Delegated Report - Code - Planning MCU22 0099
09 DA04 Sections, prepared by Skale Building Design 08.09.22
11 DA04 Shed floor and elevation plans, prepared by Skale 08.09.22
Building Design
Currency Period
3. This development approval lapses if the use has not happened by 3 November 2028, unless
an application to extend the currency period is approved by Council.
Secondary Dwelling
4. This approval allows for the use of the building for the purpose of a Dwelling House and
Secondary Dwelling in accordance with the administrative use definition of the Noosa Plan
2020.
Performance Bond
5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Ecological
6. The rehabilitation must be implemented in accordance with the Ecological Assessment
Report, prepared by Green Tape Solutions and dated 19 September 2022 prior to occupation
of the dwelling.
7. The rehabilitation works must be by a suitably qualified person, including the following
minimum specifications:
a. Landscape planting specifications in accordance with Landscaping Code and PSP 2
Landscaping;
b. A planting schedule of suitable locally occurring species, plant numbers and locations,
reflective of the Regional Ecosystem 12.3.1 & 12.3.2;
c. Control of all environmental weeds of the site in accordance with best industry practice
for environmental rehabilitation which does not result in bed or bank instability;
d. Avoid undesirable plant species identified in PSP2 Landscaping;
e. Planting densities must result in a stable channel over the long term and minimal potential
for pest plant species.
8. Existing trees on the site must be retained, unless an environmental weed.
Effluent Disposal
9. The development must be provided with an on-site waste water treatment and effluent
disposal system having a capacity suitable for the development and positioned generally in
accordance with the Effluent Disposal Report prepared by Global Testing and dated
21/03/2022 and Ecological Assessment Report Green Tape Solutions and dated 19
September 2022.
ENGINEERING
Approved Plans
10. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Page 12 of 14
Document Set ID: 22150094
Version: 4, Version Date: 03/11/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.