Council archive · source document
Recommendation - Noosa Iconic Panel - 010.2009.00001024.001 [As Published] · 132009.1024
Officer: Glen Conforti
Direct Telephone: (07) 5449 5379
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2009/1024
Your Reference:
5 November 2009
Kristian Baker
Project Manager
Noosa Iconic Panel
PO Box 15009
CITY EAST QLD 4002
Dear Madam
Recommendation - Noosa Iconic Panel
Iconic Queensland Places Act 2008
I refer to Application No. 2009/1024 as detailed below and wish to advise that Council completed an
assessment of the development application on 3 November 2009.
Council’s recommendation is set out below.
1 APPLICATION DETAILS
Application No: 2009/1024
Street address: 14 Ross Crescent, Sunshine Beach
Real property description: Lot 554 RP 48112
Planning Scheme: The Noosa Plan
2 COUNCIL’S DECISION DETAILS
The following type of approval is recommended:
Development Permit for Material Change of Use - Detached House
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the recommended conditions.
4 COUNCIL’S RECOMMENDED CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table and as
may be amended by these conditions.
Page 1 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
Plan No, Plan / Prepared By Date
Perspective – Chris Clout Design
C1.0 Ground Floor Plan - Chris Clout Design 26 June 2009
C2.0 Upper Floor Plan - Chris Clout Design 26 June 2009
C3.0 Elevations - Chris Clout Design 26 June 2009
C4.0 Elevations - Chris Clout Design 26 June 2009
Relevant Period
2. The Development Permit for a material change of use lapses if the use has not happened by
3 November 2013, unless an application to extend the currency is approved by Council.
Building Height
3. The building height shall not exceed 8.0 metres above the natural and finished ground levels
and 2 storeys in height.
4. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum allowable building height as required by either the conditions of approval or the
Planning Scheme.
Security Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $1,500 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Landscaping and Vegetation
6. The Pandanus tectorius tree located to the centre of the lot shall be relocated to a suitable
location within the front setback.
7. Existing trees on the site shall be retained, except where required to be removed due to
building operations or the conduct of the approved use. In this regard:-
7.1. the Pandanus tectorius located to the north side of the front boundary shall be
retained
7.2. all trees within the road reserve shall be retained
8. Screening vegetation with a minimum pot size of 200mm consisting of native, endemic
species with a mature height of not less than 3 metres shall be planted at a minimum of 2
metre centres to the southeast boundary and southwest boundary in accordance with
Council’s Landscaping Guidelines.
9. A minimum of 20% of the site shall be retained as soft landscaping.
10. All other vegetation shall be protected from interference resulting from clearing or
construction activities by:
10.1. Clearly marking vegetation to be retained with flagging tape;
10.2. Installing protective fencing around the drip line of the vegetation;
Page 2 of 12
Page 3
10.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does
not cause interference with vegetation; and
10.4. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
11. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:
11.1. Processing through a woodchipper or shredder. The resulting mulch is to be
stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high
with a minimum of 10 metres between edges of heaps.
11.2. Disposal for firewood.
11.3. Disposal for landscaping purposes.
11.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
11.5. The applicant is advised that burning off is an unacceptable method of disposal.
General
12. Buildings and structures (including swimming pools, sheds or outbuildings) shall not be
constructed under overhead electricity transmission lines, or within any easements.
13. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
14. External colours and finishes of the building shall comprise of muted/environmental tones
that blend with the natural environment.
Earthworks
15. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
Demolition or Relocation of Existing Dwelling
16. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be
protected from damage and made safe to the standard required by the regulatory authority.
17. All infrastructure must be disconnected, capped or sealed including:
17.1. electricity meters removed and electrical wires disconnected; and
17.2. telephone lines are disconnected; and
17.3. high speed data cables and television provider boxes are disconnected and
removed to the standard required by the regulatory authority
18. All building materials containing asbestos, including asbestos cement sheeting or roofing
and lagging, must be removed from the building and disposed of in accordance with industry
best practice.
19. Waste generated during construction must be stockpiled in a centralised location and
covered as required to prevent material being blown onto adjoining properties including the
road reserve or food waste from generating vermin. All site waste must be disposed of to an
approved waste disposal facility either directly or via an approved waste receptacle and
collection service. Storage areas are to be located near the temporary access to the site so
that access can be gained with out damage to infrastructure.
Page 3 of 12
Page 4
20. All building materials containing asbestos products must be disposed on in accordance with
industry best practice.
