                                              SC   RC CORRESPONDE   NCE
                                                                                                   13)x0 a ;3C5. z)':



                                                                                                                                 11
   8 December 2011

   Our Ref: 11437 / Office: Sunshine Coast
                                                                                                                                 kha
                                                                                                                                 DEVELOPMENT
                                                                                                                                 M A N A G E R S
   Council Ref: 2006/1395



   SUNSHINE COAST REGIONAL COUNCIL                                                         Development Counter
   LOCKED BAG 72
   SUNSHINE COAST MAIL CENTRE QLD 4560                                                                        8 DEC 2011
   ATTENTION:           Planning Assessment - North
                                                                                                   Maroochydore
   Dear Sir

   REQUEST FOR EXTENSION TO RELEVANT PERIOD                                                                       pLPA-&3%'%4- ASS

   142 NOOSA DRIVE, NOOSA HEADS
   LOT 3 SP1 26203                                                                                  Pwree^
                                                                                                         ,L

   In relation to the Development Permit for Material Change of Use for the above-mentioned land,
   originally granted by Sunshine Coast Regional Council on 24 January 2008, on behalf of the applicant
   we hereby request to extend the relevant period of the approval by an additional four (4) years in
   accordance with Section 383 of the Sustainable Planning Act 2009. This would extend the validity of
   the approval to 16 May 2016. The current approval will lapse 16 May 2012.

   Please find enclosed the following documentation to facilitate Council's assessment of the request:

    n    Extension to relevant Period Form;
    n    Attachment 1 - Current Decision Notice; and
    n    A cheque for the required application fee of $1,624.

   The applicant seeks a four (4) year extension to the approval in order to allow sufficient time to
   deliver the project. The global financial crisis has failed to provide the economic stability required to
   progress the development within the time frame of the current approval. Extension to the relevant
   period of the approval is considered a reasonable request given the current economic climate and
   associated decrease in demand and tighter funding controls.

   While the development approval was assessed and granted under the superseded planning scheme
   prior to the Noosa Plan, the development does not conflict with the intent and provisions of the Noosa
   Plan. A summary of compliance with the core Noosa Plan provisions is below:

   Provision                                Comment
   Zoning                                   Under The Noosa Plan the site is included in the Noosa Heads Locality
                                            and both the Semi-attached Housing Zone and the Open Space
                                            Conservation Zone.      While the zoning lines slightly differs from the
                                            superseded scheme a detailed ecological assessment was undertaken as
                                            part of the original application. This assessment established that the
                                            proposed development would not adversely impact the core


                     PLANNING I SURVEYING I PROJECT MANAGEMENT I COURT APPEALS

Brisbane                                            Sunshine Coast                                      North Queensland

Suite 1, 14 Lever Street, Albion Qld 4010           Suite 1, Corner Surf Road & Gardak Street           1C/41 Stunt Street, Townsville Qld 4810
PC Box 266, Albion DC Qld 4010                      Alexandra Headland Qld 4572                         PO Box 5027, Townsville Qld 4810
p 1 07 3262 1200 f 107 3262 1499                    PC Box 6380, Maroochydore BC Qld 4558               p 1 07 4721 3066 f 1 07 4721 3088
                                                    p 1 07 5443 2844 f 1 07 5443 7146

                     {Con H-L- R Occnniatoc Ph, I +h 0(:\I mmn 97P e n APNI 7a nne anG P trarl- - KN4 flo.,olnnmon+ n/lanancrc
Full text of the other 21 pages

Page 2

                            environmental values of the site.      It was acknowledged by Council as
                            part of the application assessment that the mapping of both the
                            superseded Strategic Plan and the Noosa Plan were similar with respect
                            of the areas identified for open space and residential development.
Use                         The approved use is for a Multiple Dwelling. This is the same as Multiple
                            housing Type 4 conventional under the Noosa Plan. Multiple housing
                            Type 4 is a consistent use under the current Semi-attached Housing
                            Zone.
Density                     The Semi-attached Housing Zone area covers 70% of the site
                            (communication with Councils Trish Sweeney). Based on the site area of
                            5455m2, this equals 3818.5m2. Clause 3 of the Deed made 22 December
                            1999 between Noosa Council, Aqua Blue (Noosa) Pty Ltd and Johanna
                            Thannhauser (included with the original application) agreed that Council
                            will take into account the area of 236m2 to be transferred as road
                            pursuant to the Deed in respect of any future development application for
                            the purposes of assessing the allowable site density. This increases the
                            applicable residential assessment area to 4054.5m2. The Noosa Plan
                            allows a density of 100 persons per hectare, equating to 40.545 persons.
                            Calculated at the hypothetical population rate of 3.3 persons this supports
                            12 x 3 bed units. The approved 10 x 3 bedroom units are consistent with
                            the Noosa Plan.
Gross Floor Area            The Noosa Plan allows a GFA of maximum population density x 40m2,
                            which allows 1621.8m2. The approved maximum GFA of 1896m2 is largely
                            consistent with the Noosa Plan. Given that the zoning lines are not
                            cadastrally based, the zoning area and density/GFA calculations should be
                            considered a guide only. As the original application included a detailed
                            ecological assessment demonstrating the carrying capacity of the site, the
                            approved maximum GFA is appropriate for the site and does not offend
                            the Noosa Plan.
Site Cover                  The Noosa Plan allows a maximum site cover of 40%. While the
                            approved plan does not specify a site cover it is considerably less than
                            40%. The approved site cover is consistent with the Noosa Plan.
Height                      The Noosa Plan allows a maximum height of 2 storey/8m. The approved
                            2 storeys/8m height limit is consistent with the Noosa Plan.

As demonstrated by the table above, the approved development does not offend the provisions of the
Noosa Plan. Approval of an extension to relevant period is warranted.


Should you have any questions with respect to the above, please do not hesitate to contact me direct.

