EMP – CONSTRUCTION PHASE                                                                                 4-29

       Strategy:           To ensure all measures are taken to prevent unnecessary accidents involving
                           Employees or the public in the vicinity of the construction site and to minimise
                           nuisance to residents living around and adjacent to the construction site.

        3.    A dilapidation study (including photographs) shall be made of Grant Street and Serenity Close
              prior to and at the completion of construction works. This study should be submitted to Council
              at the pre-start meeting.

       Road Closures

        1.    Prior to any temporary full or partial road closures the principal contractor shall make
              application to Council and/or Queensland Police for relevant approvals. Such applications shall
              include the detailed traffic management plan. Closures shall not take place until such a time as
              all relevant approvals are gained and conditions complied with.

        2.    During any temporary full or partial road closures the Principal Contractor shall employ
              appropriately qualified traffic control personnel to implement approved traffic control measures.

        3.    Any affected residents shall be notified in writing a minimum of 24 hours prior to any temporary
              full or partial road closures in accordance with this EMP and traffic management plan.

       Carparking

        1.    All Contractors, subcontractors and their employees shall park private vehicles within the
              construction areas as shown on approved drawing as advised by the Superintendent (see Element
              D.3).

        2.    Parking within Habitat Protection Areas is forbidden.

        3.    Parking along Banksia Avenue and Serenity Close (existing formation) is not permitted.

        4.    Temporary carpark areas shall be lined and bunded in accordance with Element C.5 of this EMP.

        Construction Sequence

        The construction sequence that will apply to the Principal Contractor for the RHD area is described in
        the following table.




        G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.