Reference #S7186


Geotechnical Stability Review

Site Details: –
Lot 10 (MCH 5387)
Tropicana Rise
Castaways Beach QLD 4567

For: S & S Yeardley




                              Incorporating:




Scott Brimelow
BEng (Civil), CPEng, MIEAust, RPEQ (4942)
Full text of the other 30 pages

Page 2

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




                                                           TABLE OF CONTENTS

LIST OF TABLES & FIGURES ...................................................................................................... II
1.0      INTRODUCTION .............................................................................................................1
   1.1           Preamble............................................................................................................................................... 1
   1.2           Scope of Investigation ........................................................................................................................ 1
   1.3           Objective ............................................................................................................................................... 1
2.0      ASSESSMENT METHODOLOGY ....................................................................................2
   2.1           Methodology ........................................................................................................................................ 2
   2.2           Referenced Documentation Specific to Lot 10 ................................................................................. 2
   2.3           Review Procedures ............................................................................................................................... 2
3.0      ASSESSMENT RESULTS ....................................................................................................3
   3.1           Desktop Study...................................................................................................................................... 3
         3.1.1      The Proposed Development ........................................................................................................... 3
         3.1.2      Historical Landslide Data ................................................................................................................ 3
         3.1.3      Use and Limitations of Zoning ...................................................................................................... 3
         3.1.4      Regional Geology ............................................................................................................................ 3
         3.1.5      Engineering Characteristics of Geological Units........................................................................... 3
   3.2           Site Assessment.................................................................................................................................... 4
         3.2.1      Land Description ............................................................................................................................. 4
         3.2.2      Adjacent Construction .................................................................................................................... 4
         3.2.3      Vegetation ........................................................................................................................................ 4
         3.2.4      Crossfall ............................................................................................................................................ 4
         3.2.5      Drainage ........................................................................................................................................... 4
         3.2.6      Soil Investigation ............................................................................................................................. 4
         3.2.7      Groundwater .................................................................................................................................... 4
         3.2.8      Wind Category ................................................................................................................................. 4
         3.2.9      Engineering Parameters .................................................................................................................. 5
4.0      LANDSLIDE CHARACTERISATION ................................................................................6
   4.1           Definition of Landslide ....................................................................................................................... 6
   4.2           Causes of Landslides ........................................................................................................................... 6
   4.3           Classification of Landslides ................................................................................................................ 6
5.0      STABILITY RISK ASSESSMENT & MITIGATION ................................................................8
   5.1           Terminology ......................................................................................................................................... 8
   5.2           Visual Observations ............................................................................................................................. 8
   5.3           Subsurface Observations ..................................................................................................................... 8
   5.4           Hazard Identification .......................................................................................................................... 8
6.0      CONSTRUCTION RECOMMENDATIONS .................................................................. 10
   6.1           Good Engineering Practice ............................................................................................................... 10



GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]                                               I|Page

Page 3

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013



   6.2            Site Clearing ....................................................................................................................................... 10
   6.3            Earthworks ......................................................................................................................................... 10
          6.3.1       General Earthworks ....................................................................................................................... 10
          6.3.2       Filling outside the Residential Footprint & Driveway Areas ...................................................... 10
          6.3.3       Retention........................................................................................................................................ 11
          6.3.4       Approved Fill.................................................................................................................................. 11
          6.3.5       Compaction .................................................................................................................................... 11
   6.4            Drainage ............................................................................................................................................. 11
   6.5            Access & Driveways ........................................................................................................................... 12
   6.6            Retaining Walls .................................................................................................................................. 12
   6.7            Foundations ....................................................................................................................................... 12
   6.8            Septic & Sullage Disposal ................................................................................................................. 12
   6.9            Erosion Control & Landscaping ....................................................................................................... 13
   6.10           Construction Recommendations ...................................................................................................... 13
   6.11           Surface Movement and classification .............................................................................................. 13
   6.12           Factor of Safety ................................................................................................................................. 13
   6.13           Plumbing ............................................................................................................................................ 13
   6.14           Site Maintenance ............................................................................................................................... 14
   6.15           Consideration to Tree Planting ........................................................................................................ 14
7.0       CONCLUSIONS ........................................................................................................... 14
   7.1            Recommendations ............................................................................................................................. 14
   7.2            Slope Stability Risk ............................................................................................................................ 14
   7.3            Limitations ......................................................................................................................................... 15
   7.4            Cracking of Footings ......................................................................................................................... 15
8.0       REFERENCES................................................................................................................ 16
PLATE 1 – SITE PLAN ............................................................................................................................................ 17
SITE PHOTGRAPHS ................................................................................................................................................ 18
APPENDIX A – Sub-Soil Profiles ........................................................................................................................... 20
APPENDIX B – Extract from The Noosa Plan ...................................................................................................... 21
APPENDIX C – Extracts from “Practice Notes & Guidelines for Landslide Risk Management” ...................... 22


                                                      LIST OF TABLES & FIGURES
Table 1 Bearing Capacities at BH1 (CSI Report) .................................................................................................... 5
Table 2 Bearing Capacities at BH2 ......................................................................................................................... 5
Table 3 Landslide Classification .............................................................................................................................. 7
Table 4 Risk Assessment Matrix .............................................................................................................................. 9
Table 5 Final Risk Assessment Matrix .................................................................................................................. 15

Figure 1 Major types of Landslide Movement ....................................................................................................... 7




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]                                             II | P a g e

Page 4

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 1.0       INTRODUCTION

 1.1       Preamble

Under the instructions of S & S Yeardley, GeoConsulting have undertaken a geotechnical stability review
for Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567.

