20.   All building materials containing asbestos products must be disposed on in accordance with
      industry best practice.
21.   A temporary crossing must be provided to protect road reserve infrastructure including kerb
      and channel.
22.   Any damage to footpaths, street plantings, kerb and channel or roadways at the removal
      site, the relocation site or between the sites must be repaired or reinstated to at least pre-
      existing conditions.
23.   All disturbed areas must be revegetated or otherwise stabilised at the completion of the
      works. Disturbed areas are revegetated using species identified in PSP3 – Landscaping
      Plants and Guidelines.
24.   The transportation of all materials to and from the site must be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying out materials either
      to or from the site shall be covered to prevent materials, including dust, being windblown
      from the vehicle.
25.   A Waste Management Plan (demolition) shall be submitted for Building Works Approval. The
      waste Management Plan (demolition) is required to be submitted in accordance with
      Planning Scheme Policy 11- Waste Management Plans. The Plan shall contain the following
      information:-

               A waste management table as indicated below is to be completed showing how
                waste material is to be segregated – recycled – reused or disposed.
           MATERIALS ON-SITE                       DESTINATION

                                                   Re-use and Recycling          Disposal

           Expected waste            Estimated     On-site *specify       Off-site *specify   *Specify
           materials                 volume (m³)   proposed reuse or      contractor &        contractor &
                                                   onsite recycling       recycling outlet    landfill site
                                                   methods



           Excavation material

           Green waste

           Bricks

           Concrete
           Timber – please
           specify
           Plasterboard

           Metals – please specify

           Asbestos

           Other – please specify


          NOTE: Details of site area to be used for onsite separation, treatment and storage
          (including weather protection) shall be provided on the plan drawings accompanying your
          application.




                                                                                         Page 4 of 12

Used in these records

About this file

File size
119 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Recommendation - Noosa Iconic Panel - 010.2009.00001024.001 [As Published].pdf · 119 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.