Yours faithfully
KHA DEVELOPMENT MANAGERS

Page 3

Sunshine
Regional Council
                 Coast                             Locked Bag 72
                                                   Sunshine Coast Mail Centre
                                                   Qld 4560
                                                                                   T 07 5475 7272
                                                                                   F 07 5475 7277
                                                                                   E [email protected]
                                                   ABN 37 876 973 913              W wvnn.sunshinecoast.gld.gov au

                                                   Officer:           Kerri Coyle
                                                   Direct Telephone:  (07) 5449 5223
                                                   Response Address: PO Box 141, Tewantin QLD 4565
                                                   Email:             kerri.coyieCsunshinecoast.old.oov.au
                                                   Our Reference:     200611395
                                                   Your Reference:
 15 July 2008

 Johanna Thannhauser                                                                      ^ECFTVED
 CARE Ken Hicks & Associates                                                                   1 7 JUL 2008
 PO Box 6380
 MAROOCHYDORE BC QLD 4558                                                                BY:


 Dear Madam

                            Change to an Existing Approval
                                        Integrated Planning Act 1997
 I refer to your request to make a change to an existing approval. On 14 July 2008 Council decided
 your requested changes.
 Details of the decision with the consolidated conditions are as follows:
                       TIQIV PETALS°?

     Application No:                   2006/1395
     Street address:                   142 Noosa Drive, Noosa Heads
     Real property description:        Lot 3 SP 126203
     Planning Scheme:                  The Noosa Plan

          D CiSIbN D,
 Council on 24 January 2008 decided to issue the following type of approval: -
 •      Preliminary Approval for Material Change of Use - Application to be Assessed Against the
        Superseded Planning Scheme - Multiple Dwelling (10 Units)
  In relation to representations, Council on 15 May 2008 decided to issue a Development Permit and:
 A.      Agree to change Conditions 1, 2, 15, 16, 17, 27, 30, 34 & 66
  B.     Agree to delete Conditions 27.4.2, 27.4.3, 27.5, 27.5.1, 27.5.2, 63 & 64
 .C.     Refuse to delete Condition 27.11 for the following reasons:
         The site is part of a known koala habitat corridor and therefore in replanting it is appropriate to
         incorporate some koala habitat trees
  D.      Issue a Negotiated Decision Notice
 In relation to the request to make a change to the existing approval, Council on 14 July 2008 decided
 to:
 A.       Approve a change to Conditions 13 & 34

                                                                                                 Page 1 of 19




Caloundra Office                  Maroochydore Office            Nambour Office                    Tewantin Office
1 Omrah Avenue                    11 - 13 Ocean Street           Cnr Currie and Bury Streets       9 Pelican Street
Caloundra Qld 4551                Maroochydore Qld 4558          Nambour Qld 4560                  Tewantin Old 4565
T 07 5420 8200                    T 07 5475 8501                 T 07 5475 8501                    T 07 5449 5200
F 07 5420 8900                    F 07 5441 8338                 F 07 5441 8338                    F 07 5447 1062

Page 4

                                                                                          2006/1355


B.    Delete the requirement for a further Development Permit for Material Change of Use, and
      change the requirement for a Development Permit for Reconfiguring a Lot to prior to issue of a
      Development Permit for Operational Works
C,    Issue a Change to an Existing Approval
13    RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
      ASSESSMENT MANAGER-CONDITIONS
Land Use
 1.   Development undertaken in accordance with this approval must generally comply with the
      approved plans. The approved plans are titled and numbered Proposed Site Plan - TP-01,
      Site Plan with Contours - TP-02, Typical Duplex Plans - TP-04 & TP-05 and Proposed
      Sections TP-03 (Project No. 2005-02) prepared by Foster Designs Pty Ltd and Architects and
      dated 17/05/2006 and as may be amended by these conditions.
2.    The applicant is required to lodge plans with Council prior to issue of a Development Permit
      for Operational Works demonstrating compliance with the following requirements:-
      2.1.   The development shall not exceed a maximum building height of 2 storeys and 8 metres
             above natural ground surface and finished ground level.
      2.2.   The roof form of the proposed buildings shall incorporate roof pitching, sunhoods and
             eaves. The buildings rooves shall have a minimum pitch of 5 degrees, shall incorporate
             eave overhangs a minimum 600mm wide and shall not include rooftop terrace areas.
      2.3.   Balconies shall not be enclosed, balustrades shall be constructed of open transparent
             materials, a mix of materials shall be included in the external finishes including light
             weight materials, and no colonnades are used.
      2.4.   The following building setbacks shall be provided:-
             2.4.1.      A minimum of 6m from the Noosa Drive road frontage boundary;
             2.4.2.      A minimum of 4 metres to the southwestern side boundary excluding the
                         carport associated with Unit 4 which shall be setback a minimum of 2.5
                         metres;
             2.4.3.      A minimum of 3 metres to northern side boundary;
             2.4.4.      A minimum of 6 metres to the western rear boundary for Unit 2;
                      2.4.4.1.   A minimum of 10 metres for Unit 1; and
                      2.4.4.2. A minimum of 8 metres for Unit 3 as indicated on the approved plans.
 3.   The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
 4.   The development footprint shall be setback a minimum of 30 metres from the level of Highest
      Astronomical Tides in Weyba Creek.
 5.   Any advertising sign or device is to comply with Council's policies on advertising.
 6.   All hot water systems installed shall be either solar systems; electric heat pump systems; or
      gas systems (LPG or natural).


