11. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the maximum
allowable building height as required by either the conditions of approval or the Planning
Scheme.
Operating Hours & Deliveries
12. The restaurants and bar are to operate between the hours of 6am and 12pm only.
13. Business deliveries are to be undertaken between the hours of 6am to 7pm Monday to
Saturday and 8am to 5pm Sunday only.
14. Service vehicles shall not attend the site outside the hours of 8am to 5pm.
Vegetation
15. Existing trees on the site and within road reserves are to be retained except where required to
be removed due to building operations, requirements of the approved Settler’s Cove
Management Plans or the conduct of the approved use.
16. The Koala and Glossy Black Cockatoo habitat trees identified for retention on plan L-SD-1.01
(Rev. A) dated August 2009 by DBI Design Pty Ltd shall be retained.
17. The existing Koala and Glossy Black Cockatoo habitat trees and any other trees within
setback and open space areas to be retained must be protected. As building works are likely
to impact the trees’ root zones, a qualified Arborist (having a minimum Diploma of
Arboriculture or ISA certification and a minimum of three years’ field experience) must be
contracted to prepare a Tree Management and Protection plan and shall:
a. oversee installation of a hard temporary protection zone prior to commencement of
works with ‘no go’ signage in accordance with AS 4970-2009. All site workers must be
inducted in relation to the tree protection;
b. supervise any works within the temporary protection zone;
c. undertake hazard reduction and formative pruning as necessary; &
d. provide certification that the trees were protected in accordance with the Arborist’s
recommendations.
The Tree Management and Protection Plan Shall be presented prior to or at the pre-start
meeting for the site.
The Arborist shall monitor the health and structural integrity of the trees to be retained at least
monthly during the construction period and quarterly for 12 months after construction is
completed. The developer shall rectify any decline in the health or structural integrity of the
trees, in accordance with the Arborist’s recommendations.
18. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
a. Re-use for building materials.
b. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
c. Disposal for firewood.
d. Disposal for landscaping purposes.
e. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
Page 3 of 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.