Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Cover Letter

of 6

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

2. THE DEVELOPMENT APPLICATION
Since approval, the applicant in conjunction with a number of future tenants, has proceeded to refine
the building which has resulted in minor changes to the internal layout. The applicant therefore
seeks Council approval to change the approved plans to those included in Attachment A.

The changes result in a more efficient building and include:

Overall

         Reduced GFA - Approved GFA of 6391m2 reduced to 6362m2
         Building moved northwards 800mm to allow for piling along southern boundary

Basement

         Relocation of 10 bikes in basement level for use by visitors
         New Medical Linear Accelerator (RADOC) Bunker to be excavated into site
         Minor changes to layout
         One carpark removed to create access to fire door for RADOC Bunker (2 new carparks
          provided on level 1)

Ground Floor

         Internal changes to tenancy layout
         Extension to waste loading dock to allow for an enclosed wash bay and specialised storage
          which results in reduced GFA
         New fire stair and lift which results in loss of GFA
         Void areas reduced at rear of building to compensate for loss of GFA and increase in
          building efficiencies
         Storage areas removed from carparking areas

Level 1

         Internal changes to tenancy layout
         Extension to waste loading dock which reduces GFA
         Plant room moved to roof which provides for 2 additional carparking spaces
         Store rooms removed from carpark
         Balcony over loading bay reduced in width to increase height over loading bay
         New lift and extension to fire stair which results in reduced GFA
         Void areas reduced at rear of building to compensate for loss of GFA and increase in
          building efficiencies

Level 2

         Internal changes to tenancy layout
         Void areas relocated to enable increased height of internal floor for operating theatre
          equipment on level 1.
         New roofing over rear carpark
         New roof over walkway


Roof

         New roof design to south to cater for relocated solar panels
         Operable skylight removed due to energy rating issues


A Construction Methodolgy Plan prepared by Kane is included in Attachment B and details the
management and construction of the basement and retention works for the proposal.

                                                 Page 3
Log in to download the original file

Cover Letter.pdf · 829 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.