Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Request For Extension To Relevant Period- 132006.1395.03 (06/1395)

of 22

Text shows just the words. Original shows the document exactly as it was published.

                                                                                      2006/1395


56.    Should the drainage via gravity not be possible a new arrangement will need to be negotiated
       with Noosa Council
57.    The sewer system is to be kept and maintained in a condition suitable for use and shall not
       cause adverse impacts on the environment.
Town Water Supply
58.    Connection to Council's water supply shall be generally in accordance with Plan H-SP-02
       drawn by Brian Burnett & Associates dated 2007.02.12 for Aqua Blue Noosa Sanctuary
       Development.
.59.   The site shall be connected to Council's town water supply and be constructed in accordance
       with Council's standards and requirements at no cost to Council.
60.    Each individual water connection to the water reticulation system shall extend to the property
       boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
61.    All water meters must be located in an easily assessable location to facilitate unhindered
       reading by Council and/or Council's contracted water meter readers, and Mt behind fences or
       locked gates.
62.    For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development
       shall be served by:
       62.1. A single Body Corporate water meter to measure the total water consumption (including
             fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
       62.2. Individual water meters to each tenement capable of being separately rated, and
       62.3. A fire service (fully testable single detector check with metered bypass), where
             applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
             reels).
Acid Sulfate Soils
63.    Deleted.
64.    Deleted.
Erosion and Sediment Control
65.    Any person acting on this permit shall prevent erosion and sediment export.from leaving the
       site. Site control measures such as silt fencing, controlled gravel access to the site and
       controlled disposal of waste, will be necessary.
       In this regard plans detailing the methods of controlling erosion and sediment are required to
       be submitted to the Council for approval prior to obtaining a Development Permit for
       Operational Works.
Contributions Towards Council Infrastructure
66.    Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
       upgrading various infrastructure at the rates applicable at the time of payment. An estimate
       only of the contribution amounts under the current Council policies and requirements is
       outlined in the table below:
        Contribution;Require;d For: -;                                               Amount:
        PSP16 - Sewerage Headworks Contributions                                     $25,204
        PSP17 - Water Supply Headworks Contributions                                 $36,670
        PSP20 - Pathway Trunk Network Contributions                                  $6,685


                                                                                    Page 9of19

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REQUEST FOR EXTENSION TO RELEVANT PERIOD- 132006.1395.03 (06_1395).pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.