Skip to the record
Search everything, all in one place.

Original source · versioned page text

Planning Report - Code MCU - 25-27 Toolar St Tewantin

of 45
         Sustainable Building Design Code
The proposed development complies with the overall outcomes of the Sustainable Building Design
Code. An assessment against the relevant performance outcomes of the Code are stated in Table 9
below to demonstrate how the development complies with the code requirements. Where a specific
outcome is not stated, it is not relevant to the application.

Table 9 Performance Outcomes for the Sustainable Building Design Code

      Performance Outcomes                           Acceptable Solutions                       Development Response
 Role and Function
 PO1                                         AO1                                           The proposed dwellings are being
 PO1                                         No acceptable outcome provided                designed to achieve a 6 star
 Development minimises energy                                                              energy rating.
 consumption and the production of
 greenhouse gas emissions.
 PO2                                         AO2.1                                         Rainwater tanks are provided to
 Development maximises water                 If for accommodation activities, a            each proposed dwelling.
 efficiency on site by incorporating         minimum 3,000 litres of rain water
 rainwater collection and reuse              storage is provided per dwelling and
 measures for non-potable purposes           reused for non-potable purposes
 such as irrigation.                         and incorporated into a stormwater
                                             management plan for the
                                             development.

                                             AO2.2
                                             With the exception
                                             of accommodation activities, rain
                                             water storage sufficient for the
                                             intended use is captured and used
                                             on-site for non-potable purposes
                                             and incorporated into a stormwater
                                             management plan for the
                                             development.

                                             Editor’s note—The Queensland
                                             Development Code includes
                                             provisions for the installation of rain
                                             water tanks and the reuse of
                                             stormwater.
 PO3                                         AO3.1                                         Over 40% of the site is soft
 Development reduces stormwater              Development incorporates water                landscaping to assist with
 run-off by minimising impervious            sensitive urban design measures to            minimising runoff.
 areas and                                   manage stormwater.
 maximising site vegetation to
 absorb water on site.                       AO3.2
                                             Development incorporates porous
                                             pavements on low trafficked areas
                                             such as footpaths and car parks.

                                             Note: Porous pavements are not
                                             considered landscaping and do not
                                             form part of the minimum landscape
                                             requirements.
 PO4                                         No acceptable outcome provided                Site cut and fill has been
 Development limits changes and                                                            minimised and is stepped to work
 disturbances to the site topography                                                       with the natural slope of the land.
 to preserve existing drainage
 channels as much as possible.
 PO5                                         No acceptable outcome provided                Hare surface areas are restricted
 Development minimises hard                                                                to areas required for vehicle
 surface areas that reflect or store


                                       Material Change of Use – Multiple Dwelling (Code Assessment)

Log in to download the original (Planning Report - Code MCU - 25-27 Toolar St Tewantin.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.