Original source · versioned page text
Traffic Engineering Report
Attached to the e-mail MCU16/0066 & OPW16/0133 Traffic Reports (3 of 4).
Original PDF page 3, section 1. The text section number identifies this passage in the reader.
Contents
1. Introduction 5
1.1. Background 5
1.2. Scope 5
1.3. Site Location 6
1.4. Current Site Use 6
2. The Proposed Development 7
2.1. Development Profile 7
2.2. Access 7
2.3. Parking 7
3. Existing Transport Infrastructure 8
3.1. The Road Network 8
3.2. Transport and Land Use Planning 8
3.3. Public and Active Transport Facilities 9
4. Vehicle Parking Arrangements 10
4.1. Car Parking Supply 10
4.2. Motorcycle and Scooter Parking Supply 10
4.3. Car Park Layout 10
5. Historic Traffic Volumes 12
5.1. Peak Hour 12
5.2. Daily Traffic 13
5.3. Heavy Vehicle Percentage 13
6. Estimated Future Transport Demands 14
6.1. Future Traffic Volume Inputs 14
6.1.1. Growth Rates 14
6.1.2. Base Traffic Volumes 14
6.1.3. Design Years 14
6.1.4. Holts Road Industrial Estate Traffic 14
6.1.5. Development Traffic Volumes 15
6.1.6. Development Traffic Distribution 16
6.1.7. Heavy Vehicle Percentages 17
6.1.8. Summary of Traffic Inputs 17
6.2. Development Scenarios 18
7. Road Network Performance 19
7.1. Myall Street/Holts Road Intersection 19
Site: Lot 3 Taylor Court, Cooroy 2
Reference: 16BRT0201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.