                                                                                      Page 2 of 19

Page 5

                                                                                      2006/1395


7.    A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of work confirming compliance with the maximum
      allowable building height as required, by either the conditions of approval or the Planning
      Scheme.
8.    Any deck or balcony areas are not to be enclosed with shutters, glass panelling or the like,
      thus remaining as open structures,
9.    The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
10.   The development shall contain a maximum of 10 x 3 bedroom units comprised of 7 buildings
      generally in accordance with the approved plans.
11.   The lengths of wall in one plane, irrespective of projections or setbacks, are to be no greater
      than 16m.
12.   External materials of the development shall consist of natural muted colours and tones to
      further assist the built form of the development to integrate with the surrounding environment.
Open Space
13.   The area of land located at the rear of the site and identified as Open Space - Waterway and
      Conservation Protection by the Strategic Plan as shown on approved plan, Proposed Site Plan
      - TP-01, shall be dedicated to the Crown (with Council as Trustee) for environmental
      protection purposes pursuant to the Land Act. This area of land shall be dedicated to the
      Crown prior to the commencement of the use.
14.   Any security lighting associated with proposed Units I - 3 shall be orientated away from this
      area of land to be dedicated to the Crown.
Burrowing Skink
15.   Clearing of existing vegetation identified as Primary Habitat by Map 5 - Potential Skink Habitat
      shall only be permitted within a maximum of 3 metres from the building footprint, as indicated
      on the approved plans, of Units 1 - 3. Map 5 - Potential Skink Habitat accompanies the
      Ecological Assessment Report and has been prepared by Biological and Environmental
      Service and dated 19 may 2006.
16.   The existing vegetation to be retained within the primary habitat areas identified.in Map 5 -
      Potential Skink Habitat to the rear of units 1 - 3 and adjacent the north western boundary to
      the required park dedication shall be protected during construction and preparation of the site
      for construction with a temporary wire and steel post fence. Map 5 - Potential Skink Habitat
      accompanies the Ecological Assessment Report and has been prepared by Biological and
      Environmental Service and dated 19 may 2006.
Acoustic Requirements
17.   An acoustic buffer shall be provided on site adjacent to Noosa Drive extending the full length
      of the eastern property boundary.. This buffer shall comprise a 2 metre high acoustic fence
      along the eastern property boundary and consist of the following requirements:-
      17.1. The acoustic buffer shall be constructed in a koala friendly manner as outlined in Policy
            1 - Nature Conservation (Koala) Conservation Plan 2006 and Management Program
            2006-2016; and



                                                                                     Page 3 of 19

Page 6

                                                                                      2006/1395


      17.2. The acoustic buffer shall be setback a minimum of 2 metres from the eastern property
            boundary adjacent to Noosa Drive excluding the area of land where the eastern
            property boundary coincides with the approved reciprocal easement located at the
            northern extent of the eastern property boundary. The acoustic barrier at this location
            shall be provided along the boundary of the property and the western boundary of the
            registered easement.
18.   A noise assessment report prepared by an independent acoustic engineer shall be submitted
      to Council after construction of the acoustic buffer to Noosa Drive. The report is to indicate
      whether the buffer achieves the acoustic requirements of this development approval for single
      storey dwelling houses and advise of any other remedial actions that may need to be
      implemented. The developer shall implement all identified remedial actions to the reasonable
      satisfaction of the Manager Land Use.
19,   Screening species shall be provided to the area of land between the acoustic buffer and the
      access driveway to the site where the acoustic buffer is located along the property boundary
      and the boundary of the easement to create a visual buffer between the acoustic buffer and
      Noosa Drive.
20.   The first floor of units 4 - 10 shall be acoustically designed to ensure road noise does not
      exceed 630(A)L,o(l8hOU,s) based on predicted traffic volumes ten years hence. An acoustic
      report prepared by a suitably qualified consultant shall be lodged with an application for
      Building Works identifying suitable noise mitigation measures for these units.               All
      recommended mitigation measures for the subject units shall be installed prior to occupation.
Koala Management
21.   All clearing of native vegetation on-site shall be in accordance with Section 16 of the Nature
      Conservation (Koala) Conservation Plan 2006 requiring that a koala spotter be present on site
      to protect koalas from death or injury and allow for their safe movement away from areas of
      the site subject to clearing. Koala habitat trees include species of Angophora, Corymbia,
      Eucalyptus, Lophostemon and Melaleuca.
22.   All clearing of native vegetation shall be in accordance with Section 15 of the Nature
      Conservation (Koala) Conservation Plan 2006 requiring that clearing be undertaken in a way
      that complies with the sequential clearing conditions as specified in the relevant Section. The
      requirement shall ensure that koalas living in or near the clearing site have enough time to
      move out of the area without human intervention.
23.   No koalas shall be permitted to be captured or translocated from the site. A tree in which a
      koala is present, and any tree overlapping that tree, shall be left until the koala has moved
      from the tree of its own volition.
Fauna
24.   An experienced wildlife spotter shall be on site at all times during the clearing of any
      vegetation to ensure the survival of faunal species utilising the site as habitat.
Landscape Plans
25.   A Development Permit for Operational Works for landscaping shall be obtained prior to the
      commencement of any landscaping works. All detailed landscape plans for the development
      shall comply with the requirements of the landscaping conditions herein. To this extent the
      landscaping plans shall be prepared by a qualified Landscape Architect or qualified
      horticulturist.
26.   Landscaped areas shall be integrated floristically and structurally with the surrounding native
      vegetation. To be consistent with an ecologically sustainable design philosophy, all species
      located in landscape areas within the developed portion of the site shall be consistent with
      Council's Landscaping Guidelines - Planning Scheme Policy PSP3.