The State Planning Policy Mitigating the Adverse Impacts of Flood, Bushfire and Landslide (SPP 1/03)
refers to a natural landslide hazard management area as: -

     a) An area identified by a local government in its planning scheme consistent with the conclusions of
        a landslide hazard assessment prepared in accordance with this Policy; or
     b) Where such a study has not been undertaken, an area identified by a local government in its
        planning scheme and including all land of 15% and greater slope and other land known or
        suspected by the local government as being geologically unstable, together with other areas that
        the local government considers may be adversely affected by a landslide; or
     c) Where an area has not been identified by a local government, all land with a slope of 15% or
          greater.


 1.2       Scope of Investigation

The purposes of this investigation where to: -
           Identify sub-soil types.
           Establish soil parameters.
           Comment upon site features likely to affect construction over the proposed residential area.
           Comment upon the geotechnical aspects of the allotment in regards to slope instability and in
               accordance with the objectives presented in Sunshine Coast Regional Council, Slope and
               Geological Stability Policy.
           Make recommendations for building construction on the allotment that will maintain or
               enhance the relative slope stability.


 1.3       Objective

The specific objective of SPP 1/03 is to ensure that the development maintains the safety of people,
property and hazardous materials manufactured or stored in bulk from the risk of landslide.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   1|Page

Page 5

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 2.0       ASSESSMENT METHODOLOGY

 2.1       Methodology

This assessment comprised of the following stages: -


     a) Desktop Study
           Review of available relevant planning documentation including layout, topographic plans and
            flood data (if applicable).
           Review of historical landslide documentation (if available).
           Collation of regional soil and geological data.
           Review of existing geotechnical reports (if applicable).
     b) Site Assessment
           Conduct a site walkover and confirm visual and/or anecdotal evidence of landslip hazards.
           Advance dynamic cone penetrometers (DCP) tests at representative locations and as
               appropriate.
           Confirm findings of desktop study.
     c) Analysis of Data and Stability Risk Assessment
           Assignment of a qualitative measure of likelihood; consequence to property; level of risk to life
               and property; and risk implications.
           Determine recommendations and construction guidelines.
           Calculate a factor of safety against landslip.


 2.2       Referenced Documentation Specific to Lot 10

Existing documents referenced in this review include: -
           Department of Mines and Energy, Queensland 1999, Nambour, Australia 1:100 000 Geological
            Special, Sheet 9444, Part 9544, Department of Mines and Energy, Queensland, Brisbane.
           Sunshine Coast Regional Council (SCRC), The Noosa Plan – Eastern Beaches Natural Hazard:
               Landslide and Flooding Overlay, (Map OM4.3).
           Architectural plans, Issue pBA by Aboda.
           CSI: Soil Testing, Site Investigation and Classification Report, #8453, June 2013.


 2.3       Review Procedures

Review procedures were in accordance with the following: -
           AS 1289           -         Methods of Testing of Soils for Engineering Purposes
           AS 1726           -         Geotechnical Site Investigations
           AS 2870           -         Residential Slabs and Footings - Construction
           AS 3798           -         Guidelines on Earthworks for Commercial and Residential Development
           AS 4055           –         Wind Loads for Housing

GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   2|Page

Page 6

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 3.0       ASSESSMENT RESULTS

 3.1       Desktop Study

        3.1.1       The Proposed Development
It is proposed to construct a highset two storey residence with the following construction parameters:
      Metal sheet roof
      Floors between levels to be a mixture of suspended timber and slab on ground concrete
      Lightweight external wall cladding and reinforced block walls
    Suspended floors supported on timber and/or steel posts
The residence has been designed to step down the slope to minimise earthworks.

        3.1.2  Historical Landslide Data
A search of The Noosa Plan (SCRC 2000) indicates the allotment is located in an area of “known” landslip
hazard, as presented in APPENDIX B.

        3.1.3       Use and Limitations of Zoning
Landslide risk zonings at district scale should be considered only the first step and not the final tool in
decision making for landslip-prone areas. It must be thoroughly understood that the zones established do
not include only land of the same stability, as it is impossible at this scale to show all individual unstable
or suspect areas specifically. Instead, the zones depict land where a similar range of stability conditions is
present. As the boundaries between zones are generally approximate and in places gradational, it should
not be implied that they can signify that land on one side is stable and the other unstable. In such
boundary situations, general caution and further study on the ground is the appropriate course of action.

        3.1.4       Regional Geology
Geological records (Dept. of Mines and Energy 1999) indicate the site to be upon Quaternary Dunes
(mainly parabolic) that consist of quartz sand. The major dune systems evident today are resultant from
wind action. The dune systems extend westward and historically as sea levels rose the coastline moved
westward as sands were initially deposited by wave action. As sea levels declined wind action blew the
sands in a westward direction. Typically a sandy beach in its accreted state consists of a “beach berm”, a
well grassed/vegetated “incipient dune”, a high “frontal dune” and “hind dunes”. All these topographic
and geomorphic features can be seen in the surrounding areas.

