SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 204, section 1. The text section number identifies this passage in the reader.

SITE MANAGEMENT RULES FOR ENVIRONMENTAL PROTECTION – ECOLOGICAL RESTORATION PLAN (ERP)                               B-2
       7.     No work is to be conducted outside of the designated work hours (ie.7.00am to 6.00 pm
              Monday to Saturday excluding Public Holidays) unless prior permission has been given in
              writing by Council.

       8.     No fires will be permitted on site. All personnel are to be aware of fire response procedures.

       9.     Any cultural heritage material uncovered is to be immediately reported to the ERP Contractor
              with no further works to be undertaken until clearance is given.

B) Site Access and parking

       1.     Access to working areas is to be by designated access paths/ roads only

       2.     Entrance to neighbouring private property will not be permitted unless appropriate authorisation
              is received.

       3.     Vehicles are to be parked in designated parking areas only – no vehicles are to be parked in
              neighbouring private property unless authorised or on nearby streets.

       4.     A maximum speed of 30kph will apply to vehicle movement within the site.

C) Vegetation protection

       1.     No protected vegetation within the designated Ecological Restoration Areas is to be damaged
              by personnel (including marking or blazing).

       2.     Protected vegetation within the Ecological Restoration Areas are not to be damaged (including
              making or blazing) unless authorised by theRestoration Ecologist.

       3.     The Habitat Protection fence around the Ecological Restoration Areas is not to be disturbed by
              site personnel.

       4.     Smoking by site personnel is not permitted.

D) Noise and Dust Control

       1.     Machinery operating on site is to have fully functioning mufflers.

       2.     Operating hours are to be adhered to.

       3.     Machinery is to be turned off when not in use.

       4.     Truck loads are to be covered when soil or similar materials are transported to or from the site.

       5.     Potentially dust generating activities are not to be conducted during high winds.

       6.     Any mechanical mulching is to be conducted in designated areas determined by the Restoration
              Ecologist (minimum of 20m from residential areas).




        S:\PROJECT MANAGEMENT\4.0 OVERALL DEVELOPMENT SITE\MANAGEMENT PLANS\EMP 3 (WBM OCEANICS).DOC 8/10/07 14:10
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.