Planning Report - Code MCU - 25-27 Toolar St Tewantin
Sustainable Building Design Code
The proposed development complies with the overall outcomes of the Sustainable Building Design
Code. An assessment against the relevant performance outcomes of the Code are stated in Table 9
below to demonstrate how the development complies with the code requirements. Where a specific
outcome is not stated, it is not relevant to the application.
Table 9 Performance Outcomes for the Sustainable Building Design Code
Performance Outcomes Acceptable Solutions Development Response
Role and Function
PO1 AO1 The proposed dwellings are being
PO1 No acceptable outcome provided designed to achieve a 6 star
Development minimises energy energy rating.
consumption and the production of
greenhouse gas emissions.
PO2 AO2.1 Rainwater tanks are provided to
Development maximises water If for accommodation activities, a each proposed dwelling.
efficiency on site by incorporating minimum 3,000 litres of rain water
rainwater collection and reuse storage is provided per dwelling and
measures for non-potable purposes reused for non-potable purposes
such as irrigation. and incorporated into a stormwater
management plan for the
development.
AO2.2
With the exception
of accommodation activities, rain
water storage sufficient for the
intended use is captured and used
on-site for non-potable purposes
and incorporated into a stormwater
management plan for the
development.
Editor’s note—The Queensland
Development Code includes
provisions for the installation of rain
water tanks and the reuse of
stormwater.
PO3 AO3.1 Over 40% of the site is soft
Development reduces stormwater Development incorporates water landscaping to assist with
run-off by minimising impervious sensitive urban design measures to minimising runoff.
areas and manage stormwater.
maximising site vegetation to
absorb water on site. AO3.2
Development incorporates porous
pavements on low trafficked areas
such as footpaths and car parks.
Note: Porous pavements are not
considered landscaping and do not
form part of the minimum landscape
requirements.
PO4 No acceptable outcome provided Site cut and fill has been
Development limits changes and minimised and is stepped to work
disturbances to the site topography with the natural slope of the land.
to preserve existing drainage
channels as much as possible.
PO5 No acceptable outcome provided Hare surface areas are restricted
Development minimises hard to areas required for vehicle
surface areas that reflect or store
Material Change of Use – Multiple Dwelling (Code Assessment)
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Planning Report - Code MCU - 25-27 Toolar St Tewantin.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.