        3.1.5       Engineering Characteristics of Geological Units
The behaviour of dune sands is almost wholly frictional with little if any cohesive effect. Particle grading,
size, angularity and insitu density all influence the load carrying capacity or sand strengths. Moisture
content is an important factor, especially during construction, as sands dry out any escarpment or flank
will tend to fail by slumping back to the “angle of repose”, which approximates 1:5 (V:H) or 20% or 11.5°.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   3|Page

Page 7

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 3.2       Site Assessment

        3.2.1       Land Description
                            2
The allotment is 937m in area with the proposed building area located to the front allotment sectors. The
allotment is regionally located on and over the crown of the near westerly dune system. David Low Way is
located beyond the allotment rear.

        3.2.2       Adjacent Construction
Two storey block slab on ground residence.

        3.2.3       Vegetation
Moderate dune scrub and banksia trees exist over the allotment.

        3.2.4       Crossfall
Refer to the site survey plan by Survtech. There is a crown to the allotment frontage (proposed building
area), with a slight fall to the road frontage. Beyond the crown, the crossfall increases to 1:3 (V:H) to the
rear (east) with contours generally planar.

        3.2.5       Drainage
Drainage over the building area is very good and is towards the east. There is a sewer manhole and house
connection in the rear eastern corner.

        3.2.6       Soil Investigation
Sub-soil investigation was completed by CSI: Soil Testing, consisting of two boreholes and associated DCP
tests.

The boreholes encountered a homogeneous soil profile that consisted of fine dune sands.

        3.2.7       Groundwater
Groundwater was not encountered in any of the boreholes.

        3.2.8       Wind Category
In accordance with AS 4055, the wind category has been assessed as N4 (TC2, T2, PS).




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   4|Page

Page 8

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




         3.2.9      Engineering Parameters
The calculated bearing capacity with respect to depth at each of the test locations are presented in the
tables below.
                           Table 1 Bearing Capacities at BH1 (CSI Report)

                                                                                                             Bearing
    Depth
                                             ′                                        ′                      Capacity
     (m)
                                                                                                              (kPa)
      1.0                 2                17.0               1.60                  25°              3.2       30
      1.5                 4                25.5               1.46                  33°              4.0       40
      2.0                 9                34.0               1.36                  36°             12.2       125
      2.5                14                42.5               1.29                  42°             18.1       220
      3.0                17                51.0               1.23                  43°             15.8       200



                                            Table 2 Bearing Capacities at BH2

                                                                                                             Bearing
    Depth
                                             ′                                        ′                      Capacity
     (m)
                                                                                                              (kPa)
      1.0                 1                17.0               1.60                  25°              1.6       20
      1.5                 3                25.5               1.46                  33°              4.4       50
      2.0                 8                34.0               1.36                  36°             10.9       120
      2.5                15                42.5               1.29                  42°             19.4       225
      3.0                23                51.0               1.23                  43°             28.3       350


Notes:
      N            = Standard Penetration Resistance
      σ′           = Shear stress of the soil (Note:            17       ⁄     )
      C            = Correction factor
      ϕ′           = Shear strength parameter
      N            = Corrected Penetration Resistance
      Allowable bearing capacity has been calculated using N and a typical footing width of 0.5 metres.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]    5|Page

Page 9

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 4.0       LANDSLIDE CHARACTERISATION

 4.1       Definition of Landslide

The term landslide is defined as the movement of rock, debris or earth down a slope. The phenomena
described as landslides are not limited to either “land” or to “sliding” and usage of the work has implied a
much more extensive meaning than its component parts suggest.


 4.2       Causes of Landslides

Landslides occur when the inherent strength of the soil or weathered rock is no longer sufficient to resist
the forces of gravity acting on the materials. Compared with mountainous areas in other parts of the
world, the ranges in Southeast Queensland are relatively subdued and mature. In such areas, slopes reach
a balance between the progressive weathering of the rocks and the removal of the weathered debris by
water erosion, landslides then occur only rarely and usually only on the steepest scarps. Such a balance
exists even in geologically sensitive situations such as basalts regions, although it may be relatively more
delicate. Landslides activity has increased in many areas of Southeast Queensland within the last century
because clearing of forests have disrupted the delicate balance in geologically sensitive situations.

Landslides can be mobilised by both natural causes or by human activity. Natural causes may include:-
           Saturation of slope material from rainfall or seepage
           Undercutting of scarps and banks by erosion
           Gradual weathering and subsequent decrease in the internal strength properties of materials
           Vibrations caused by earthquakes
Human activity may include: -
           Slope modification by earthwork activities (cutting and/or filling)
           Disruption to natural drainage characteristics
           Leaking pipes, pools, dams and tanks
           Inappropriate stormwater discharge
        Removal of vegetation
In general, high intensity rainfall events combined with some form of human activity is by far the most
common trigger of landslides in Australia.


 4.3       Classification of Landslides

Landslide classification is based on the Varnes (1978) system which has two terms. The first term describes
the material type and the second term describes the type of movement. Table 3 shows how the two terms
are combined to give the landslide type. Figure 1 gives schematics to illustrate the major types of
landslide movement.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   6|Page

Page 10

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




                                              Table 3 Landslide Classification

                                                                       Type of Materials
                                                                                Engineering Soils
  Type of Movement
                                              Bedrock                   Predominantly     Predominantly
                                                                           Coarse               Fine
               Falls                           Rock Fall                      Debris Fall                     Earth Fall
             Topples                         Rock Topple                    Debris Topped                    Earth Topple
                       Rotational
    Slides                                     Rock Slide                    Debris Slide                    Earth Slide
                    Translational
                                              Rock Flow                      Debris Flow                     Earth Flow
              Flows
                                             (Deep creep)                    (Soil Creep)                    (Soil Creep)
                       Complex (Combination of two or more principle types of movement)




                                     Figure 1 Major types of Landslide Movement




                                                     (Source: AGS (2007c))




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]          7|Page

Page 11

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 5.0       STABILITY RISK ASSESSMENT & MITIGATION

 5.1       Terminology

The terminology of the Practice Note Guidelines for Landslide Risk Management (AGS (2007c)) has been
used in the descriptions of hazards and the qualitative assessment of likelihood, consequence and risk of
slope instability. Extracts of the Practice Note Guidelines for Landslide Risk Management (AGS (2007c))
that details terminology and associated risk matrix tables have been attached as APPENDIX C.