                                                                                    Page 4 of 19

Page 7

                                                                                        2006/1395

27.   A Landscape Plan shall be prepared for all of the required building setback areas, including
      the buffer area at the frontage of the site adjacent to Noosa Drive. Where other permits for
      Operational Works for roads, drainage or access are required, the landscaping layout shall be
      based on approved drawings for those operational works. The detailed landscaping plans are
      to address:-
      27.1. Street tree planting to allow good shade canopy once fully mature to Noosa Drive;
      27.2. Road & service locations;
      27.3. The retention of existing native vegetation within the following areas:-
            27.3.1.    The 2 metre buffer adjacent to Noosa Drive and the required side property
                       setbacks of Units 4 - 10 located to the east of the proposed internal driveway
                       and access and measures employed to ensure this vegetation retention;
            27.3.2.    Around the perimeter of the development footprint of Units 4 - 10; and
            27.3.3.    The required building setbacks and the areas identified as Primary Habitat on
                       Map 5 - Potential Skink Habitat (excluding the building envelopes of Units I -
                       3 including a maximum of 2 metres beyond the building footprints of these
                       units as indicated on the approved plans). Map 5 - Potential Skink Habitat
                       accompanies the Ecological Assessment Report and has been prepared by
                       Biological and Environmental Service and dated 19 may 2006.
      27.4. Landscaping treatments including dense vegetation to the following:-
            27.4.1.    The 2 metre vegetated buffer adjacent to Noosa Drive;
            27.4.2.    Deleted;
            27.4.3.    Deleted
            27.4.4.    East of the acoustic buffer located on boundary of the property and the
                       registered easement for the site.
      27.5. Deleted.
             27.5.1.   Deleted.
             27.5.2.   Deleted.
      27.6. All the works and items that the Developer shall undertake or provide to establish and
            secure the rear conservation area prior to dedication.
      27.7. Tree protection during construction with particular emphasis on the vegetation to be
            retained on the site included but not limited to the following;-
             27.7.1.   The existing native vegetation to be retained within the required building
                       setbacks of Units 1, 2 and 3 and within the area identified as Primary Habitat
                       on Map 5 - Potential Skink Habitat. Map 5 - Potential Skink Habitat
                       accompanies the Ecological Assessment Report and has been prepared by
                       Biological and Environmental Service and dated 19 may 2006;
             27.7.2.   Vegetation being retained around the perimeter of the development footprint
                       of Units 4 -10;
             27.7.3.   The area of the land to be dedicated to the Crown located at the rear of the
                       site and designated Open Space Conservation and Waterway Protection
                       under the Strategic Plan;
             27.7.4.   The area of land contained within the required 2 metre building setback at the
                       frontage of the site adjacent to Noosa Drive.
      27.8. Site preparation;
                                                                                       Page 5 of 19

Page 8

                                                                                      2006/1395


      27.9. Fences to neighbouring properties;
      27.10.Stabilisation of the areas under the suspended slabs with a suitable substrate that
            emulates the production of leaf litter to provide habitat for the Burrowing Skink.
      27.11. Habitat enhancement for native fauna, specifically the inclusion and replanting of Koala
             Habitat Species;
      27.12. Removal of undesirable species and environmental weed removal and control;
      27.13. Planting schedules;
      27.14. Planting out procedures and horticultural requirements;
      27.15. Mulching and fertilising procedures;
      27.16. Irrigation and watering procedures;
      27.17. Erosion and sediment control;
      27.18. On-going maintenance;
      27.19. Construction materials and details;
      27.20. Environmental safeguards.
      Such landscaping is to be completed in accordance with the approved landscaping plan prior
      to acceptance of the development On Maintenance.
28.   All underground services, drainage, footpaths, bike paths, roads and other site works shall be
      located to minimize adverse impacts on retained vegetation, particularly their root systems.
29.   Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use. These landscape
      plans required to be submitted are to denote areas of existing vegetation or existing trees
      proposed or required to be retained.
Vegetation Management
30.   A vegetation survey shall be submitted to the satisfaction of the Manager Land Use identifying
      vegetation to be retained on site. This shall include at a minimum vegetation within the
      required 2 metre acoustic fence to Noosa Drive, vegetation required to be retained for the
      skink habitat as identified by condition 27 and some groupings of healthy trees in amongst the
      development.
Vegetation Removal and Disposal
31.   Vegetation removal, tree felling and lopping shall be undertaken in an environmentally
      sensitive manner to avoid damaging surrounding vegetation, trees and habitat:-
      31.1. All cleared vegetation shall be suitably processed or removed from the site by a method
            approved by Council;
      31.2. Reproductive components of environmental weed species cleared from the site shall not
            be mulched, with the material to be removed from the site and disposed of in a Council
            approved refuse tip;
      31.3. Burning off is not considered an acceptable means of disposal and is not to take place;
      31.4. During construction, the boundaries of areas of retained and protected vegetation within
            the development area shall be clearly marked for the purpose of preventing access into
            these areas thereby protecting the vegetation and habitat values;
      31.5. All mulch produced on site by mulching cleared vegetation and trees shall specifically
            exclude reproductive material (particularly seeds) from environmental weed species (eg.
            Camphor laurel, lantana, asparagus and umbrella trees).
                                                                                     Page 6 of 19

Page 9

                                                                                      2006/1395


32.   Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
33.   The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
34.   The Development Permit lapses if the use has not happened by 16 May 2012, unless an
      application to extend the currency is approved by Council.
35.   The developer must obtain all of the other Development Permits referred to in the Decision
      Notice, prior to obtaining a Development Permit for Building Works.
Building Services
36.   The wall of the garage setback 300mm from the southern side boundary is to be maintenance
      free as per Clause A6 of the Queensland Development Code (QDC) Part 12.
37.   The combined height of the retaining walls and boundary fences must not exceed 2.0 metres
      above natural ground.
Land Development
River Flooding
38.   All habitable rooms proposed on site shall be constructed to comply with Council's Minimum
      Floor Height requirements as defined in Council's Planning Scheme and on Council's Scheme
      Maps at the time of issue of the Building Permit. In this regard a Minimum Floor Height of RL
      2.8 (AHD) is required for all habitable rooms. These levels however are subject to change and
      verification shall be made to Council's Land Development Section prior to obtaining a
      Development Permit for Building Works.
Vehicle Access
39.   The access driveway to serve Lot 3 on SP 126203 shall be constructed over reciprocal access
      easements ASP126203 and BSP126203 generally in accordance with Fig 2.1 by Callaghan
      and Toth dated 13th June 2007 and Plan no. 990605 by Ken Hicks and Associates dated
      12/10/99 except where modified to facilitate the turning of garbage service vehicles.
40.   The access driveway to serve Lot 3 on SP 126203 shall be designed and constructed so as to
      allow a garbage service vehicle defined in "PSP9 Waste Management" as a AUSTROADS:
      design single unit truck/bus (12.5m) to enter and leave the site in a forward direction.
41.   The driveway shall be designed and constructed to Council's design standards and to grades
      that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
      grades that do not comply with AS2890.1-2004 and AS2890.2-1989, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
42.   All vehicles shall enter and leave the site in a forward direction.
Carparking
43.   Carparking shall be provided within as shown on drawing number TP-01 dated 17105/06 by
      Foster Designs Pty Ltd Architects.
44.   A minimum of 4 uncovered carpark spaces and 20 covered carpark spaces shall be provided
      on site.
45.   The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
      user class Al with allowance for vehicles to enter and leave the site in a forward gear and with
      a minimum head clearance (headroom) at any point of 2.2m.
                                                                                    Page 7 of 19

