SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 252, section 1. The text section number identifies this passage in the reader.

EMP – CONSTRUCTION PHASE                                                                                    4-18

       Strategy:            To manage the quality of surface water runoff and infiltration and prevent
                            uncontrolled discharges of low quality waters into adjacent watercourses and
                            water bodies and underlying aquifer during the construction phase.

             •     At least two events per year are to be sampled based on significant rainfall events.
             •     Monitoring will be undertaken at all defined locations as indicated.

        Reporting: The Principal Contractor will prepare monthly Environmental Compliance Reports
        (ECR). Water quality data from previous months monitoring will be provided by the designated
        water quality monitoring consultant (via the Superintendent) to the SEO. The ECR’s will include at
        least the following:
             •     Monitoring that has been undertaken (i.e. event and campaign water quality monitoring);
             •     Compliance with standards;
             •     Incidents, accidents and complaints; and
             •     Problems, remedial actions undertaken and the outcomes of those actions; and Plan updates.

        Corrective Action:
        1.    Corrective action shall occur when a non-compliance with water quality criteria has been
              identified.
        2.    Any discharges should cease immediately and not recommence until water quality criteria can be
              met.
        3.    The Superintendent and Council are to be notified of any incidents immediately (see Section
              1.8).
        4.    Corrective action can involve improvement of controls, increased detention time and treatment of
              detained water.

4.6     Element C.6: Air Quality Management
        Policy:            To control dust and odour emissions and other contaminants during the construction
                           phase. (refer EP Act, EPP for Air and Regulations).



       Strategy:           To minimise and control dust and odour emissions.

       Responsibility: Site Environmental Officer and Principal Contractor.

       Management Actions:
        1.    Significant dust generating activities will be limited during unfavourable weather conditions (eg.
              high winds).
        2.    Residents of Serenity Close are to be notified (by letter box drop or phone call) 3 days prior to
              the commencement of work.
        3.    Dust generated from construction areas will be controlled by watering by water truck.



        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.