 5.2       Visual Observations

With reference to the site features and geology described in the above sections, there were no obvious
signs of slope instability observed during our site inspection and the base geology of Quaternary Dunes is
not generally considered to be highly prone to instability.


 5.3       Subsurface Observations

Inspection of the site indicates consistent subsurface soil profiles that typically reflect this topographic
region.


 5.4       Hazard Identification

The following hazards were identified on this allotment: -

          1. Hillside slope failure - failure of the natural hillside slopes is most likely to result in shallow
             slumping of the near surface soils during or following heavy and prolonged rainfall periods or
             undercutting of the upslope by excavation or slope failure downslope on adjoining allotments.

          2. Cut and fill batter failure - failure of any cut and fill batters are considered likely where
             batters are not supported by retaining walls, during the construction phase and also upon
             completion.

Qualitative assessment of the potential hazards and stability risk in accordance with the methods
suggested in the AGS Guidelines has been summarised in Table 4 below, together with a qualitative
assessment of likelihood, consequence and risk to the proposed development in its present condition.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   8|Page

Page 12

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




                                              Table 4 Risk Assessment Matrix

           Hazard                          Likelihood                    Consequence                           Risk
1. Hillside slope failure: -
        Lower than dwelling                  Possible                        Minor                           Medium
            At dwelling site                 Unlikely                        Minor                             Low
         Above dwelling site                  Rare                           Minor                           Very Low
2. Unsupported batters: -
                             Cut              Likely                         Minor                           Moderate
                             Fill             Likely                         Minor                           Moderate


The development should generally include works which result in acceptable risk levels to property after
completion of construction. In some cases, subject to appropriate monitoring and maintenance programs,
a tolerable risk may be accepted.

The Practice Note Guidelines for Landslide Risk Management (AGS (2007c)) indicate that the regulator (i.e.
Council) is the appropriate authority to set standards for risk levels but also suggests that, for most
development in existing urban areas, criteria based on Tolerable Risk levels are applicable because of the
trade-off between the risks, the benefit of development and the cost of risk mitigation. Definitions of
acceptable and tolerable risk as included in the Practice Note Guidelines for Landslide Risk Management
(AGS (2007c)) are as follows: -

          Tolerable Risk – Risks within a range that society can live with so as to secure certain benefits. It
          is a range of risk regarded as non-negligible and needing to be kept under review and reduced
          further if practicable.

Areas initially of moderate or high risk level to property may be accepted for development subject to
detailed investigation to define hazards, provided that planning and treatment options are implemented to
reduce risks to acceptable levels.

          Acceptable Risk – Risks which everyone affected is prepared to accept. Action to further reduce
          such risk is usually not required unless reasonably practicable measures are available at low cost in
          terms of money, time and effort.

Low to moderate risk levels are usually considered acceptable to regulators provided that the development
of the site be carried out in accordance with good engineering practice for hillside developments and with
the subsequent Section 6 of this report.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]            9|Page

Page 13

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 6.0       CONSTRUCTION RECOMMENDATIONS

 6.1       Good Engineering Practice

Attached as APPENDIX C, are extracts from Practice Notes & Guidelines for Landslide Risk Management,
(AGC (2007c)), including: -
           “Some Guidelines for Hillside Construction”
           “Examples of Good Hillside Practice”
Recommendations and guidelines have been related to this allotment below.


 6.2       Site Clearing

Only clear the site where required for construction of the proposed residence, and retain as much of the
natural vegetation as possible. Exposed soils will be subject to runoff scour; hence ground cover
protection is required and tree / shrub species should be established downslope of the residential envelope.
It is envisaged the direct building surrounds will be landscaped. During the construction phase, silt fences
should be in place to control and retain runoff. Species should conform to the Foundation Maintenance
and Footing Performance: A Homeowner’s Guide, (CSIRO 2003), a copy of which is attached as APPENDIX
D.


 6.3       Earthworks

        6.3.1       General Earthworks
The proposed building area is to be stripped of all organic material and/or material that will inhibit
construction. Excessive earthworks proposed on this site may require an “Operational Works” permit,
which must be obtained from the Local Authority.

Some minor to moderate earthworks (approximately 1.0m cut and 1.0m fill) will be required in order to
create a series of level building platforms which step down the slope, as specified on the architectural
plans). The following details should be considered: -
           It is preferred that earthworks are prepared in accordance with the guidelines of AS3798.
           A positive drainage gradient is to be maintained over the building areas.
           Spoon drains to be installed at the toe of cut embankments
           Fill batters should grade at not less than 1:2½ (V:H).
           Cut batters that are not retained should grade at not less than 1:2 (V:H).
           Exposed surfaces should be vegetated to reduce the opportunity for runoff scour

        6.3.2       Filling outside the Residential Footprint & Driveway Areas
Placement of fill on the steep flanks is not recommended and other fill areas should preferably be retained.
Site preparation of filled areas will include stripping of topsoil and closely benching the exposed slope
prior to placement of fill in accordance with AS 3798. Fill areas should be prepared to support minimum


GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   10 | P a g e

Page 14

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




loads of at least 75kPa. For minor fill areas (less than 1.0 metres), the batters should be prepared to a
maximum grade of 1:2 (V:H) and vegetated immediately to reduce the opportunity for scour.