Page 10

                                                                                         2006/1395


46.   All carparking shall be kept, maintained and line-marked in a condition fit for use.
Frontage Works
47.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Noosa Drive frontage of the site in accordance with Planning Scheme Policy PSP1
      Landscaping Guidelines. Grass shall be couch and free of weeds.
Stormwater Drainage
48.   Stormwater drainage shall be constructed generally in accordance with the report entitled
      "Stormwater Quality Management and Assessment Report" June 2007 by Callaghan and Toth.
49.   Final plans of the drainage design shall be prepared by a Registered Professional Civil
      Engineer and submitted to Council prior to obtaining a Development Permit for Operational
      Works.
50.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site.
51.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank
      (minimum storage 3000 litres per dwelling/unit) that is Installed to ensure water from the tank
      can be used for external uses (such as watering gardens, irrigation, ornamental ponds, water
      features, topping-up swimming pools, outdoor cleaning, etc) and for use in flushing of toilets
      internal to the dwelling/building.   All rainwater tanks are to be designed and Installed in
      accordance with the Queensland Development Code (QDC), Part 25 - Rainwater Tanks, and
      shall be part of the plumbing application in conjunction with the building approval. The
      location and capacity of the tanks shall be clearly shown on the plans submitted for Building
      Works approval.
52.   To ensure that polluted run-off does not enter Council's stormwater drainage system,
      stormwater run-off from the carparking areas and the driveways shall have the first flush (the
      first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
      being permitted to discharge into Council's drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged
      through a single underground drain line directly into the existing drainage system, bypassing
      the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.
      The approved maintenance plan shall be incorporated in the Community Management
      Scheme for the development and a copy of this shall be provided for Council's records prior to
      commencement of the approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
53.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
54.   The site shall be connected to the Noosa Sanctuary Development sewer reticulation system
      and be constructed in accordance with Council's standards and requirements at no cost to
      Council.
55.   All sewage shall drainage by means of gravity to the sewage pump station located on lot 2
      SP110327 as per the Deed made on 22 December 1999 between Noosa Council, Aqua Blue
      (Noosa) Pty Ltd and the applicant, Johanna Jacoba Thannhauser.


                                                                                       Page 6 of 19

Page 11

                                                                                      2006/1395


56.    Should the drainage via gravity not be possible a new arrangement will need to be negotiated
       with Noosa Council
57.    The sewer system is to be kept and maintained in a condition suitable for use and shall not
       cause adverse impacts on the environment.
Town Water Supply
58.    Connection to Council's water supply shall be generally in accordance with Plan H-SP-02
       drawn by Brian Burnett & Associates dated 2007.02.12 for Aqua Blue Noosa Sanctuary
       Development.
.59.   The site shall be connected to Council's town water supply and be constructed in accordance
       with Council's standards and requirements at no cost to Council.
60.    Each individual water connection to the water reticulation system shall extend to the property
       boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
61.    All water meters must be located in an easily assessable location to facilitate unhindered
       reading by Council and/or Council's contracted water meter readers, and Mt behind fences or
       locked gates.
62.    For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
       shall be served by:
       62.1. A single Body Corporate water meter to measure the total water consumption (including
             fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
       62.2. Individual water meters to each tenement capable of being separately rated, and
       62.3. A fire service (fully testable single detector check with metered bypass), where
             applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
             reels).
Acid Sulfate Soils
63.    Deleted.
64.    Deleted.
Erosion and Sediment Control
65.    Any person acting on this permit shall prevent erosion and sediment export.from leaving the
       site. Site control measures such as silt fencing, controlled gravel access to the site and
       controlled disposal of waste, will be necessary.
       In this regard plans detailing the methods of controlling erosion and sediment are required to
       be submitted to the Council for approval prior to obtaining a Development Permit for
       Operational Works.
Contributions Towards Council Infrastructure
66.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
       upgrading various infrastructure at the rates applicable at the time of payment. An estimate
       only of the contribution amounts under the current Council policies and requirements is
       outlined in the table below:
        Contribution;Require;d For: -;                                               Amount:
        PSP16 - Sewerage Headworks Contributions                                     $25,204
        PSP17 - Water Supply Headworks Contributions                                 $36,670
        PSP20 - Pathway Trunk Network Contributions                                  $6,685


                                                                                    Page 9of19

Page 12

                                                                                       2006/1395

       TOTAL Contribution Amount =                                                    $68,559
       Please note, that these amounts are all sub' cwt to variations in the Consumer Price Index, All
       Groups Brisbane from June 2007 until the date of payment.


      All contributions must be paid prior to the issue of a Development Permit for Operational
      Works
General
67.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council's standards and at no cost to Council.
68.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
69.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
Environmental Health
70.   The developer must provide waste storage and disposal facilities in accordance with Planning
      Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial and Industrial
      Premises", including an external imperviously paved area correctly sized for all 'refuse and
      recycling containers and suitably screened from public places and neighbouring properties. A
      bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via
      a bucket trap. The drain outlet is to be designed to prevent storm water entry to the sewerage
      system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide
      (max 0.5m2), or alternatively the waste area can be roofed, or any other design approved by
      Council.
71.   A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
      "Waste Management Multi-Dwellings and Commercial and Industrial Premises", must be
      submitted for the day-to-day operation of the development and approved by Council's Health
      Section prior to issue of development permit for operational works.
      It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
      explaining exactly how to predict waste quantities and design waste areas is available from
      Council and the web. The Plan shall include the following information: -
          •   The types of waste that will be generated from the activities approved within the
              development.
          •   Estimated volumes or tonnage of both recyclables and waste generated.
          •   Methods to be used for dealing with garden waste.
          •   Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
          •   Description of procedures for getting all waste to the bins; the storage of bins and the
              collection of bins by the contractor.
          •   A description of the design details of waste storage and recycling areas including size,
              location, elevation and floor plan, methods of bin washing and system to prevent
              storm water getting into sewer via the bin wash.
          •   A description of types and volume of waste storage containers to be used.


