Ph: 1800 830 285 PAVER AND CONCRETE SLAB WITH AN PROVIDE TOPPING LAYER : = TO BOTTOM & SIDES,
APPROVED CEMENT SONDING AGENT. Tocer ‘AIN FALLS TO DRAINAGE = ——~" | ~ Steen, CUT TD FIT (Senn TOLERANCE) at Se eee
FEATURE BOLLARDS 4 x 100 x 100 Hardwood Finish dressed timber with IRONBARK TIMBER NOTE: Eraure pever sucaces ary maitained bee of conten, moti wx! cu tor / ‘| . jC ORAINAGE LINE TO. —
(min . F14) posts strapped "Nature's Timber Olf from PRODUCTS Sa Sas a Se gerom ct marmrntcnt emee PROVIDE AGGREGATE LAYER - 100 Rac cr ComEcT To sTOReNATER ‘SANDPIPER’
and dressed as detailed INTERGRAIN in ’Naturaf to. | Ph: 07 5445 2755 ‘Aaeipecancad end emcenthy Quran stl be uers'2 aah tnd sel ps TO TOP OF DRAINAGE CELL WITH 33 Hastings St, Noosa Heads
manufedurers specification | INTERGRAIN ‘eared open racataton, Sealers are be a Be apne Oe Pet GEOTEXTILE SURROUND .
pect ome
Ph: 1800 630 285 . os _ . wy
hi PAVER OVER SLAB TYPICAL DETAIL NTS PODIUMPLANT ERTYPICALDETAIL = NTS Karabin Pty Ltd Joint Venture
EAR FENCE Construction to future detal Feature fence to meet al tha
{timber and steel) Pool regulations including AS .
1926.1 - 2000 nee PROVIDE bo DXA SLOTTED Foster Designs Pty Ltd
POOL FENCE & GATES 12mm toughened glass Glass pool fence to meet al | FENCEPAC memeeiow SURROUND AND CAPPED TO ie
panels with 1200h flanged Pool regutations including AS | Ph: 1800 006 908 TOP FOR MAINTENACE ACCESS LANDSCAPE FOR
silver powdercoat posts 1926.1 - 2000 ‘is = PROVIDE TURF UNDERLAY OPERATIONAL WORKS
PROVIDE AGGREGATE LAYER dl Aaa 5 SAND 1 SOU MX Schedules, Spec & Details
ARTWORKS Selected steel and umber Stainless steel or Corten jocal artisan tba To Toe OF ORAINASE ceLwm ——-- ~ ~ PROVIDE RANA cer
ragure artworks ned GEOTEXTLE SURROUND. Se
wocated tobewal ee) and/or met ote "REN me 5] fe EOTENLE PARC COVER o or
PROVIDE TOPPING LAYER + Eee DRAINAGE UNE TO oe a
CREEK BED CCS ‘Lemon Cream pigment | Beach sand or simitar CCS (CONCRETE oe SOA MT Ames — — CONNECT TO STORMWATER ee
in grey cement for creek base | technique to be sprinkied and | COLOUR SYSTEMS) MEMBRANE OR BITUMEN COATING ORAINAGE SYSTEM
with stone excavated from Set into concrate base Nicole Long ome or 07
basement inlaid to creata Ph: 07 3287 6444 : meee
natural effect TURF OVER SLAB TYPICALDLTAIL NTS
eet omen. ee —
oro iz] Lace | a20Fe2 B
Page 20
= a SALE OF DOCUMENTS Superseded Planning Scheme Documentation Copy of Permit/Approval Letter The Noosa Plan Documentation APPLICATION FEES Material Changeof Use < CodeAnpact Gonsistent~ nsistet Inconsistent Assessment under Superseded Planning Scheme Modification to a Development Permit Extension of a Currency Period Operational Works - Landscaping e@ Bldg Work assessable against the Planning Scheme PRE LODGEMENT REVIEW Half Hour One Hour ADVERTISING Purchase Advertised Applications JETTIES Jetty Application Fee Jetty Bond BONDS Performance Bond SIGNS Registration Fee seAB FEE Search of Land Use Section file Liquor Licensing Request LAND USE SECTION FEES RECEIPT TYPE 520 110 111 (625— 521 521 521 521 521 521 521 522 522 523 524 51 (Category 4) 51 (Category 9) 222 112 113 TOTAL $ © /G25~ name: A J Sete pire ADDRESS: =/- PO Ben. F6 PEREGi AN) GEAcy 14573 FILENO: —§ ©7/2277 Ftlor RECEIPTNO: | QRS, Signature of TP Officer: PJ Area ea AUTHORITY NO: ~ oD (¢ (Peeqren (,
Used in these records
07/2277 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.