Request for Further Information - 010.2008.00001927.001 [As Published] · 132008.1927
-2-
b. the location proposed for relocation of the rapid infiltration pit provides suitable area
to construct the required bunds as detailed on the typical allotment bund sections on
drawing C1636/04/RSL/R8 Rev B by TATE Professional Engineers approved by
Council on 24 August 2005; and
c. all construction works required to relocate the rapid infiltration pit can occur wholly
within Lot 23 on SP188268.
3. Roof water runoff/rainwater tank overflows must be directed to the rapid infiltration pit located
at the southwest corner of the property. To demonstrate compliance with this requirement,
please provide a preliminary stormwater drainage design including finished surface levels
across the site.
Access Driveway
4. Council officers are concerned that the grade of the driveway may inhibit the overland flow
path provided along the property frontage. In this respect please provide a longitudinal section
that demonstrates the grade of the driveway is compliant with condition 110 of the Negotiated
Decision Notice issued by Council on 12 August 2004 for a Material Change of Use and
Reconfiguration of a Lot with approval number 23116 DA.
Under the provisions of the Integrated Planning Act 1997, you have three options available in
response to this Information Request. You may give the assessment manager (in this instance
Council) and each referral agency (if any):
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment manager and
each referral agency to proceed with the assessment of the application; or
3. a letter:
(i) stating that you do not intend to supply any of the information requested; and
(ii) asking the assessment manager and each referral agency to proceed with the
assessment of the application.
Please be aware that under Section 3.2.12 of the Integrated Planning Act 1997, the applicant is to
respond to any information request within 12 months of the request or otherwise, the application
lapses.
A response to the above is required to be submitted, prior to further assessment of the application. If
any further matters arise as part of assessment of this application, you will be advised accordingly.
Council prefers that all the information requested be submitted as one package. A preliminary
assessment only of the application has been undertaken and during the formal decision stage, or as
a result of public exhibition, other matters may arise. You are requested to advise your client directly
regarding this request.
Information on the status of development applications may be viewed using PD Online, which is
accessible via the Sunshine Coast Regional Council website www.sunshinecoast.qld.gov.au . Using
the "Quick Links" on the left hand side of the screen, users may select "PD Online" by clicking on it,
which will take users to the Planning and PD Online page. At this point, a disclaimer will show; users
may click on "agree" if they agree and can enter either the development application number, or the
address of the property to start viewing information on it on the application.
Should you have any further queries in relation to the above, please do not hesitate to contact me on
the above number.
Yours faithfully,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2008.00001927.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 14 KB (small file)
- File type
No other editions are linked here.