21. A temporary crossing must be provided to protect road reserve infrastructure including kerb
and channel.
22. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal
site, the relocation site or between the sites must be repaired or reinstated to at least pre-
existing conditions.
23. All disturbed areas must be revegetated or otherwise stabilised at the completion of the
works. Disturbed areas are revegetated using species identified in PSP3 – Landscaping
Plants and Guidelines.
24. The transportation of all materials to and from the site must be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying out materials either
to or from the site shall be covered to prevent materials, including dust, being windblown
from the vehicle.
25. A Waste Management Plan (demolition) shall be submitted for Building Works Approval. The
waste Management Plan (demolition) is required to be submitted in accordance with
Planning Scheme Policy 11- Waste Management Plans. The Plan shall contain the following
information:-
A waste management table as indicated below is to be completed showing how
waste material is to be segregated – recycled – reused or disposed.
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site *specify Off-site *specify *Specify
materials volume (m³) proposed reuse or contractor & contractor &
onsite recycling recycling outlet landfill site
methods
Excavation material
Green waste
Bricks
Concrete
Timber – please
specify
Plasterboard
Metals – please specify
Asbestos
Other – please specify
NOTE: Details of site area to be used for onsite separation, treatment and storage
(including weather protection) shall be provided on the plan drawings accompanying your
application.
Page 4 of 12
Page 5
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally, Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill with some items free.
Higher gate fees are charged for loads of mixed waste.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Unexploded Ordnance Concurrence Department of Ecoaccess Customer
Environment and Service Unit
Resource PO Box 15155
Management CITY EAST QLD 4002
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The plans and / or documents recommended for approval are listed in the following table:
Plan No. Plan / Prepared By Date
Perspective – Chris Clout Design
C1.0 Ground Floor Plan - Chris Clout Design 26 June 2009
C2.0 Upper Floor Plan - Chris Clout Design 26 June 2009
C3.0 Elevations - Chris Clout Design 26 June 2009
C4.0 Elevations - Chris Clout Design 26 June 2009
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. You are advised that the site is identified as a Koala Living Area under the Nature
Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 and
may contain koalas. The use of a Koala Spotter is encouraged in areas where koalas are
likely to occur, prior to the removal of Angophora, Corymbia, Eucalyptus, Lophostemon and
Melaleuca species. Further information can be obtained from the Environmental Protection
Agency at http://www.epa.qld.gov.au or phone (07) 3227 8185.
3. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing &
Drainage Act 2002 (as applicable).
Page 5 of 12
Page 6
4. For properties located in the catchment area for the Coastal Major Road Network
Infrastructure Charges Plan, a Building Works application may trigger an Infrastructure
Charge payable to Council in accordance with the Infrastructure Charges Plan and Chapter
5 of the Integrated Planning Act 1997
Aboriginal Cultural Heritage Act 2003
5. There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage
value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 OTHER DETAILS
A copy of all supporting and common material for the application, including Council’s planning
assessment report is available on PD Online at
http://rrif.noosa.qld.gov.au/masterviewpublic/modules/applicationmaster/default.aspx?page=wrapper
&key=013.2009.00001024.001
Page 6 of 12
Page 7
If you have any questions, please do not hesitate to contact me on 5449 5179.
Yours faithfully,
Denis Wallace
SENIOR DEVELOPMENT PLANNER
Page 7 of 12
Page 8
Referral Agency Conditions
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Page 8 of 12
[OCR of page images]
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
|Sunshi
ne Coast _ Referral Agency Conditions
tr |
Notice
Concurrence Agency Response
This nouce is iesued oy the Department of Enyiranitiont ane Resayrce Management pursudnt 10 Secuions 3.3.16 and
3.3.18 of the integrated Planing Act 1997 fo advise of a deision or scion,
Chief Executive Officer . CC: Chris Cloul Design
. Sunshine Coast Regional Council PO Box 135
Locked Bag 72 NOOSA HEADS QLD 4566
SUNSHINE COAST MAIL CENTRE QLD 4560 :
‘ Attention: Dani Petrie
Atlention: Glen Confarti
Your reference: 2009/1024
Applicant reference: Letter of 23/09/08 ,
Bur reference. 344002 1
Fila refersncas: BNES6717
Dear Sirftdadam
Re: Application (No. 2009/1024} for development approval - Material Change of Use
Lots 554 on RP748112 - 14 Ross Crescent, SUNSHINE BEAGH
ee
The Department of Environment and Resource Management (DERM), acting as a concurrence
agency under the Integrated Planning Act 1997 provides the altached respunse for lhe subject
development application.
