Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application:
For all development applications, you must:
¢ complete this form (Application details - IDAS form 1)
* complete any other forms relevant to your application
° provide any mandatory supporting information identified on the forms as being required to accompany your
application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009. ,
Applicant details (note: the applicant is the person responsible for making the application and need ‘not be the
e jowner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)
- Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.
Names (individual or company name in full) [Noosa Jetty Builders
For companies, contact name Danny Reed
Postal address PO Box 299 Noosaville
Contact phone number 0408137526
Mobile number (non-mandatory)
@ Fax number (non-mandatory) 54743480
e-mai) address (non-mandatory) [email protected]
4. What is the nature of development proposed? (tick all applicable boxes)
(J material change of use of premises
{building work
C1 operational work Development Counter
[] reconfiguring a lot
28 MAY 2010
~~ Tewantin
Department of Infrastructure and Planning i Can , : : We
Government)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 12 pages
Page 2
CE]
et
2. What type of approval is being sought?
{X]_ development permit
C1 preliminary approval
[] both - provide details below -
3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?
] No
[Yes - complete table A and then go to question 5
4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)
Table B - street address/lot for the premises or street address/lot on pian for the land adjoining or adjacent to the
premises
Lot on plan
Street Address description ;
Local government area
Unit | Street Street name and official Post Lot No Plan type (e.g. Logan,Cairns)
No. | No. suburb/iocality name code “1 and plan no.
1 13 |Key Court 4565 |170 |N.218.58 | Sunshine coast regional
: _ [council
(1) Street address / lot on plan
— Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
— water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development i in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)
Coordinates (note: place each set of
coordinates in a separate row) Zone ; Datum Local government
Easting | Northing | Latitude {| Longitude reference area (If applicable)
(J GDA94
1 (] wess4
(J other
5. Total area of the premises on which the development is proposed (indicate hectares or m?)
608m2
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)
1 |house
7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)
Timber jetty
Application Details - IDAS form 1
Version 1.0 18 December 2009
Page 3
yy]
tao
8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)
(1 No
"Yes - complete either table D, table E or table F as applicable
Table D (note: do not complete this table if lodging the application on-line using Smart eDA)
Name of owner/s of the land = jBetty Lang
We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land % M Lowa —_
Date / 24 - & 1
Table E
@ Name of owner/s of the land
(1 The owner's written consent is attached or will be provided separately to the assessment manager
Table F
Name of owner/s of the land
oO By making this application, |; the applicant, declare that the owner has given written consent to the making of
the application. , :
9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)
ix] No (Yes - complete table G
@ 10. Identify if any of the following apply to the premises (tick applicable box/es)
{] adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
(__ onstrategic port land under the Transport Infrastructure Act 1994 - complete table |
CI _ ina tidal water area - complete table J
Table H Name of water body, watercourse or aquifer
4 {Noosa Sound
11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water, etc.) .
[XJNo [1 Yes - ensure the type, location and dimension of each easement is included in the plans submitted
Application Details - iDAS form 1
Version 1.0 18 December 2009
Page 4
Cy)
Cart
12. Does the proposal include new building work or operational work on the premises? (including any
services) :
[]No_ {XJ Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted
Page 5
s * 13. Is the:payment of a portable long service leave levy applicable to this application? (refer to the notes at the
‘8 end of this form for more information) .
DX] No -Go to question 15... CT] Yes
15. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009? . . ~
+
: " BNo cot s
.L] Yes - provide details below _
16. List below ail of the forms and supporting information that accompany this application. (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application, Note: this
question does not apply for applications made online using’ SmarteDA)” ",
_ |Method of lodgement to
Description of attachment or title of attachment assessment manager
6 . : eee coos tp ye
Po : 1 {form 6° , oo , . : over the counter
2 I|check list - a ,
17. Applicant's. declaration
&X By making this application, | declare that all information in this ‘application is true and correct (note: it is
, unlawful to provide false or misleading information). : .
