32. Security in the form of a cash bond or trading bank guarantee to the sum of $30,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
33. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
34. The Development Permit lapses if the use has not happened by 16 May 2012, unless an
application to extend the currency is approved by Council.
35. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Services
36. The wall of the garage setback 300mm from the southern side boundary is to be maintenance
free as per Clause A6 of the Queensland Development Code (QDC) Part 12.
37. The combined height of the retaining walls and boundary fences must not exceed 2.0 metres
above natural ground.
Land Development
River Flooding
38. All habitable rooms proposed on site shall be constructed to comply with Council's Minimum
Floor Height requirements as defined in Council's Planning Scheme and on Council's Scheme
Maps at the time of issue of the Building Permit. In this regard a Minimum Floor Height of RL
2.8 (AHD) is required for all habitable rooms. These levels however are subject to change and
verification shall be made to Council's Land Development Section prior to obtaining a
Development Permit for Building Works.
Vehicle Access
39. The access driveway to serve Lot 3 on SP 126203 shall be constructed over reciprocal access
easements ASP126203 and BSP126203 generally in accordance with Fig 2.1 by Callaghan
and Toth dated 13th June 2007 and Plan no. 990605 by Ken Hicks and Associates dated
12/10/99 except where modified to facilitate the turning of garbage service vehicles.
40. The access driveway to serve Lot 3 on SP 126203 shall be designed and constructed so as to
allow a garbage service vehicle defined in "PSP9 Waste Management" as a AUSTROADS:
design single unit truck/bus (12.5m) to enter and leave the site in a forward direction.
41. The driveway shall be designed and constructed to Council's design standards and to grades
that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
grades that do not comply with AS2890.1-2004 and AS2890.2-1989, Council will require that
the driveway be removed and reconstructed to levels that do comply.
42. All vehicles shall enter and leave the site in a forward direction.
Carparking
43. Carparking shall be provided within as shown on drawing number TP-01 dated 17105/06 by
Foster Designs Pty Ltd Architects.
44. A minimum of 4 uncovered carpark spaces and 20 covered carpark spaces shall be provided
on site.
45. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
user class Al with allowance for vehicles to enter and leave the site in a forward gear and with
a minimum head clearance (headroom) at any point of 2.2m.
Page 7 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REQUEST FOR EXTENSION TO RELEVANT PERIOD- 132006.1395.03 (06/1395)Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.