Skip to the record
Search everything, all in one place.

Council archive · source document

PBA11/0046 Development Application Part 1 of 2 IDAS Application Form 1 & 6 & Checklist 33 Ross Crescent Sunshine Beach

of 12

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                              Confirmation
                                                                                             Method of lodgement
                                                                              of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
a   existing and proposed contours
a   drainage locations, diameters and class of pipe, open drains and
    easements                                                                 q confirmed
a   manhole location, chainage and offset or co-ordinates and inlet and
    outlet invert levels
a   inlet pit locations, chainage and offset or co-ordinates and invert and
    kerb levels
Applications for operational works involving water reticulation



drawings showing:
a kerb lines or edge of pavement where kerb is not constructed
a location and levels of other utility services where affected by water
    reticulation works
a   pipe diameter, type of pipe and pipe alignment
a   water main alignments
                                                                              q confirmed
a water supply pump station details (if applicable)
S   minor reservoir details (if applicable)
S conduits
a location of valves and fire hydrants
a location of house connections (if applicable)
A location of bench marks and reference pegs
Applications for operational works involving sewerage reticulation

drawings showing:
a location of all existing and proposed services
a location of all existing and proposed sewer lines and manhole locations
a location of all house connection branches
a kerb lines or edge of pavement where kerb is not constructed
a chainages
                                                                          []confirmed
a design sewer invert levels
a design top of manhole levels
a type of manhole and manhole cover
a pipe diameter, type of pipe and pipe alignment
a location of house connections (if applicable)
a sewer pump station details (if applicable)

Applications for operational works involving street lighting

drawings showing:
   location of all light poles and service conduits
   location of all other cross road conduits
    type of wattage and lighting
                                                                                confirmed
    any traffic calming devices
    additional plans for roundabouts and major roads (if applicable)
    details of any variations to normal alignment
    details of lighting levels


[OCR of page images]
 

 

 

Confirmation
of lodgement

 

Method of lodgement

 

Applications for operational works involving stormwater drainage

 

   
   

   
 

   

drawings showing:

4 existing and proposed contours

4 drainage locations, diameters and class of pipe, open drains and
easements (| confirmed
4 manhole location, chainage and offset or co-ordinates and inlet and
outlet invert levels

4 inlet pit locations, chainage and offset or co-ordinates and invert and
kerb levels

 

Applications for operational works involving water reticulation

 

drawings showing:

4 kerb lines or edge of pavement where kerb is not constructed

4 location and levels of other utility services where affected by water
reticulation works

pipe diameter, type of pipe and pipe alignment

water main alignments (J confirmed
water supply pump station details (if applicable)
minor reservoir details (if applicable)

conduits

location of valves and fire hydrants

location of house connections (if applicable)
location of bench marks and reference pegs

O» Gry GD» Gs Gr Gr Or Gr

 

Applications for operational works involving sewerage reticulation

 

drawings showing:
4 location of all existing and proposed services

location of all existing and proposed sewer lines and manhole locations
location of all house connection branches

kerb lines or edge of pavement where kerb is not constructed
chainages | {_Jeonfirmed
design sewer invert levels

design top of manhole levels

type of manhole and manhole cover

pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
sewer pump station details (if applicable)

ooo oS oo oo oD ©

 

Applications for operational works involving street lighting

 

drawings showing:
location of all light poles and service conduits

location of all other cross road conduits

type of wattage and lighting

any traffic calming devices

additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment

details of lighting levels

(_) confirmed

 

 

 

 

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

PBA11_0046 Development Application Part 1 of 2 IDAS Application Form 1 & 6 & Checklist 33 Ross Crescent Sunshine Beach.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.