Further information relevant to this applrcation is as follows:
Applicant: _ Chris Clout Design
Council Application Number: 2009/1024
Area Management Advice (UXO) Number: AMA 8012
Date application received by EPA: 24 Septamber 2008
Relevant Laws and Policles: - Environmental Protection Act 1994 (EP Act)
- Integrated Planenng Act 1997
Jurisdiction: Protaction of the environment by managing :
the contamination of fand under the EP Act
Page 1 of 5 - AFOSC129 : -
; Queensland ,
‘Department of Environmant and Resource Managanwent y :
vaww.derm.qhd.gov.au Asn 486ea 224 ait sf) Government .
Page 8 of 12
Page 9
Page 9 of 12 [OCR of page images] ecoaccess emirorumental freaces sased pmueitita Notice Concurrence Agency Response II would be appreciated if Council cauld provide a signed hard copy of the final Dacision Notice (lo include any DERM concurrence conditions} issued by Council for this application te: DERMs Cooaccess Customer Service Unit (Brisbane). PO Box 16155, CITY EAST QLD 4002. and an electranic copy 10 ece. gecess@xierm,. gid. gov. au. In addition, the State's Native Title Work Procedures indicale that responsibilily for assessment of native title issues fur an IDAS applleation rests with the Assessment Manager. Therefore, the EPA has not provided a notification regarding this application lo nalive tille parlios For any enquiries. the details of Ure relevant contest officer/s are included in the response, Yours si erely ra Land “| pfofzess Dale Ranald Scott Project Manager - UXO Delegate of the Administering Authority ’ . n Paga 20° S + AFORI109 Department of Environment and Resource Management Page 9 of 12
Page 10
Page 10 of 12
[OCR of page images]
ecoaccess
narrate! Aooazes and per
Notice
Concurrence Agency Response
Concurrence agency response
Sections 3.3.16 and 3.3.18 integrated Planning Act 1997
Development Gescription
o Reconfiguration of a Lot
3 Material Change of Use
where:
Oo the existing use of the land fs, or if the kand is vacant land with no existing use the most
recent use of the land was, for a notifi jable acilvily under the Fnvitonmental Protection
: Act 1994, ’
O .. the proposed use of the land is for vhitd care, educational, recreational, residential’ ‘or 7
similar purposes and the existing use of the land is, or if the land 1s vacant land vith no
- _ existing use the most recent use of the land was? for an industriat activity. 17
a the land is on the Environmental Management Register or Contaminatad Land Register
under tha Environmental Protection Act 7994.
Oo the land is vholly or partly within an area for which an Area Management Advice for
industrial activity or natural mineralisation has been issued and the propased use of the
jand ie for child cara, educational, recreational, residential or similar purposes.
the land is wholly or partly in an area for which an Area Management Advice for
unexploded ordnance has been issued.
The concurrence agency response Is that
The EPA is a concurrence agency for the applicaliun pursuant to the lollawing itam/s of the
inteyrated Planning Regulation 1998:
oO Nem 21(b), Table 2 of Schedule 2 of the integrated Planning Regulation 1999
8 Nem 12, Table 3 of Schedule 2 of the integrated Planning Regulation 7993
The application has been assessed and it has been decided that:
condilons must attach la any development approvat
any approval must be fer part only of the development
any approval must be a preliminary approval only
there are.o concurrence agency requirements
the application must be refused
_ coos
Reasons for inclusion of. development condi ions or refusal - , ,
Gia accordenne with sacton 3. Rr TB atthe fategratad Plank ng Act (997 atns section 278 of tire Acts frterprecition Act
1954, a concurrence response must include ceasons fora refuset ar for the inciusiog of develoumen! conditions.)
The site {the subject lot/s) is part ot an area of land within which the Department of Defence
(Defence) has assessed a ‘substantial risk of residual UXO contamination exists. Visit the Defence
website httpvAwww.detence.gov.au/uxo/ for delails.
Defence advises that development or land use rezoning proposals for land wilhin a ‘substantial’ zone
should only proceed following the conduct of UXO investigation and clearance activities. Defence
maintains g list of commercial UXO investigation and ramedial search contractors that it accredits to
carry out Ihis work.
Defence also recommends thal owners or occupiers of potentially affected land and workers and
contractors employed on ihe land need ta be aware of the procedure it a suspecl object is found.
