2019-12-16 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 DECEMBER 2019
Council’s Barrister advises that the above extract from the coastal engineering joint report
indicates that:
(a) should the applicant irrevocably confirm a willingness to carry out the development in
accordance with the findings in the joint report; and
(b) should conditions reflecting the Core Engineering designs be accepted as non-severable
from any approval;
The Council will not reasonably be able to successfully contend for refusal of the proposed
development.
On this basis, and given the applicant’s confirmed willingness to carry out the development in
accordance with the extensive geotechnical works proposed by coastal engineering experts, it is
recommended that Council seek to settle the matter subject to appropriate conditions, which
include the requirement for the structures to be built strictly in accordance with the requirements
of the joint report. This is in contrast to the usual development requirement that works be carried
out generally in accordance with the conditions of approval.
Previous Council Consideration
Ordinary Meeting Minutes, 20 December 2018, Item 1, Page 12
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 December 2018 regarding Application No. 51987.2951.01 to make
a minor change to an existing approval for additions to a detached house to include a swimming
pool, deck and other structures seaward of the coastal building line situated at 42 Seaview Tce,
Sunshine Beach and:
A. Refuse the change for the following reasons:
1. The proposal is in conflict with the assessment benchmarks of the State Planning
Policy as it proposes development in an Erosion Prone Area and Natural Hazard
Area.
2. Development seaward of the Coastal Building Line is contrary to the building
setbacks contained in the Planning Scheme and the setback provided under State
Code 8; Coastal Development and Tidal Works of the State development assessment
provisions.
3. Recent modelling carried out by the Council indicates significant erosion is likely to
occur in the future which may threaten life and property should the proposed
development proceed.
4. The proposal does not comply with the Planning Scheme in force at the time of the
original approval, given the extent of excavation and vegetation removal in a sand
dune area.
5. The proposal does not comply with the Natural Resources Overlay Code for Coastal
Protection as it has the potential to adversely impact on natural coastal processes.
6. Given the site is affected by the Coastal Building Line and is located in a highly
vulnerable erosion prone area, the proposed 6m setback is not sufficient to minimise
the risk of erosion.
7. The proposal does not comply with the Biodiversity Overlay Code as vegetation is
proposed to be removed within the Environmental Protection Overlay placing the
integrity and resilience of the foreshore at risk.
8. The proposal is contrary to the Overall Outcomes for the Eastern Beaches Locality as
it does not protect the dunal area and natural environment nor maintain the safety of
people and works.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 32 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.