                                                                                     Page 10 of 19

Page 13

                                                                                       2006/i 395


       •        The waste and recycling storage area shall include the provision of containers for all
                waste and recycling materials including putresable matter, non-recycling waste, paper/
                cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin
                washing facilities connected to sewer.
       •        A detailed description of vehicular access to collect waste. Where collection is off
                street, access must allow vehicles to enter and leave the site in a forward direction.
72.   A Waste Management Plan (construction and demolition) shall be submitted prior to
      demolition, removal or relocation of any building other than a shed.
      A Waste Management Plan (construction and demolition) is also required for construction of
      15 or more dwelling units or for any business use of greater than 500m2.
      Waste Management Plans (construction and demolition) are required to be submitted in
      accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
      Waste storage areas are to provide for adequate separation of all reusable, recyclable and
      waste materials. These shall be located so that they are convenient and safe to use. (Refer to
      Noosa Council Waste Management Code).
      The Plan shall contain the following information:
       •        The site area for the storage and separation of waste is to be shown on the plan
                drawings accompanying the application.
       •        A waste management table as indicated below is to be completed showing how waste
                material is to be segregated - recycled - reused or disposed.
       MATERIALS ON-SITE                   DESTINATION
                                           Re-use and Recycling                     Disposal
       Expected        waste   Estimated   On-site              Off-site             *specify
       materials               volume      *specify proposed    *specify             contractor    and
                               (m')        re-use or on-site    contractor     and landfill site or
                                           recycling            recycling outlet     other     disposal
                                           methods                                   site
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber-please
       specify
        Plasterboard
       Metals - please
       specify
       Asbestos
        Other -       please
        specify


      Note * If a demolition contractor is undertaking works, then the Waste Management table is to
      be completed by the demolition contractor.
                                                                                    Page 11 of 19

Page 14

                                                                                      2006/1395



      The purpose of the Waste Management Plan Is to facilitate the segregation of waste for the
      effective reuse and recycling of such materials. Additionally Council rewards those who
      segregate waste by significantly reducing disposal fees at the landfill some items are free.
      Higher gate fees are charged for loads of mixed waste.


73.   Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
      pumps etc) shall comply with the following requirements:
      The equipment shall be installed and located in a manner that prevents excessive noise in
      accordance with Council's Local Law No. 12 - Control of Nuisances. Infringement Notices (on-
      the-spot fines) may apply for offences.
      A person must not use equipment on any day if it makes or causes noise to be made -
      From 10pm to 7am: More than the lower of either -
        •      40 dB(A)
        •      3 dB(A) above the background noise level
        •      No audible noise for pool pumps apply during these hours.
               From 7am to 7pm: More than the lower of either -
        •      50 dB(A)
        •      5 dB(A) above the background noise level
               From 7pm to 10pm: More than 3 dB(A) above the background noise level.
74.   Submission of written certification from a suitably qualified person confirming that the noise
      levels from all mechanical equipment comply with the cause above when measured at either
      the residential boundary or outside the most exposed part of an affected building, whichever is
      the closest to the equipment.
      The assessment and certification is required immediately after installation of the equipment
      and prior to any occupation of the building, and in a format approved by Council. This
      assessment must take into account noise from any other fixed equipment on the property e.g.
      swimming pool pump, heating/cooling equipment, etc that may increase the overall noise level
      emitted.
      Advice: It is highly recommended that the person you engage to certify the installation Is
      involved at the plan development stage so they can recommend where this equipment is best
      located. They can also advise about noise enclosures and can make other suggestions to
      avoid noise problems. It is a lot more costly to try and deal with noise problems after
      everything is built.
75.   Noise from building works associated with residential development shall comply with the
      following -
      75.1.   Limited to between 7:00am to 6:30pm Monday to Saturday.
      75.2. All reasonable measures are taken to minimise noise emissions.
      75.3.   Not permitted on Sunday or public holidays.

E$    REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:


                                                                                   Page 12 of 19

Page 15

                                                                                          2006/1395



     Referral Trigger          I Referral Status    Referral Agency        Referral Address

     Site adjoins a declared     Advice             Department of          PO Box 5165
     fish habitat area                              Primary Industries &   NAMBOUR QLD 4560
                                                    Fisheries
A copy of any referral agency conditions is attached.

6         APPROVED PANSlDOUMENTS
The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.
37        ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
 1.       The applicant Is advised that development contributions and infrastructure charges applicable
          to this development approval have been based on the following Uses Class] Uses and
          applicable quantities:-

                        Existing Development                          Approved Development
            Existing Use Class                             Approved Use Class
                                                                                     Approved Quantity
                   /use                                          1 Use
                                                           Multiple housing -       10 x 3 bedroom
           Detached House          NIL (1 x Vacant Lot)
                                                           Type 4 Conventional      units
2.        The applicant is informed that approval of this development application will trigger an
          Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
          Charges Plan for the estimated amount of $18,997 and is subject to variations in the
          Consumer Price Index, All Groups Brisbane from June 2007 until the date of payment. An
          Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
          Planning Act 1997.
 3.       The applicant is informed that payment via credit card transaction will not be an acceptable
          method of payment for development contributions conditioned in this permit or for
          infrastructure charge notices issued separately.
4.        The applicant is advised that a Compliance Permit for all plumbing and drainage works within
          the boundaries of the development site shall be obtained from Council's Plumbing Services
          Section prior to obtaining a Development Permit for Building Works.
5.        Compliance with the Nature Conservation Act 1992 with regard to the clearing of native
          vegetation that provides habitat for rare, endangered or threatened fauna.
6.        Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
          the cost of operational works exceeds $80,000, then a portable long service leave levy is
          required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
          the approved form Issued by the Building and Construction Industry (Portable Long Service
          Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
          declaration outlining the cost of the operational works must be submitted to Council with the
          lodgement of any application for operational works over the site.




