Council archive · source document
000A88A4.131.tif · 132003.221037
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
11.9 q Cardnoa DABK CONCLUSIONS The following conclusions can be made from the various investigations carried out. 1. 10. 41. 12. 13. 14. The soil profile of the site will not present any problems during the construction phase as it is anticipated that earthworks/excavations will be kept to a minimum. A slope analysis has shown that there are minimal areas with grade/slope greater than 20% with development largely occurring in areas ranging between 5-15 %. itis envisaged that the proposed deveiopment will not create traffic problems. The topography of the site wiil assist in the design of a sewerage reticulation system for the eco-cabins as the eastern precinct generally falls towards the north eastern corner. The wesiern area of the proposed development will be serviced by a reticulation system that will gravitate towards a pump station to be located on the north-eastern corner of the precinct. A rising main will deliver the sewage flows from this area to the gravity system in the eastern precinct and eventually transport sewage through the reticulation system to the proposed treatment plant. An equivalent population analysis has shown that approximately 250 EP will be created from this development. Preliminary sizing of the proposed treatment plant will be 350 EPs. MEDLI modelling has indicated.that an area of 6.5 ha is required for effluent disposal. ft is proposed to achieve this by using the wastewater for irrigation and for. toilet flushing for the lodge, interpretive centre and café. . The majority of the water supply demand will be serviced through a network of individual rainwater tanks (established at each eco-cabin and other main buildings). The intent is to utilise groundwater for “topping” purposes only thereby maximising the rainwater yield and minimising the dependency on groundwater. An average of approximately 180 L/day can be collected from the proposed rainwater tanks. This amount can be expected with a probability of failure of 1% or 3.65 days per year. Groundwater testing has reveaied that sufficient groundwater can be extracted to service the expected average day water demand for this proposed development. An optimal combination of rainwater and groundwater supply will be devised through the development of a water network analysis model. The AQUALM analysis indicated that the expected pollutant exports from the proposed development can be reduced to sustainable loads by the implemeniation of appropriate stormwater quality treatment measures. These measures comprise the use of filter strips/swales in the East Visitor Precinct and the use of bio-retention systems followed by treatment within the proposed lake at the West Visitor Precinct. The AQUALM analysis also. indicated that there is sufficient runoff in the West Visitor Precinct to maintain a functional body of water within the lake, provided infiltration losses are minimal. Given the size of the catchments and the topography of the land, it is envisaged that there will be no flooding issues associated with the development of the land. PETRAC LAND HOLDINGS P/L Noosa North Shore Eco-Tourism Portal September 2003 LA7296-03\Reporf\FINAL REPORT - 18Sept03.doc. Commercial in Confidence Page 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.131.tifRelated documentApplication case desk ↗
About this file
- File size
- 64 KB (small file)
- File type
- TIF
No other editions are linked here.