Skip to the record
Accept no substitutions.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 257, section 1. The text section number identifies this passage in the reader.

EMP – CONSTRUCTION PHASE                                                                                   4-23

       Strategy:           To ensure that all cleared vegetation is disposed of in a suitable manner.



       Responsibility: Site Environmental Officer and Principal Contractor.

       Management Actions:

       Element C.2 and Appendix C presents the Vegetation Retention and Clearing Strategy which includes
       issues of relevance to this element.
        1.    Disposal of vegetation to be in accordance with Council policy and any relevant permits.
        2.    Where vegetation is removed, the material (except weeds) will be chipped and mulched for use
              in landscaping on-site or off-site or disposed of at a landfill which accepts green waste.
        3.    In accordance with Council conditions, vegetation disposal methods will not include the burning
              off of vegetative matter.
        4.    Where practical, any suitable habitat trees (hollow logs) identified by the Wildlife Ecologist prior
              to clearing, will be collected for redistribution in conservation areas of the site (refer Element
              C.2).
        5.    To avoid contamination of potential mulch material for revegetation and landscaping, the
              Contractor shall separate native and non-native/weed species into different stockpiles as far as is
              practicable. Non-native vegetation shall not be mulched for re-use on site, to minimise the risk of
              propagation and consequent contamination of landscaping/revegetation material. This material is
              to be disposed of at an approved Council facility.
        6.    Element C.4 (Weed Management) outlines measures for weed control.

       Performance Requirement: To ensure that best practice is used in the disposal of all cleared
       vegetation from the development. All vegetative waste appropriately disposed of as described above.

       Monitoring: Site inspections carried out during any clearing operations to ensure compliance with
       management actions.

       Reporting: Site Environmental Officer to include comments within monthly report provided to the
       Superintendent.

       Corrective Action: Inappropriate disposal of vegetation to be ceased immediately and management
       practices detailed above to be implemented forthwith.




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.