Original source · versioned page text
Traffic Engineering Report
Attached to the e-mail MCU16/0066 & OPW16/0133 Traffic Reports (3 of 4).
Original PDF page 19, section 1. The text section number identifies this passage in the reader.
development in the opening year. Should these industrial lots be developed to a higher traffic
generating use (than warehouse), it will be responsibility of that applicant to assess the impact
of use on the road network.
6.2. Development Scenarios
TTM will assess the following scenarios:
2009 AM and PM Base Case (for comparison purposes);
2019 AM and PM Opening Year Base Case;
2019 AM and PM Opening Year Development Case;
2029 AM and PM Opening Year Base Case; and
2029 AM and PM Opening Year Development Case.
Traffic volumes for the 2019 and 2029 future cases is shown in Appendix D.
Site: Lot 3 Taylor Court, Cooroy 18
Reference: 16BRT0201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.