Skip to the record
For the highest quality transcripts.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 255, section 1. The text section number identifies this passage in the reader.

EMP – CONSTRUCTION PHASE                                                                                     4-21

       Strategy:            Minimise noise and vibration impacts during the construction phase.



        Corrective Action:
        •     Take action to reduce noise emission from equipment if monitoring confirms noise level in
              excess of legislative requirements.
        •     Noise monitoring to be conducted in accordance with EPA guidelines.
        •     Limit the hours of activities causing vibration or implement appropriate procedures for material
              damage prevention if required.

4.8     Element C.8: Waste Management
       Policy:             To manage waste in accordance with the waste management hierarchy outlined in the
                           Environmental Protection (Waste Management) Policy 2000:
                           •     waste avoidance
                           •     waste re-use
                           •     waste recycling
                           •    energy recovery from waste
                           •     waste disposal.
                           To dispose of cleared vegetation appropriately.(refer Condition 21.3, EP Act and EPP
                           for waste, NSC trade waste policy)

       Strategy:           Ensure the appropriate disposal of solid and liquid waste.



       Responsibility: Site Environmental Officer and Principal.

       Contractor Management Actions:
        1.    Order only the amount of construction materials needed for the construction work. Designs and
              specifications should minimise the wastage of materials and energy.
        2.    Building materials are to be located within the site area and not placed in a position that may
              result in materials being washed onto the roadway or into the stormwater system or protected
              habitat areas.
              No material is to be located within the drip line of retained trees.
        3.    All construction sheds, skip bins, temporary water supply points, toilets, spoil, etc., shall be kept
              within the property. No vehicles, skips or machines shall be permitted to stand on Council’s
              footpath.
        4.    No burning of waste materials is to occur on site. All green waste (except weeds) is to be
              mulched/chipped either on site for reuse where the source materials are suitable for on-site
              `reuse. For all unsuitable materials, including declared and other environmental weeds, green


        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.