Department of Enviraamem and Resource Management
Page 10 of 12
Page 11
Page 11 of 12 [OCR of page images] ecoaccess Ream Tanta! ACIS Boxt peomes Notice Concurrence Agency Response As DERM has no reeard ot ihe sile being further investigated or rernediated. itis cansidered Ihat there remains a possibility af UXO being found on it. However, DERM is also informed of the extent of developnrent lhat tias been carried out on the site, Recause there ts niu racarded evidence ot UXO being found on this site during its development to date or on adjoining sites that have been similarly developed, it is cunsidered thal the potential for residual UXO to exist on the site is only slight. Canditions of tha davelopment approval . The follawing concurrence agency conditions are (a be attached to any approval: 1 . Any person employed to work on any excavation, earthwarks or scil disturbance related to the subiect aa tl af the site is to be forewamed in writing by Ihe applicant, coy foe aya toe 2 the 2. This ariel is Ho explain ‘hat information available to DERM indicates a slight potential for - residual UXO axists on the site and work shoutd proceed with due caution. Itis to state the ~ procedure to be followed by any person finding an objec! suspected of being explosive — ordnance or component thereof: Do not disturh the abject. Take action, where apprapriate, fo provenl it being disturbed by another person, Note its approximate dimensions and gcneral appearance. Nolé (ha route to its facation. - Advise Ihe Polina as soon as possible. onnee 2 Tha applicant is to notify DERM of any UXO or explosive ordnance component found on Lhe site ag saon as possible after such an object is discovered, 3 At the compiction of any excavation, eanhwoarks or sail disturbance related to the subject development, a written sfaterhent, signed by the principal conlaclor, is to be provided by the applicant to DERM advising of any evidence of UXO or lack thercof and the extent of earthworks conductad. 4 Prior fo Coandifign 3 being satisfied, no excavaled gravel, rock, sand or soil is to be removed : from the site without watlen DERM approval. : : . ¢ . ° ° § The applicantis tc advise thé owner and.any occupier of the sile of the ebove responsibilities. : Additional comments or advice about the application. Applicants may visit DERM's website hitp:/www.derm.glid.gov.au/ or visit he Defence websile httouiwiyw.defence.gov.au/uxo! for the details of current UXO investigation and remedial search contraclors DERM accepts reporis based on investigative and remedial work carried aul by these contractors. Applicants may choose to discuss, with DERM, an altemative to cay pliance with he above conditions. Such alternative would involve the employmnt of a UXO contractor to complete an invesligation and any necessary remedial action and to subsequently submit an investigation’ remediation report to DERM as part of the aporoval process. This would de with the view of having DERM reassess the whole lot as being unaffected by UXO and for DERM to advise the appticant and Council accordingly. Such reassessment may be possible where the repart contains sufficient Page 4 of S « AFOBJIC9 . Department of Enviromvent and Kasource Management Page 11 of 12
Page 12
Page 12 of 12
[OCR of page images]
. ecoaccess
arvvermantay iepance and permis
Notice
Concurrence Agency Response
evidence for Defence's assessmeni, in regard to Ihe, particular lot, to be refuted, ar for the lat to
othynvise be considered remediated. Where there is insufficient evidence, such reassessment would
be unlikely,
Also, where the use of detection equipment by the UXO contractor, as part of the investigation. is
roade Impractical due to existing slructuras or metal waste in tne ground, the UXO contractor may be
limited to a visual inspection during excavation, etc, or lo screyning the gravel, rock, sand or soil as it
is excavated. Under thease circumstances. whilsi a greater cerlainty may be attached lo Kdentifying
any possible UXO, fram a salety perspective. the risk would be reduced not much more than it would
through complianes with the above conditions.
Additional information for applicants *
This concurrence response pursuant to the Environmental Protection Act 1994 applies only to”
contaminated land iss: ues and does not re move the need: to obtgin any further anproval for, this
development which may be required by this or othar legislation, Stale and/or Commonwealth.
Applicants are advised te check with all relevant statutory authorlies for such requiremants.
Enquiries:
Ranaki Scoll. Project Manager (UXO) — Ouparlincnt of Environment and Resource Management
Ph: (07) 5459 6129 Fax: {07} 54439927 email:contamland [email protected]
~ End of Concurrence Agency Response ~
Page Sof § - AFaah1o9 Department of Environment and Resource Management
Page 12 of 12
Used in these records
Recommendation - Noosa Iconic Panel - 010.2009.00001024.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 119 KB (small file)
- File type
No other editions are linked here.