a
@
Application Details - IDAS form 7
Version 1.0 18 December 2009
Page 6
Ei) QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if appficable) Date receipted . QlLeave Project [Amount form sighted by|Name of officer who Number paid ($) assessment —_isighted the form . : manager Description of the work Date paid The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This . form and all other required application materials should. be sent to your assessment manager and any referral agencies. . , Application Details - DAS form 1 Version 1.0 18 December 2009
Page 7
" : _ _ may , integrated|Development’'AssessmentiSystem, form ‘ 1) Dost oe . . we AED) fe i Building or operational work assessable against a planning scheme - IDAS form 6° (Sustainable Planning Act 2009 version 1.0 effective 18 December 2009) This form must be compteted for development applications for building works or operational work assessable against a planning scheme. You MUST complete ALL questions unless the form indicates otherwige. Incomplete forms. o} is i 1g fe necessary information and documentation will result in your application nol BY OPE KAR Eos x - r For alt development applications, you must: ‘© complete Applicant details - IDAS form 1 oe 3 28 MAY 2010 * complete any other forms relevant to your application : td ‘' e ntin Q : * provide any mandatory supporting information identified on the fofms as being oye: a accompany your application. : ) Ail terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning Regulation 2009. This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994. 1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es) building work - complete table A LJ operational work - complete table B Table A What is the nature of the building work made assessable in the planning scheme (e.g. building, repairing, altering, underpinning, moving or demolishing a building)? jetty What type of approval is being sought? (if you have indicated multiple works in the above question, please generate another Table A to detail each approval request) development permit ~_[] preliminary approval Are there any current approvals associated with this application? (e.g. material change of use) —X] No (}Yes - provide details below 2. What is the dollar value of the proposed building work? (inc GST, materials and labour)| $ 18,500 Department of Infrastructure and Planning pam Gin ni
Page 8
ABS 3. Confirm the following mandatory supporting information accompanies this application Confirmation of lodgement Method of fodgement ‘Ail applications for operational works site plans drawn to scale which show the following: e the location and site area of the land to which the application relates (relevant land) e the north point the boundaries of the relevant land the allotment layout showing existing lots, any proposed lots (including the dimensions of those lots), existing or proposed road reserves, (\confirmed | over the counter building envelopes and existing or proposed open space (note: numbering is required for all lots) je any existing or proposed easements on the relevant land and their function any access limitation strips * all existing and proposed roads and access points on the relevant land a statement about how the proposed development addresses the local government's planning schemes and any other planning documents []confirmed | over the counter relevant to the application Applications for operational works involving earthworks (filling and excavating) drawings showing: * existing and proposed contours * areas to be cut and filled e the location and level of any permanent survey marks or reference stations used as datum for the works (confirmed electronic @ the location of any proposed retaining walls on the relevant tand and their height the defined flood level (if applicable) the defined fili level (if applicable) Applications for operational works involving roadworks drawings showing: e existing and proposed contours « the centreline or construction fine showing chainages, bearings, offsets if the construction line is not the centreline of the road and all " intersection points e information for each curve including tangent point chainages and offsets, curve radii, arc length, tangent length, superelevation (if applicable) and curve widening (if applicable) e kerb lines including kerb radii (where not parallel to centreline) and tangent point changes (where not parailel to centreline) edge of pavement where kerb is not constructed L]confirmed position and extent of channelisation location and details of all traffic signs, guideposts, guardrail and other street furniture pavement markings including details on raised pavement markers catchpit, manhole and pipeline locations drainage details (if applicable) cross road drainage culverts (if applicable) concrete footpaths and cycle paths location and details for access points, ramps and invert’crossings changes in surfacing material Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 9
DO Confirmation of lodgement Method of lodgement Applications for operational works invoiving stormwater drainage drawings showing: existing and proposed contours / drainage locations, diameters and class of pipe, open drains and easements Liconfirmed e manhole location, chainage and offset or co-ordinates and inlet and outlet invert levels « inlet pit locations, chainage and offset or co-ordinates and invert and kerb levels Applications for operational works involving water reticulation’ drawings showing: © kerb lines or edge of pavement where kerb is not constructed ¢ location and levels of other utility services where affected by water reticulation works ® pipe diameter, type of pipe and pipe alignment ¢ water main. alignments ; Oo confirmed water supply pump station details (if applicable) ¢ minor reservoir details (if applicable) ® conduits ° location of valves and fire hydrants e location of house connections (if applicable) e location of bench marks and reference pegs Applications for operational works involving sewerage reticulation drawings showing: location of all existing and proposed services location of all house connection branches kerb lines or edge of pavement where kerb is not constructed chainages design sewer invert levels design top of manhole levels type of manhole and manhole cover pipe diameter, type of pipe and pipe alignment location of house connections (if applicable) sewer pump station details (if applicable) location of all existing and proposed sewer lines and manhole locations (confirmed Applications for operational works involving street tighting drawings showing: location of all light poles and service conduits focation of ail other cross road conduits type of wattage and lighting any traffic calming devices additional plans for roundabouts and major roads (if applicable) details of any variations to normal alignment details of fighting levels LI confirmed Building and operational work assessable against a planning scheme - IDAS form 6 Version 1.0 18 December 2009
Page 10
OHA
7
Confirmation
of lodgement
Method of lodgement
Applications for operational works involving public. utility services
drawings showing:
any existing light poles and power poles
any existing underground services
details of proposed services
alternation to existing services
LJconfirmed
Applications for operational works involving landscaping works
drawings showing:
the location of proposed plant species
a plant schedule indicating common and botanical names, pot sizes
and numbers of plants ,
planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and
garden edge
the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences
the proposed maintenance period
irrigation system details
{confirmed
Notes for completing this form:
This form can also be used for development applications for building works or operational works assessable
against the tand use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
mentioned, take it to mean the land use plan for the airport land.
Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.
OFFICE USE ONLY
Date Received Reference Numbers
The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
@ all other required application materials should be sent to your assessment manager and any referral agencies.
Building and operational work assessable against a planning scheme - IDAS form 6
Version 1.0 18 December 2009
Page 11
hie Berek ienyASSs-ssien yen ee :
Development assessment checklist - IDAS
checklist 1
{Sustainable Planning Act 2009, version 1.0 18 December 2009)
This checklist applies to the carrying out of development generally:
You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
+ whether you need to make a development application for the proposed development
* if a development application is required, the relevant IDAS forms you need to complete as part of your application
* whether you need to give a copy of your application to any referral agencies.
if your development involves a material change of use, reconfiguring a lot or operational works, it is recommended
that you complete Material change of use - IDAS checklist 2, Reconfi iguring alot - IDAS.checklist 3 or Operational
works -IDAS checklist 4, as applicable.
if you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
@ Department of Infrastructure and Planning's website at www.dip.qld.gov:au.
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009. 5
Part 1 - General questions
1.1 Have you received a referral agency response in relation to this proposed development prior to making
jan application?
{No
Cives | To assist you in preparing your application, completing Referral agency responses - IDAS checklist
6 is recommended
1.2 Do you wish the proposed development to be assessed against a superseded planning scheme?
& No
* You must complete Request to apply a superseded planning scheme - Sustainable Planning Act
OYes form 2 and give this notice to the relevant local government. If the local goverment agrees to
your request, details must be provided in Application details - IDAS form 1
1.3 Does the proposal involve removing quarry material from a watercourse or lake for which an allocation
notice is required under the Water Act 2000?
DX}No
Li yYes | \t is recommended that you complete part 2 of this checklist
1.4 Is any part of the proposed development intended to be carried out on a Queenstand heritage place under|
the Queensland Heritage Act 19927
BX] No
(1 Yes
It is recommended that you complete part 3 of this checklist
Government
Department of Infrastructure and Planning ‘Git Oe
a
Page 12
OA
1.5 Does the proposal involve development on a focal heritage place?
DJ No
Cy Yes |} It is recommended that you complete part 4 of this checklist
1.6 Does the proposal involve an environmentally relevant activity, other than an agricultural ERA, a mining
activity or a chapter 5A activity?
gq No
DlYes |- it is recommended that you complete part 5 of this checklist
1.7 ts any part of the development on strategic port land or airport tand (other than development for a
material change of use that is inconsistent with the land use plan for the strategic port land or airport land)
, {No
Dyes |- It is recommended that you complete part 6 of this checklist
’ [4.8 ts any part of the development on land below a high water mark within the limits of a port under the
| Transport Infrastructure Act 1994? _
>] No .
(Yes | Itis recommended that you complete part 7 of this checklist
1.9 Is any part of the premises designated for community infrastructure?
No
(Yes |} It is recommended that you complete part 8 of this checklist
1.10 Does the proposal invoive the establishment or expansion of a waste water disposal system?
—XJNo
[Yes | It is recommended that you complete part 9 of this checklist
1.11 Is the development on land that adjoins a declared fish habitat area under the Fisheries Act 1994?
KINo
Ol Yes |- [tis recommended that you complete part 10 of this checklist’
Privacy - please refer to your assessment manager for further details on the use of information recorded in
’ this checklist. ,
Disclaimer:
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this
checklist and provided as part of this process will be of assistance to you, it is provided on the basis that you will
not rely on the information without first making your own enquiries regarding the interpretation and application of
the applicable legislation to.your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to liability for
negligence) for errors or omissions of any kind or for any ioss (including direct and indirect losses), damage or
other consequence which may arise from your reliance on this procéss and the information contained on this
checklist.
Development application assessment checklist - IDAS checklist 1
Version 1.0 18 December 2009
Page 13
& “4rd LJ OFFICE USE ONLY Date received Reference numbers The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. Development application assessment checklist - IDAS checklist 1 Version 1.0 18 December 2009
Used in these records
10/0783 - Transport Type 5 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 495 KB (small file)
- File type
No other editions are linked here.