        6.3.3       Retention
All cut embankments exceeding 1.0 metre in height should be retained and engineer designed. Rigid or
flexible retention methods can be employed. Unretained cut embankments should not grade at less than
1:2 (V:H).

        6.3.4       Approved Fill
Where onsite or imported material is used as structural fill, it must comply with material requirements of
AS 3798 - 2007 “Guidelines on Earthworks for Commercial and Residential Developments”.


Unsuitable material must be removed beneath building and pavement areas. Unsuitable material include
organic soils, uncontrolled fills and building rubble (i.e. bricks, concrete, steel, household waste).

        6.3.5       Compaction
The in situ fine grained SAND must be compacted to achieve a minimum dry density ratio of 92% MMDD
while imported approved fill must be compacted to a dry density ratio of 95% MMDD in accordance with
AS1289.5.2.1. Compaction testing must be done using a nuclear density gauge in accordance with
AS1289.5.8.1.

Fill must be placed in horizontal layers not greater than 300 mm loose thickness. Each layer must be
compacted by suitable compaction equipment and carefully controlled to ensure even compaction over the
full area and depth of each layer.

Care will need to be taken while compacting in the vicinity of existing structures and retaining walls. This
is particularly important if vibratory compaction is being carried out. Tynan (1973) provides assistance
with the selection of compaction equipment for use adjacent to structures.


 6.4       Drainage

Drainage over the building area and near surrounds is very good, and is towards the east. Water is not to
pond in or around footings during or after construction. Further, the proposed floor level is not to be less
than 225mm above the finished ground level, or as required by the relevant Local Authority.

Stormwater will be required be contained over Lot 10. Stormwater drainage design should result in a non-
worsening discharge to surrounding allotments. Reference should be made to the Domestic Rainwater
Harvesting in Queensland (BSA 2011) and the Rainwater Tank Design and Installation Handbook
(MPMSAA 2008) documents.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   11 | P a g e

Page 15

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 6.5       Access & Driveways

Driveways and areas for car turning are also to be provided in accordance with the Local Authority’s
requirements. Earthworks undertaken on sites to provide these areas are as important as the earthworks
required to create the building area.


 6.6       Retaining Walls

All retaining walls over 1.0 metre in height, whether stand-alone or forming part of the proposed
residence, are to be engineer designed in accordance with AS4678‐2002 “Earth‐Retaining Structures”.
Drainage should also form part of the wall design, to remove surface and sub-surface water from behind
the wall.

For the design of retaining structures, the following parameters are considered appropriate: -
           Angle of internal friction, φ = 36°
           Coefficient of active earth pressure Ka = 0.26
           Coefficient of passive earth pressure Kp = 3.85
           At rest coefficient of earth pressure Ko = 0.41
           Bulk density: 17 kN/m
                                          3




It is proposed to construct a series of block retaining walls to the low side of the garage (and parts of the
residence) and backfill to create level building platforms. Any cut batters under the residence for future
storage areas or structures should be retained and engineer designed.

It is important to note that some ground movement is to be expected behind any soil retaining system,
including gravity retaining walls.


 6.7       Foundations

All founding should be to homogeneous soil types, and based on the sub-soil profile, load bearing
elements are required to bear a minimum 2.5 to 3.0m below current ground levels, into the underlying
medium dense/dense SAND. The use of steel screw-in piers to achieve these depths is recommended and
is commonplace for building on these sites. Foundations are to be augmented by structural design.


 6.8       Septic & Sullage Disposal

All effluent and sullage discharge should be in accordance with the relevant local authority. A reticulated
sewerage system exists for effluent disposal. All connections in this system are to be in strict accordance
with the Local Authority’s specifications.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   12 | P a g e

Page 16

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 6.9       Erosion Control & Landscaping

Prior to construction, an erosion and sediment control plan should be established. This document can be
referenced to the publication, Soil Erosion and Sediment Control (EA 1996).


 6.10      Construction Recommendations

The proposed two storey residence (consisting of concrete slab on ground and suspended timber floors on
steel posts and lightweight cladding) is considered suitable for this allotment.


 6.11      Surface Movement and classification

In accordance with AS2870-2011 – Residential Footings and Slabs, the site must be classified “P” – soft
soils.


 6.12      Factor of Safety

                                                                     th
In accordance with the Maroochy Plan 2000 (dated 8 August 2011), modelling of the slope on Lot 10
against landslip has taken place with respect to current site conditions and the proposed residential
construction. Parameters include: -
           Cohesion of the soils
           Topographic grades
           The revealed soil profile and the depth to rock
           Density of the revealed soils
           Angle of internal friction
           Seepage and groundwater.

This modelling concludes a factor of safety against landslip to range between 1.8 and 2.2. We conclude the
proposed development of Lot 10 as referenced is sustainable, with a factor of safety against landslip to be
greater than 1.5.


