Original source · versioned page text
Cover Letter
2. THE DEVELOPMENT APPLICATION
Since approval, the applicant in conjunction with a number of future tenants, has proceeded to refine
the building which has resulted in minor changes to the internal layout. The applicant therefore
seeks Council approval to change the approved plans to those included in Attachment A.
The changes result in a more efficient building and include:
Overall
Reduced GFA - Approved GFA of 6391m2 reduced to 6362m2
Building moved northwards 800mm to allow for piling along southern boundary
Basement
Relocation of 10 bikes in basement level for use by visitors
New Medical Linear Accelerator (RADOC) Bunker to be excavated into site
Minor changes to layout
One carpark removed to create access to fire door for RADOC Bunker (2 new carparks
provided on level 1)
Ground Floor
Internal changes to tenancy layout
Extension to waste loading dock to allow for an enclosed wash bay and specialised storage
which results in reduced GFA
New fire stair and lift which results in loss of GFA
Void areas reduced at rear of building to compensate for loss of GFA and increase in
building efficiencies
Storage areas removed from carparking areas
Level 1
Internal changes to tenancy layout
Extension to waste loading dock which reduces GFA
Plant room moved to roof which provides for 2 additional carparking spaces
Store rooms removed from carpark
Balcony over loading bay reduced in width to increase height over loading bay
New lift and extension to fire stair which results in reduced GFA
Void areas reduced at rear of building to compensate for loss of GFA and increase in
building efficiencies
Level 2
Internal changes to tenancy layout
Void areas relocated to enable increased height of internal floor for operating theatre
equipment on level 1.
New roofing over rear carpark
New roof over walkway
Roof
New roof design to south to cater for relocated solar panels
Operable skylight removed due to energy rating issues
A Construction Methodolgy Plan prepared by Kane is included in Attachment B and details the
management and construction of the basement and retention works for the proposal.
Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original