                                                                                       Page 13 of 19

Page 16

                                                                                           2006/1395


7.    The development should be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
      other emissions in accordance with the nuisance provisions of the Environmental Protection
      Regulation 1998 or Council's Local Law No. 12 -- Control of Nuisances.
8.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed
      where it could reasonably be expected to move into a roadside gutter, storm water drain or a
      watercourse. On the spot fines apply for such offences.
9.    Prior to the commencement of the development, a plumbing assessment must be obtained
      from Noosa Council's Plumbing Services Section in accordance with the Plumbing & Drainage
      Act 2002 (as applicable).
10.    No assessment has been carried out in regard to exits, the fire services, fire separation, fire
       resistance levels. The building certifier will assess these aspects as part of the building
       application.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: "A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage': It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 a PROPERTY NOTES
Not applicable
       PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable




                                                                                        Page 14 of 19

Page 17

                                                                                     2006/1395


         FURTHER DEVELOPMENT PERMITS REQUIRED

     Type of Development Permit required      Subject of the required Development Permit
     Development Permit for Building Works    All Building Works

     Development Permit for Operational       Landscaping, Carparking & Access, Site Civil Works,
     Works                                    Frontage Works, Stormwater Drainage, Sewer
                                              Reticulation (including new mains, relocations,
                                              diversions, pump stations & rising mains), Water
                                              Reticulation & Filling of Site

     Development Permit for Reconfiguring a   Creation of the park to be dedicated to the crown
     Lot                                      (with Council as, trustee) prior to issue of
                                              Development Permit for Operational Works

111       SELF ASSESSABLE CODES
Nil
          SUBMISSIONS
There were no properly made submissions about the application.
113       REASONS 1 GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
 Not applicable
 14       RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
 15       OTHER DETAILS
 Should you wish to obtain more Information about Council's decision electronic copies of Council's
 decision are available on line at www.sunshinecoast.old.cov.au, or at Council Offices.

 DECISION NOTICE HISTORY
 • Original Decision Notice issue 24 January
   2008.
 • Negotiated Decision Notice issued 15 May
   2008 with amendment to Conditions 1,,Z 15,
   16, 17, 27, 30, 34 &'66, deletion of Conditions
   27.4.2, 27.4.3, 27.5, 27.5.1, 27.5.2, 63 & 64.
 • Change to an Existing Approval issued 14
   July 2008 with amendment to Conditions 13 &
   34.

 Yours faithfully,



 Kerr! Coyle
 SENIOR PLANNING OFFICER

                                                                                  Page 15 of 19

Page 18

                                                                                                                           2006/1395



Sunshine
Regional Council
                 Coast                        Referral  Agency    Conditions   -
                                              Department of Primary Industries &
                                              Fisheries
                                               INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                                              0 Queensland
                                                                                  Government

                                                                                             Bapl.enear of
                                                                                             Pdmary Industdas and Fisheries
           Our Rsranonoe:66DEC1401e29
           Your Reference: RCU 2408

           12 December 2006

           Me J Smith
           A/Referral Coordination Officer
           Statutory Planning Branch
           Department of Local Government, Planning, Sport and Recreation
           PO Box 15031
           CITY EAST QLD 4002

           Dear Ms With

           Third Party-Advice - Proposed MCU -142 Noose Drive, Noose Heads

           I refer to your referral coordination of a proposed MCU of Lot 3 on SP126203 and Lot
           Easement b on SP126206 and Lot 2 on SP110327 at 142 Noose Drive, Noose
           Heads to the Department of Primary Industries and Fisheries (DPI&F) as a Third Part
           Advice Agency.

           DPI&F would not request any further information to assess this development.

           DPI&F consider that, with the implementation of the following general
           recommendations, the Impacts of the proposed development on fisheries interests
           will be minor provided:
           • Provision of a suitable buffer between development activities and any tidal or
               freshwater wetlands or waterways. Refer below for the DPI&F buffer
               recommendations-
           • Provision of appropriate management of Acid Sulfate Soils, stormwater runoff,
               and any other potential contaminant generated by the proposed development
               site; and
           • No direct Impacts are proposed upon tidal or freshwater wetlands or waterways.

           DPI&F would accept the 30 metres buffer proposed between the development
           activities and the level of Highest Astronomical Tides In Weybe Creek

           DPI&F would accept the recommendations of Council, Environmental Protection
           Agency and Department of Natural Resources and Water in relation to discharges,


            CC    Mr N Slamsy, Assessment Manager, Noose Shin Council,
                  Mr Craig Mathissn. Regional Director (South-111691), Department of Primary rndusirles and
                          Fisheries, PO Box 5165. SCMC, NAMBOUR OLD 4560

                                                                                             0 BHS r dwho Sa S
           Profitable primary                                                                  seerh R Ol g•x per Gly
           Industries for Queensland                                                         Po BITS owepoon on
                                                                                             ouamriea ISM Au•eek
           Maximise the economic                                                             cesamn 132527
           potential of Queensland                                                           wnnlu •xnxa2t5P0a.e.
           Pdmary Industries on a                                                            ABR 14757661050
           sustainable bests

                                                                                                                                   I
                                                                                                                        Page 16 of 19

Page 19

                                                                                                  2006/1395



    s
l

          stormwater management, water quality and ASS Issues. DPI&F recognises the
          responsibilities and expertise of these Agencies In these regards.

          DPI&F provides third party advice. as part of its delivery of the objectives of the
          Fisheries Act 1994. This third party advice aims to minimise the impacts of
          development on:
          • marine plant communities;
          • declared Fish Habitat Areas;
          • tidal and freshwater wetland and waterways;
          • fish movement; and
          • the lifecycle and food chain of fish.
              the community value of local, regional and state fisheries.

          Thank you for the opportunity to provide advice on this matter.

