OPW12/0095 - Response to Further Information Request
C’-’._d; .I-J
VI/PRECISION ~
Of!!!l6iJ
r
w_
dFEP
rIllMl~lIJ~/JI1N
SUNSHINE COAST
URBAN CON 5 U L TAN T 5
Friday, 25 May 2012
M1717-202
Chief Executive Officer
Sunshine Coast Regional Council
liiii ii ~
80491163
Locked Bag 72
SUNSHINE COAST MC Q 4560
Att: Mr Mark Lewis
Re: Country Club Villages Pty Ltd
Noosa Domain Retirement Village, Noosaville
Council Reference: OPW12/0095
-
.Mark, Dear
. Reference is made to our IDAS Development Application for Operational Works associated with the above noted
~ works.
.
We acknowledge receipt of Council’s letter dated 09 May 2012 and provide additional information requested as
follows:
III due to the current real estate market engineering and construction works
1. Temporary construction access -
III have been put on hold by Country Club Villages pending further sales on Stage 1. We received advice from
Council on 05 November 2010 agreeing to future construction access off Eenie Creek Road
Council email attached to this response. The actual location of the access is dependent on several factors
-
refer to copy of
11111 including future staging which has not been finalised by Country Club Villages. We request Council condition
the approval to require all information as noted in the Information Request be provided and approved by
Council prior to commencement of future site works
2. Stormwater outlet between Units 12C/13B and 15B/16C preload (surcharge)for the external pedestrian link
I
-
has been in place for approximately fifteen months and settlement plate monitoring indicates that primary
settlement is nearly complete refer to JFP settlement plate monitoring survey plan attached. Golder
I
-
Associates will review and provide final advice on removal of preload (surcharge) material in the next few
months. We advise that preload (surcharge) for the external pedestrian link will be removed prior to
construction works between Units 12C/13B and 15B/16C commence
3. Car parking adjacent to the southern side of Road 6 -
preliminary car park plans have been prepared by Greg
Gibbs Architects -
refer to copy of plans attached to this response. Country Club Villages’ structural engineer
SCG Consulting Engineers will be preparing structural design drawings for these car parks. We advise that
these works do not form part of the civil engineering operational works approval being sought under this
application
The information provided above represents our response to all items contained in Council’s Request for Further
Information. We now request Council proceed with the IDAS process and provide Operational Works Approval to
the application as submitted.
-
~UIIO 1,0.......1 ~(r
..
i!! Pi:A BRISBANE SUNSHINE COAST CENTRAL QUEENSLAND
iiI URBAN DESIGNERS JFP House 237-239 Bradman Avenue, Maroochydore S9 Goondoon Street, Gladstone
76 Ernest Street, South Brisbane PO Box 6 Maroochydore Qld 4S58 PO Box 172 Gladstone Old 4680
1:11 SURVEYORS PO Box 3634 South Brisbane Qld 4101 P 07 S443 2500 F 07 S443 47S9 P 07 4972 2100 F 07 4972 5444
P 07 3844 7161 F 07 3846 19S9
rl ENGINEERS
III! LAN s PEARcHlTIcTS JFP URBAN CONSULTANTS PTY LTD ABN 79050414 04S MEMBERSHIPS UDIA, PCA, PIA, UDAL, SSSI , RPECQ, AILA WEBSITE WWW.lFP.COM.AU
[OCR of page images]
1p
ae vi TRECISION
TIONING
BUNBHINE COAST URBANCONSULTANTS
Friday, 25 May 2012
M1717-202
SCRC CORRESPONDENCE
Chief Executive Officer iM LN
Sunshine Coast Regional Council
B0491163
Locked Bag 72
SUNSHINE COAST MC Q 4560
Att: Mr Mark Lewis
Re: Country Club Villages Pty Ltd
Noosa Domain Retirement Village, Noosaville
Council Reference: OPW12/0095
Dear Mark,
Reference is made to our IDAS Development Application for Operational Works associated with the above noted
works.
We acknowledge receipt of Council’s letter dated 09 May 2012 and provide additional information requested as
follows:
1. Temporary construction access — due to the current real estate market engineering and construction works
have been put on hold by Country Club Villages pending further sales on Stage 1. We received advice from
Council on 05 November 2010 agreeing to future construction access off Eenie Creek Road — refer to copy of
Council email attached to this response. The actual location of the access is dependent on several factors
including future staging which has not been finalised by Country Club Villages. We request Council condition
the approval to require all information as noted in the Information Request be provided and approved by
Council prior to commencement of future site works
2. Stormwater outlet between Units 12C/13B and 15B/16C — preload (surcharge) for the external pedestrian link
has been in place for approximately fifteen months and settlement plate monitoring indicates that primary
settlement is nearly complete — refer to JFP settlement plate monitoring survey plan attached. Golder
Associates will review and provide final advice on removal of preload (surcharge) material in the next few
months. We advise that preload (surcharge) for the external pedestrian link will be removed prior to
construction works between Units 12C/13B and 15B/16C commence
3. Car parking adjacent to the southern side of Road 6 — preliminary car park plans have been prepared by Greg
Gibbs Architects — refer to copy of plans attached to this response. Country Club Villages’ structural engineer
SCG Consulting Engineers will be preparing structural design drawings for these car parks. We advise that
these works do not form part of the civil engineering operational works approval being sought under this
application
The information provided above represents our response to all items contained in Council’s Request for Further
Information. We now request Council proceed with the IDAS process and provide Operational Works Approval to
the application as submitted.
Li70 10 Me
PLANNERS BRISBANE SUNSHINE COAST CENTRAL QUEENSLAND
URBAN DESIGNERS JFP House 237-239 Bradman Avenue, Maroochydore 59 Goondoon Street, Gl: fone
SURVEYORS 25 Ernest Street south Brisbane PO Box 6 Maroochydore Qld 4558 PO Box 172 Gladstone Qld 4680
@ VE PO Box 3634 South Brisbane Qld 4101 P07 5443 2500 F 075443 4759 P07 4972 2100 F07 4972 5444
{@ ENcineers P07 3844 7161 F 07 3846 1959
MM) LANDscaPe ARCHITECTS JFP URBAN CONSULTANTS PTY LTD ABN 79 OSC 4 MEMBERSHIPS UDIA . PCA . PIA. UDAL . SSSI. RPECQ.. AILA WEBSITE WWW.JFP.COM.AL
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (OPW12_0095 - Response to Further Information Request.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.