 6.13      Plumbing

Penetrations of the footing beams shall be avoided, but where necessary shall be sleeved to allow for
movement. Closed-cell polyethylene lagging a minimum of 20mm thick shall be used around all
stormwater and sewer pipe penetrations through external footings. Further, connections of stormwater
and waste drains shall include flexible connections.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   13 | P a g e

Page 17

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 6.14      Site Maintenance

Long-term stability of the house foundations is the responsibility of the owner/occupier of the dwelling.
Large changes in moisture conditions around the structure's footings (inconsistent watering patterns), will
cause movement, and may lead to damage of the house. Further, trees are to be planted away from the
structure area in order not to adversely affect the foundation performance. You are advised to read the
report, Foundation Maintenance and Footing Performance: A Homeowner’s Guide, (CSIRO 2003), a copy
which can be downloaded from http://www.publish.csiro.au/nid/22/pid/3612.htm.


 6.15      Consideration to Tree Planting

A zone of drying influence is associated with single trees or groups of trees under consideration. The site
classification and foundation design for this project has been based on the assumption that the design will
NOT be subject to any zone of drying influence produced by trees. AS2870-2011 Appendix H
(informative) may be referenced as a guide for determining the influence distance of trees. Based on this
appendix, single trees are to be planted a minimum distance of 1.0 times HT (mature height or an estimate
of the height it will attain within the design life of the building) away from the structure. A group of trees
are to be planted a minimum distance of 1.5 times HTg (0.9 times the design height of the tallest tree)
away from the structure. For a group of four or more trees in a row the trees are to be planted a
minimum distance of 2.0 times HTg away from the structure.




 7.0       CONCLUSIONS

 7.1       Recommendations

Notwithstanding the following conclusions, it is recommended: -
           Unretained fill areas are structurally undesirable.
           Massive retaining wall structures are structurally undesirable.
           Lightweight flexible structures that step down the slope are preferred. The proposed house is
               suitable for this allotment.
           Minimise cut/fill earthworks. Retaining walls should be designed for both instances for the
               proposed residence.
           All footings are to bear to the underlying medium dense SAND.
           Install and maintain drainage systems to divert water away from the proposed residence.


 7.2       Slope Stability Risk

It has been concluded that this geological region has a low risk of slope instability; however with the adoption
of our recommendations, this risk can be managed as “low/very low”. Further, we conclude the proposed



GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   14 | P a g e

Page 18

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




development of Lot 10 as referenced is sustainable, with a factor of safety against landslip to be greater than
1.5.

Movements are typically in the form of hillside scour and slumping from concentrated runoff and / or
inappropriate earthworks. With maintenance to the surface drainage and founding to depths as discussed,
then the risk will not preclude building. Construction should be in accordance with the recommendations
made herein, amended and / or reinforced by structural design.

A summary of the identified hazards on Lot 10 is presented in Table 5 with risk assessment prior to and
subsequent to the recommendations made herein.

                                          Table 5 Final Risk Assessment Matrix

                                                                                              Risk Assessment
                                                               Existing Risk
                      Identified Hazard                                                        Subsequent to
                                                                Assessment
                                                                                             Recommendations
             1. Hillside slope failure:-
                            Lower than dwelling                   Medium                           Very Low
                                At dwelling site                    Low                            Very Low
                             Above dwelling site                  Very Low                         Very Low
             2. Unsupported batters: -
                                                 Cut             Moderate                             Low
                                                 Fill            Moderate                             Low




 7.3       Limitations

The site features and conclusion described in this report is representative for the proposed building area at
the time of this review. Any change to the type of construction, the building location, or the shape of the
building may require further investigation and analysis, and could make the recommendations above and
attached invalid.


 7.4       Cracking of Footings

If building takes place in accordance with the recommendations made herein, amended and / or reinforced
by structural design and in accordance with the standard Building By-laws, then the risk of soil settlement
causing moderate or severe cracking of footings, as defined by AS2870, is considered to be low.




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]      15 | P a g e

Page 19

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




 8.0       REFERENCES

Australian Geomechanics Society (AGS) 2007, ‘Practice Note Guidelines for Landslide Risk Management
2007’ (AGS (2007c)), Journal and News from the Australian Geomechanics Society of Australia, vol. 24, No.
1, AGS.

Australian Geomechanics Society (AGS) 2007, ‘The Australian GeoGuides for Slope Management and
Maintenance’, Journal and News from the Australian Geomechanics Society of Australia, vol. 24, No. 1,
AGS.

Building Services Authority (BSA), Domestic Rainwater Harvesting in Queensland, viewed 28 August 2013,
http://www.bsa.qld.gov.au/SiteCollectionDocuments/Builders_Contractors/Publications/Domestic%20Rainw
ater%20Harvesting%20in%20Queensland.pdf.

CSIRO, Walsh PF 2003, Foundation Maintenance and Footing Performance: A Homeowner’s Guide, sheet
No. 10-91, CSIRO, Collingwood.

Department of Local Government and Planning, Queensland 2003, Mitigating the Adverse Impacts of
Flood, Bushfire and Landslide, State Planning Policy 1/03m, Department of Community Safety,
Queensland, Brisbane.

Department of Mines and Energy, Queensland 1999, Gympie, Australia 1:100 000 Geological Special,
Sheet 9445, Part 9545, Department of Mines and Energy, Queensland, Brisbane.

Engineers Australia (EA) 1996, Soil Erosion & Sediment Control, EA, Canberra.

Master Plumbers and Mechanical Services Association of Australia (MPMSAA) 2008, Rainwater Tank Design
and Installation Handbook, MPMSAA, Canberra.

