Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Traffic Engineering Report

Attached to the e-mail MCU16/0066 & OPW16/0133 Traffic Reports (3 of 4).

of 47

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

development in the opening year. Should these industrial lots be developed to a higher traffic
generating use (than warehouse), it will be responsibility of that applicant to assess the impact
of use on the road network.

6.2.           Development Scenarios
TTM will assess the following scenarios:

         2009 AM and PM Base Case (for comparison purposes);
         2019 AM and PM Opening Year Base Case;
         2019 AM and PM Opening Year Development Case;
         2029 AM and PM Opening Year Base Case; and
         2029 AM and PM Opening Year Development Case.

Traffic volumes for the 2019 and 2029 future cases is shown in Appendix D.




Site: Lot 3 Taylor Court, Cooroy                                                              18
Reference: 16BRT0201
Log in to download the original file

Traffic Engineering Report.pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.