Skip to the record
Accept no substitutions.

Original source · versioned page text

SARA RFI - Ecological Assessment Report

of 435

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (67.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 334, section 1. The text section number identifies this passage in the reader.

SETTLERS COVE NOOSA
Landscape Master Plan

 

Minimum swale inspections shall be conducted monthly during spring and summer with
further monitoring required after major storm events (ie. > 25mm rain in 1 hour).
Inspections during autumn and winter shall be conducted ever 2 months.

Appropriate maintenance shall follow inspections to restore the swale performance if any

of the following conditions are evident.

Typical Swale Maintenance Checklist (Refer to Environmental Management Plans for
detailed Maintenance Checklist to be used at each inspection).

 

Inspection Item

.| Action if Required

 

Gross pollutants — litter & debris

Collect, remove & deposit at Council landfill.

 

Sediment deposits / accumulation

Excavate either by hand or using mechanical
means and deposit in accordance with
Council procedures. Ensure that any areas of
disturb vegetation are reinstated in
accordance with original design and
consistent with other vegetation in swale.

 

Evidence of erosion ie.scour, rilling etc.

Re-establish swale profile and revegetate. In
areas where erosion continues to occur,
suitable armouring (rock, reinforced turf etc.)
will need to be investigated.

 

 

Ponding Ensure swale grade is consistent with original
design and re-establish where deficient. If
reoccurrence occurs, consider installation of
subsurface drainage in problem areas.

Weed growth Remove weeds via manual! methods.

 

Vegetation condition - health & density

Replace dead & diseased plants with -
approved species. Investigate causes if
reoccurrence is noted.

 

Grass condition

Mow during dry conditions — Note that
aeration of the soil may be required if grass
condition deteriorates over time.

 

Damage or vandalism

Repair and or reinstate as required.

 

 

Other or repeated occurrence of above

 

Report, determine cause & rectify.

 

Note: No fertilising or herbicide applications during establishment or during
maintenance of swales as this will impact upon their water quality improvement
function in swales. Photographs of swale elements requiring remediation should
be taken prior to and following corrective actions.

Maintenance of subsurface drainage shall be in accordance with stormwater
management guidelines as described in the Environmental Management Plans.

 

LandGraphics Maroochydore
Landscape Architects and Environmental Planners

04.05.2005
PAGE 35

 
Log in to download the original file

SARA RFI - Ecological Assessment Report.pdf · 67.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.