Sunshine Coast Regional Council (SCRC) 2010, Maroochy Plan 2000 – Strategic Plan, SCRC, Nambour

Varnes, DJ & The International Association of Engineering Geology Commission on Landslides and other
Mass Movements 1984, ‘Landslide Hazard Zonation: A review of principles and practice’, Natural Hazards,
Vol 3, Paris.

Tynan AE 1973 Ground Vibration and Damage Effects on Buildings, Australia Road Research Board,
Special Report No. 11

Willmott, WF 1983, Slope stability and its Constraints on Closer Settlement on the Mapleton-Maleny
Plateau, Southeast Queensland, Record 1983/9, Geological Survey of Queensland, Brisbane.



GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   16 | P a g e

Page 20

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




                                          PLATE 1 – SITE PLAN




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   17 | P a g e

Page 21

                             CSI:SOIL TESTING...Field Investigation Diagram
                 Creabian p/l atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575
  1300 762 240, 0418 708 636 / 07 5493 5966.. adm [email protected] .au www.csisoiltesting.com .au


Comments: NTS




            CSI:8453No20TropicanaRiseCastawaysBeach                                            Page 4 of 4


[OCR of page images]
9s!
Soil
Testing

CSI:SOIL TESTING...Fieia Investigation Diagram

Creabian p/I atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575

1300 762 240, 0418 708 636 / 07 5493 5966.. [email protected] www.csisoiltesting.com.au

 

 

 

Comments: NTS

 

 

 

Tropicana Rise

 

 

 

 

 

os

Soil

Testing CSI:8453No20TropicanaRiseCastawaysBeach

Page 4 of 4

Page 22

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




                                           SITE PHOTGRAPHS




GeoConsulting Pty Ltd
    1.   1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected] 18 | P a g e

Page 23

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




GeoConsulting Pty Ltd
    1.   1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected] 19 | P a g e

Page 24

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




                            APPENDIX A – Sub-Soil Profiles




GeoConsulting Pty Ltd
    1.   1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected] 20 | P a g e

Page 25

                                      CSI:SOIL TESTING...Field Investigation Data
                   Creabian p/l atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575
    1300 762 240, 0418 708 636 / 07 5493 5966.. adm [email protected] .au www.csisoiltesting.com .au

DCP     Test   DCP
 1     Depth
                                                  (BH) Borehole No.1                                  Comments
        (m)

0       0.1          0.0 Sand (SP), fine to medium grained, pale brown becoming white, moist, loose
0       0.2          becoming medium dense
1       0.3
0       0.4
                     2.4 Terminated
0       0.5
1       0.6
0       0.7
1       0.8
1       0.9
0       1.0
1       1.1
0       1.2
1       1.3
1       1.4
1       1.5
2       1.6
2       1.7
2       1.8
3       1.9
3       2.0
3       2.1
4       2.2
4       2.3
5       2.4
5       2.5
4       2.6
4       2.7
5       2.8
8       2.9
        3.0

DCP    Test    DCP
 2     Depth
                                                  (BH) Borehole No.2                                  Comments
       (m)

0       0.1          0.0 Sand (SP), fine to medium grained, pale brown becoming white, moist, loose
0       0.2          becoming medium dense
0       0.3
1       0.4
                     2.4 Terminated
0       0.5
0       0.6
0       0.7
1       0.8
0       0.9
1       1.0
0       1.1
1       1.2
0       1.3
1       1.4
1       1.5
1       1.6
2       1.7
3       1.8
2       1.9
3       2.0
3       2.1
4       2.2
4       2.3
5       2.4
5       2.5
5       2.6
7       2.7
7       2.8
9       2.9
        3.0




               CSI:8453No20TropicanaRiseCastawaysBeach                                                Page 3 of 4


[OCR of page images]
1300 762 240, 0418 708 636 / 07 5493 5966.. [email protected]

gsi

Soil

Testing CSI:SOIL TESTING. ..Fieid Investigation Data

Creabian p/I atf....abn 17108178312 ....PO Box 1128, BUDDINA Q 4575

www.csisoiltesting.com.au

 

 

 

DcP

DCP

(BH) Borehole No.1

Comments

 

ANAARTMARWWWNNNABAOBZO2A2O2®DOO2AOO

1.0

Naaoaaan ani
SCOMNODAWNY

becoming medium dense

2.4 Terminated

0.0 Sand (SP), fine to medium grained, pale brown becoming white, moist, loose

 

DcP

DCP

(BH) Borehole No.2

Comments

 

 

 

ONNAATMARWWNHNWNABABOBAOBZOR2DODOBOOO

 

1.0

Naaoaaan ani
SCOMNODAWNY

 

becoming medium dense

2.4 Terminated

 

0.0 Sand (SP), fine to medium grained, pale brown becoming white, moist, loose

 

 

 

 

 

os!
Soil
Testing

CS1I:8453No20TropicanaRiseCastawaysBeach

Page 3 of 4

Page 26

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




         APPENDIX B – Extract from The Noosa Plan


                                                                                                Lot 10 (MCH 5387)
                                                                                                No. 20 Tropicana Rise,
                                                                                                Castaways Beach




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]      21 | P a g e

Page 27

Report #S7186, Lot 10 (MCH 5387), Tropicana Rise, Castaways Beach QLD 4567
28 August 2013




      APPENDIX C – Extracts from “Practice Notes &
       Guidelines for Landslide Risk Management”
                                                         AGC (2007c)



                         1. TERMINOLOGY & RISK ASSESSMENT MATRIX



                  2. “SOME GUIDELINES FOR HILLSIDE CONSTRUCTION”



