SARA RFI - Ecological Assessment Report
Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 210, section 1. The text section number identifies this passage in the reader.
CONTENTS I
CONTENTS
Contents i
List of Figures iii
List of Tables iii
1 INTRODUCTION 1-1
1.1 Rationale for this Document 1-1
1.2 Relationship to other management Plans 1-3
1.3 Structure for Implementation of the EMP 1-8
1.4 Contract Agreement and Responsible Personnel 1-9
1.5 Training Requirement 1-12
1.6 Performance Criteria and Guidelines 1-12
1.7 Complaints Procedure 1-13
1.8 Incidents Procedure 1-14
1.9 Environmental Compliance Reporting 1-14
1.9.1 Construction Phase 1-14
1.9.2 Operations Phase 1-15
1.10 Monitoring, Review and Audit of EMP 1-15
1.11 Review 1-16
2 STATEMENT OF ENVIRONMENTAL VALUES AND CONSIDERATIONS 2-1
3 EMP DESIGN AND PRE-CONSTRUCTION 3-1
3.1 Element D.1: Design Factors for Site Water Management 3-1
3.2 Element D.2: Design Factors For Ecological Management Within RHD
Area 3-2
3.3 Element D.3: Pre-Construction Planning 3-3
4 EMP – CONSTRUCTION PHASE 4-1
4.1 Element C.1: Legislative Compliance 4-2
4.2 Element C.2: Vegetation Protection and Management 4-3
4.3 Element C.3: Fauna and Fauna Habitat and Aquatic Ecosystem
Protection 4-10
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.