OPERATIONAL PHASE 5-5
Maintenance Procedures – Swales
One of the most important maintenance requirements of swales is to ensure that strong healthy
vegetation growth is promoted and retained. Other components of the system that will require regular
monitoring include the swale function itself and any subsurface drainage (including infiltration pits).
The most intensive maintenance period of swales will be during the plant establishment phase. This is
generally within the first two years after construction and planting. The plant establishment period is
also usually when there is greater potential for excess sediment loads to impact upon plant growth
due to sediment movement from building sites (where erosion and sediment control measures are not
fully effective).
Minimum swale inspections shall be conducted monthly during spring and summer with further
monitoring required after major storm events (i.e. > 25mm in 1 hour or greater than 50mm/day).
Inspections during autumn and winter shall be conducted every 2 months.
Appropriate maintenance shall follow inspections to restore the swale performance if any of the
following conditions are evident.
Typical Swale Maintenance Checklist (Refer to Maintenance Checklist overleaf to be used at each
inspection).
Inspection Item Action if Required
Gross pollutants – litter & debris Collect, remove & deposit at Council landfill
Sediment deposits / accumulation Excavate either by hand or using mechanical
means and deposit in accordance with Council
procedures. Ensure that any areas of disturbed
vegetation are reinstated in accordance with the
original design and consistent with other
vegetation in the swale
Evidence of erosion ie.scour, rilling etc. Restablish swale profile and revegetate. In areas
where erosion continues to reoccur, suitable
armouring (rock, reinforced turf etc) will need to
be investigated
Ponding Ensure swale grade is consistent with original
design and re-establish where deficient. If
reoccurrence occurs, consider installation of
subsurface drainage in problem areas.
Weed growth Remove weeds via manual methods
Vegetation condition - health & density Replace diseased or dead plants with approved
species. Investigate causes if reoccurrence is
noted.
Grass condition Mow during dry conditions. Note thataeration of
the soil may be required if grass condition
deteriorates over time.
Damage or vandalism Repair and/or reinstate as required
Other or repeated occurrence of above Report, determine cause & rectify
Note: No fertilising or herbicide applications during establishment or during maintenance
G:\ADMIN\B15184.G.DAH\R.B15184.001.05..DOC 22/7/05 10:07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.