SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 222, section 1. The text section number identifies this passage in the reader.

INTRODUCTION                                                                                                    1-10
        It is proposed that this EMP will be attached to all tender documents provided to contractors and
        compliance with the EMP will be a condition of contract.

        The Principal Contractor will be required to appoint a Site Environmental Officer (SEO), with
        qualifications in environmental management and with relevant experience, to manage environmental
        issues during the construction phase. The SEO is to be delegated sufficient authority to ensure full
        compliance with the EMP. Key personnel proposed as part of the implementation of the EMP are set
        out in Table 1-2.
                                     Table 1-2          Project Positions and Responsibilities

        Project                              Position                 Appointed By           Responsibilities
        Phase

                                             Project Manager          Settlers Cove          Oversee design and
                                                                      Development Pty Ltd    reporting phase prior to
                                                                                             construction
        Pre-                                                                                 commencing to ensure
        Construction/Design                                                                  EMP provisions are
                                                                                             addressed (particularly
                                                                                             in specific design
                                                                                             components).

                                             Superintendent           Settlers Cove          Oversee construction
                                                                      Development Pty Ltd    phase. Ensures
                                                                      (or delegate)          Principal Contractor
                                                                                             complies with
                                                                                             environmental
                                                                                             requirements of EMP.

                                             Principal Contractor     Settlers Cove          Responsibility for on-
        Construction
                                                                      Development Pty Ltd    site implementation of
                                                                      (or delegate)          the EMP.

                                             Site Environmental       Principal Contractor   Ensures Principal
                                             Officer                                         Contractor and other
                                                                                             contractors comply with
                                                                                             environment and safety
                                                                                             requirements of EMP.




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.