Development Application - Part 2 of 2 - Plans, Title Search and DTMR Letter - OPW13/0069

of 14

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
1"{




          6.   The owner is to ensure that the ship berthed at this structure must maintain sufficient
               under .keel clearance at all stages of tide. The ship must comply with any local
               restrictions placed on channel depths and draft restrictions.


          7.   Any ships and equipment you or your agent use must comply with the Transport
               Operations (Marine Safety)Act 1994,the’Transport Operations (Marine Safety)
               Regulation 2004 and the Transport Operations (MarinePollution) Act 1995.

          8.   Any ships using this structure must comply with the Transport Operations (Marine
               Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004.

          9.   Any ship.!!,oored at this pollt09~ !11lJSt n_9t impe~e the ~ fe n~vig_~tior:t of C?!h~r sI}Jp~_Qr   .’




               restrict safe access to or from neighbouring structures.


          10, Any ship berthed, moored or attached to the pontoon must not exceed the following
               sizes:
               .


                ..:.~.....




                             Wet Berth                              Dry Berth
               Length Overall            -   7       metres               N/A
               Beam           -          2.4         me.tres


          11. The contractor must construct the pontoon within two years from the date of approval. If
               construction is not completed, you will need additional or amended comments from the.
               Regional Harbour Master.

          Maritime Safety Queensland does not need to be further consulted if all of the above
          conditions are met.


          The above conditions must be incluqed in your application to the assessment manager,


          This agency will also forward a copy of this letter to the Assessment Manager.




          Yours sincerely




           c1~
      ~’"                                        .




          Captain Richard C Johnson
      .



          Regional Harbour Master (Brisbane)




                                                                                                         Page 2 of2

Used in these records

About this file

File size
9.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application - Part 2 of 2 - Plans, Title Search and DTMR Letter - OPW13_0069.pdf · 9.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.