Skip to the record
For the highest quality transcripts.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 235, section 1. The text section number identifies this passage in the reader.

EMP – CONSTRUCTION PHASE                                                                                    4-1


4       EMP – CONSTRUCTION PHASE
        This section of the EMP has been broken into the following elements:



                                                Legislative compliance (including compliance with
       4.1          Element C.1
                                                conditions)

       4.2          Element C.2                 Vegetation Protection and Management


       4.3          Element C.3                 Fauna, Fauna Habitat and Aquatic Ecosystem Protection)


       4.4          Element C.4                 Weed and Pest Control Plan

                                                Soil Erosion and Sediment Control Plan and Stormwater and
       4.5          Element C.5
                                                Water Quality Management Plan

       4.6          Element C.6                 Air Quality Management


       4.7          Element C. 7                Noise and Vibration Management


       4.8          Element C.8                 Waste Management


       4.9          Element C.9                 General and Visual Amenity Protection


       4.10         Element C.10                Bushfire Control


       4.11         Element C.11                Cultural Heritage Management


       4.12         Element C.12                Community Liaison and Feedback

                                                Construction Management Plan (including Traffic
       4.13         Element C.13
                                                Management Plan)

       4.14         Element C.14                Acid Sulphate Soils Management Plan


       4.15         Element C.15                Storage & Handling of Hazardous Substances




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.