Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Lot 8 Management Plan v1 - 30 Pottery St Pomona 2021

of 13
Lot 8 Bushfire Management Plan v1                                                      NCES REF: J000864
Lot 496 on MCH591 – 30 Pottery St, Pomona


3    BUSHFIRE IMPACT REDUCTION MEASURES

3.1 General
The following section describes bushfire impact reduction measures to be implemented to reduce
the risk of bushfire impacts to people and property. Implementation of the identified measures is not
implied nor intended to advocate that building occupants remain on the site during a bushfire event,
nor that people and property will be protected from bushfire impacts. The measures are intended to
reduce the potential severity of bushfire impact and not prevent bushfire impact. The bushfire
mitigation measures have been derived from:
    •    Department of State Development, Manufacturing, Infrastructure and Planning’s State
         Planning Policy – State interest guidance material – Natural hazards, risk and resilience –
         Bushfire (December 2019) (referenced herein as SPP (Bushfire) 2019); and
    •    Queensland Fire and Emergency Services. (2019). Planning for Bushfire Resilient
         Communities.

3.2 Asset Protection Zone
3.2.1    General
Asset Protection Zones (APZ) provide a defensive tool to assist in the reduction of potential bushfire
impact to people and property situated in bushfire prone areas. For illustrative purposes, Plate 4
depicts the concept of an APZ surrounding a dwelling in a bushfire prone areas.




                                            Plate 4 – Asset Protection Zones

Lot 8 has been confirmed to be located within a bushfire hazard area hence provision of adequate
separation between the building envelope flanking the western hazardous vegetation is required to
provide a reasonable level of safety to site occupants and emergency services staff.
Lot 8 has been provided with a minimum of 19m separation between the building envelope and the
VHC 9.1 open eucalypt forest, which is proposed to be protected within the conservation covenant
and contain a trafficable fire break for use by emergency services if required.

3.3 Vegetation management within the APZ
The prescribed APZ is required to be maintained as a low fuel zone that comprises only low threat
vegetation with minimal fuel conditions. Minimal fuel condition means there is insufficient fuel
available to significantly increase the severity of the bushfire attack, for example short-cropped grass
to a nominal height of 10 centimetres (i.e., regularly maintained lawns), dirt, gravel or discretely
arranged non- continuous cultivated gardens (e.g., vegetable/flower gardens - does not include
ornamental trees or shrubs).
The APZ within Lot 8 is to be maintained by the individual landholder/s and or occupants and is to
consist of low threat vegetation conditions in perpetuity. Responsibilities include the removal of
regrowth vegetation that naturally establishes within the APZ from adjoining seed sources and or
vegetative fallout (i.e., leaves, sticks, twigs and branches) that accumulates on the ground from
nearby trees and shrubs.



© 2021                                                  6

Log in to download the original (Lot 8 Management Plan v1 - 30 Pottery St Pomona 2021.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.