SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 220, section 1. The text section number identifies this passage in the reader.

INTRODUCTION                                                                                                   1-8

        This EMP for the RHD area provides the overriding environmental values and principles to be
        protected and promoted through the development of this site. The EMP sets out, through individual
        elements, defined policies for implementation, monitoring and reporting, specifying responsibilities
        and the necessary corrective actions required. The other required management plans provide detailed,
        issue specific strategies to protect, maintain and enhance the sites environmental attributes.

1.3     Structure for Implementation of the EMP

        The developer (Settlers Cove Development Pty Ltd) will implement the EMP immediately following
        approval by Council. The management procedures will be applied by this company (or their
        representatives) throughout the design, construction and maintenance components and during the
        time up until the land is no longer under this company’s control (i.e. until the development is
        complete and the parcels of land are sold to any other party or transferred to Council). Obligations
        subsequent to the sale of land (particularly body corporate obligations) are described within the
        operational section of the EMP.

        This EMP aims to provide:
        •    evidence of practical and achievable plans for the management of the various facets of the project
             to ensure that environmental requirements are complied with, by producing an integrated
             planning framework for comprehensive monitoring and control of design, construction and
             operational impacts. Specific commitments on strategies and design standards to be employed are
             also given;
        •    a framework for authorities and the proponent to confirm compliance with policies and
             conditions; and
        •    evidence to the community that the project is being managed in an environmentally acceptable
             manner.

        The objectives of the EMP are to ensure:
        •    monitoring of current on-site and off-site conditions during the construction and operational -
             phases;
        •    amenity of existing and future residential areas are not adversely impacted by the proposed
             construction and operation of the development; and
        •    proposed environmental management strategies meet ecological sustainability targets for the
             social, economic and environmental aspects.

        Eighteen (18) elements have been established to deal with the likely issues to be managed as part of
        the detailed design, pre-construction and construction phases and six elements for the operational
        phases. Information for each element has been compiled to provide practical environmental
        management advice for minimising the environmental impacts of constructing and maintaining the
        various treatments.

        The structure of the EMP is outlined below (indentation reflects hierarchy). This format is in
        accordance with ISO 14000. An explanation of components within specific control plans is given in
        Table 1-1.


        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.