                         3. “EXAMPLES OF GOOD HILLSIDE PRACTICE”




GeoConsulting Pty Ltd
1/8 Denna St, Maroochydore, QLD, 4558. Phone: 5443 6622, Fax: 5479 1899, Email: [email protected]   22 | P a g e

Page 28

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                              APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                    QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor               Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
                                                                    20 years     The event will probably occur under adverse conditions over the
        -2
   10                                      100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
     -3               5x10                                       200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                      5x10-4                                     2000 years
                                                                                 The event might occur under very adverse circumstances over the
   10-4                                   10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
     -5               5x10-5                                     20,000 years
   10                                                                            The event is conceivable but only under exceptional circumstances
                                         100,000 years                                                                                                               RARE                             E
                                                                                 over the design life.
     -6                5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
   200%                                                                                                                                                             CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


   91                                                          Australian Geomechanics Vol 42 No 1 March 2007

Page 29

                                        PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                      LIKELIHOOD                                                  CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                           Indicative Value of         1: CATASTROPHIC                 2: MAJOR                3: MEDIUM                4: MINOR                    5:
                                          Approximate Annual                 200%                         60%                      20%                     5%                INSIGNIFICANT
                                              Probability                                                                                                                         0.5%
A –    ALMOST CERTAIN                              10-1                          VH                         VH                      VH                       H                   M or L (5)
                                                     -2
B -    LIKELY                                      10                            VH                         VH                       H                       M                       L
C -    POSSIBLE                                    10-3                          VH                          H                       M                       M                      VL

D -    UNLIKELY                                    10-4                           H                         M                        L                       L                      VL
                                                     -5
E -    RARE                                        10                             M                          L                       L                      VL                      VL
                                                     -6
F -    BARELY CREDIBLE                             10                             L                         VL                      VL                      VL                      VL
      Notes:    (5)   For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
                (6)   When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                      time.


      RISK LEVEL IMPLICATIONS
                         Risk Level                                                                                 Example Implications (7)
                                                                  Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
           VH                    VERY HIGH RISK                   options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                  property.
                                                                  Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
           H                          HIGH RISK
                                                                  risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                  May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
           M                     MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                  implemented as soon as practicable.
                                                                  Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
           L                          LOW RISK
                                                                  required.
                                                                  Acceptable. Manage by normal slope maintenance procedures.
           VL                     VERY LOW RISK

       Note:    (7)   The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only
                      given as a general guide.




      92                         Australian Geomechanics Vol 42 No 1 March 2007

Page 30

     PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



          APPENDIX G - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                 GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
ADVICE
GEOTECHNICAL     Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
ASSESSMENT       stage of planning and before site works.                                             geotechnical advice.
PLANNING
SITE PLANNING    Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                 arising from the identified hazards and consequences in mind.
DESIGN AND CONSTRUCTION
                 Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                 or steel frames, timber or panel cladding.                                           filling.
 HOUSE DESIGN
                 Consider use of split levels.                                                        Movement intolerant structures.
                 Use decks for recreational areas where appropriate.
SITE CLEARING    Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
    ACCESS &     Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
   DRIVEWAYS     Council specifications for grades may need to be modified.                           geotechnical advice.
                 Driveways and parking areas may need to be fully supported on piers.
EARTHWORKS       Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                 Minimise depth.                                                                      Large scale cuts and benching.
      CUTS       Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                 Provide drainage measures and erosion control.                                       Ignore drainage requirements
                 Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                 Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                 Use clean fill materials and compact to engineering standards.                       onto property below.
      FILLS      Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                 Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                      Include stumps, trees, vegetation, topsoil,
                                                                                                      boulders, building rubble etc in fill.
 ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
  & BOULDERS     Support rock faces where necessary.                                                  boulders.
                 Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                 Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
   RETAINING
                 Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
     WALLS
                 above.                                                                               Lack of subsurface drains and weepholes.
                 Construct wall as soon as possible after cut/fill operation.
                 Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                 Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
   FOOTINGS
                 Design for lateral creep pressures if necessary.
                 Backfill footing excavations to exclude ingress of surface water.
                 Engineer designed.
                 Support on piers to rock where practicable.
SWIMMING POOLS   Provide with under-drainage and gravity drain outlet where practicable.
                 Design for high soil pressures which may develop on uphill side whilst there
                 may be little or no lateral support on downhill side.
   DRAINAGE
                 Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                 Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
    SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                 Line to minimise infiltration and make flexible where possible.
                 Special structures to dissipate energy at changes of slope and/or direction.
                 Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                 Provide drain behind retaining walls.
   SUBSURFACE
                 Use flexible pipelines with access for maintenance.
                 Prevent inflow of surface water.
                 Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
    SEPTIC &
                 be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
    SULLAGE
                 Storage tanks should be water-tight and adequately founded.                          of landslide risk.
   EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
  CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
 LANDSCAPING
DRAWINGS AND SITE VISITS DURING CONSTRUCTION
   DRAWINGS      Building Application drawings should be viewed by geotechnical consultant
   SITE VISITS   Site Visits by consultant may be appropriate during construction/
INSPECTION AND MAINTENANCE BY OWNER
   OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
RESPONSIBILITY   pipes.
                 Where structural distress is evident see advice.
                 If seepage observed, determine causes or seek advice on consequences.




                         Australian Geomechanics Vol 42 No 1 March 2007                                                                 113

Page 31

      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




114             Australian Geomechanics Vol 42 No 1 March 2007

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT - MCU13_0146.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.