Council archive · source document
Att 3 - Site Based Management · MCU17/0020
Attached to the e-mail Development application - Aquaculture MCU17/0020.
In past trials we have found that the Giant Grouper fill the entire water column allowing us to have an average stocking density of 75 Kg/m3 with a maximum density of 100kg/m3. With past experience on other farms we have found that Barramundi can also be grown using the same stocking densities as the Giant Grouper. The stocking densities of the Cobia and Flowery Cod are unknown until we do our own trial on the stocking densities. Our experience with Gold spot cod which are similar in behaviour to the Flowery Cod has shown us that they can’t be grown at densities as high as Giant Grouper and Barramundi as they like to sit on the bottom of the tank which limits their stocking densities in tanks with low diameter to depth ratios like our grow tanks. Bribie Island research Centre lead scientists have told us they believe a maximum stocking density of 40kg/m3 should be achievable with the Cobia which is very low but they grow twice as fast as the other species so this means we can get 2 crops to 1 of the other species which should make up for the low achievable stocking densities. 3 Location Our proposed facility is located at 3 Sanders street, Noosaville Queensland. Our company currently secured a 5x5x5 lease on both sheds on the property. The property has town water supply, Single phase and 3 phase power supply and connection to municipal sewer. 4 Farming Methods and Aquaculture Equipment 4.1 Farming Method At our chosen site we will be operating a Hatchery and Recirculating Aquaculture System (RAS). The fish will be cultured in varying sized tanks. We will be turning the water over in the tanks 1.5 times an hour during feeding and 2 times an hour when feeding is completed. The effluent water from the grow tanks will go through a 60micron drum filter then flow into an aboveground sump. From the sump the water will be pumped through a Protein skimmer where ozone will be injected. The water from the protein skimmer will then enter a Moving Bed Bio Reactor (MBBR) containing a mixture of k1 Kaldness biomedia and the new mutag bio chip at a ratio of 1:1. The water will then flow into the sump where it will be pumped back to the grow tanks. A Denitrification tank will also be incorporated in the system. The Denitrification tank will draw raw water from the return pipe from the grow tanks. The Denitrification tank contains k1 Kaldness bio media and the water is pumped into the bottom of tank and flows up through the media and then flows out the top into a 200 ltr drum. From the drum the water is pumped up into the MBBR where any excess Nitrogen (N2) gas can be gassed off. Waste from the Protein skimmer will be used as the carbon donor for the de nitrification tank. This waste will be dosed into the de nitrification tank to keep the ORP between -50-+50 mv any excess waste from the protein skimmer will be pumped into the waste storage tank. Discharge water will be drawn from the return pipe from the grow tanks at a rate of 3500 litres per day. The drum filter will be washed using fresh water and will be discharged into the sewer in the early stages. In the early stages the total volume will only be 190000ltrs so we will use 4800ltrs of system water and 5200ltrs of water to wash the drum filter screens. As the system grows we will install 2 x 35000ltr settling tanks which will contain fresh water to wash down the drum filter screens. One tank will supply the water to clean the drum filter screens while the other tank is settling the solids out. When the solids are settled (after a 24hr period) the sludge
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Att 3 - Site Based Management.pdfRelated documentApplication case desk ↗
About this file
- File size
- 325 KB (small file)
- File type
No other editions are linked here.