          Yours sincerely




        (:?79v,.y
          Habitat Manager (South)
          Fisheries and Aquaculture Industry Development




                                                                                                Page 17 of 19

Page 20

     Sunshine Coast                                 2011/12 Regional Strategy and Planning
     Council        Request to Change Existing Approval and/or Extension to Relevant Period


                                                                                                      Sustainable Planning Act 2009
 ALL questions MUST be completed unless the form indicates otherwise.
 This form must be submitted to Council accompanied by the applicable fee.
 Attach extra pages if there is insufficient space on the form.
 If Council was the Assessment Manager for the existing approval, and the approval was issued by the Court, then:
 (a) a request to change the development approval and/or conditions is made to the Court; and
 (b) a request to extend the relevant period for the approval is made to Council.
 All terms used on the form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation
 2009.


1. Details of person making the request
Full name - individual or company          JQ}N>^ '1'}I^j}^Atys                       ( -fit _Q,pQ^                                  is
Contact Name - for company                 SCOW S
Postal address          ?o 13ox 6380
Suburb                   "ARo0CA-fV0&&               e >0 ,
Business phone                7j 2             A/H phone
Email address                -. Gotogl      k2H^1I GkS• COMA. QV

2. Details of existing approval
Type of approval (please tick ALL applicable categories)             Which entity issued approval?
19/ Development Permit                                               19' Sunshine Coast Council
q Preliminary Approval                                               q    Other entity - please specify
q Compliance Permit
E Material Change of Use
     Reconfiguring a Lot
     Operational Works
     Building Works
     Plumbing or Drainage Works
10
     Compliance Certificate
q    Environmentally Relevant Activity
Application number/council reference              2-00 6          395                                   Date issued t5 5/2c.0'gb
Is the approval for a mobile and temporary ERA?                                         No              q Yes - complete below
Insert the name of each local government area in which the mobile and temporary ERA is proposed to operate/operating




Privacy
Council will use any personal information provided for the intended purpose only and for remaining in contact with you. Council is
authorised to collect this information in accordance with the Local Government Act 2009 and other Local Government Acts. Your
personal information is only accessed by persons authorised to do so. Your personal information is dealt with in accordance with
council's privacy policy.

www.sunshlnecoe "Willov.au I m dQsuunshinecoast.gld.gov.au I T O7 5475 7272 F 07 5475 7277
Locked Beg 72 Sunshine Coed Mail Centre Old 4500 I ABN 37 878 973 913

Caloundra office 1 omrah Avenue Caloundre Qld 4551 I Naroochydore ofrIce 11-13 Ocean Sheet Maroodrydore QId 4558
Nambour office Cnr Currie and Bury Streets Nambour Old 4580  Tewanttn oiflce9 Pelican Street Tewantin Qld 4585

1 of 4    2011112 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM401

Page 21

Y




    3. Nature of request (please tick ALL applicable categories)
    q    To change the development                q    To change the development                 " To extend the relevant period
         approval                                      conditions                                    before lapsing
    Please attach documentation outlining the detail of and the reasons and justification for the requested change or
    extension.


    4. Location of the premises
    Unit No.                      Street No 147-            -Street         N005N 1?K
    Suburb        1^(,I^S-Ej4T^rj




    5. Concurrance Agencies
    Was there one or more concurrence agencies involved in the original approval?                        0
                                                                                                    'D Yes-provide details below
    Note - Under s372 of the Sustainable Planning Act 2009 the person making the request is required to give a copy of this request to
    concurrence agencies.




    6. Pre-request response notice
    Has a pre-request response been given by a relevant entity (e.g. a concurrence agency) for this request?
                                                                     q Yes
    If yes, please attach a copy of the notice.


    7. Owner's consent
    Is the owner's consent required for this request?                        n


                                                                        q Yes- complete
                                                                                   ----------- -- either Table A or Table B below
    Note - If more than one owner of the land all owners' details are required




                                                                             Table A - owner's consent provided on fo Iff




    2 of 4     2011/12 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM401

Page 22

    0




NOTES: For question 7
Under section 371 of the Sustainable Planning Act 2009, if the person making the request is not the owner of the land to which the
approval relates, the request must be accompanied by the owner's consent.
However, owner's consent is not required if the approval:
-       relates to land the was acquisition land to which section 263(2)(d) of the Sustainable Planning Act 2009 applied when the
        application for the approval was made; or
-       is for building work or operational work for the supply of community infrastructure on land designated for the community
        infrastructure; or
-       the consent of the owner would not be required under section 263(1) of the Sustainable Planning Act 2009 if a development
        application were made for the requested change.
Also, owner's consent is not required if the Assessment Manager is satisfied that:
-       the number of owners of the land make it impractical to obtain owners' consent, and the requested change does not materially
        affect the owners' land; or
-       having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change
        does not materially affect the owner's land.


8. Does the request involve a State resource prescribed under the SustainablePlanning Regulation 2009,
Schedule 14?
    YNo                                                             0 Yes - complete below details
Nature of State owned resource:
Nature of Evidence required:
                                       -     -------
q Evidence of allocation of / entitlement to, the resource           q Evidence the chief executive has agreed to the request
Attach a copy of the evidence required above
NOTES: For question 8
Section 370(3) and (4) of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at
the time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be required to support
the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be
required under section 264(1).
Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require
the application to be supported by certain evidence prescribed under regulation. Schedule 14 of the Sustainable Planning Regulation
2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application.


9. Declaration of applicant
I/We, the applicant, declare that the above information is correct in all respects, at the time of lodgement of this
application with the Sunshine Coast Regional Council. Should any of the details given in relation to this application be
changed in the future, the applicants      I ad a the Sunshine Coast Regional Council in writing prior to any such change
being implemented.          \ i        .. \V^
Signature/s




3 of 4      2011/12 Regional Strategy and Planning Request to Change Existing Approval and/or Extension to Relevant Period FM401

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REQUEST FOR EXTENSION TO RELEVANT PERIOD- 132006.1395.03 (06_1395).pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.