            4th May 2023

            SARA Ref:        2301-33112 SRA
            Council Ref:     MCU23/0007 & RAL23/001



            Attention:       Paul Gleeson

            Dear Mr Gleeson,

                    Re:      SARA Advice Notice
                    At:      45 & 47A Maple Street, and 9 Myall Street, Cooroy 4563

            With reference to the abovementioned development application and the subsequent
            advice notice from SARA, we have prepared a response to the engineering matters raised
            as follows.

            Issue: Stormwater
            1. To ensure compliance with PO8-PO114 of State code 1, provide an amended stormwater
            management plan, or other material, that demonstrates how stormwater will be managed,
            including any external catchments, to achieve a no material worsening impact onto the
            State-controlled road..

            The stormwater management has been updated to include the external catchments which
            may impact on flows towards the lawful point of discharge. As flows external to the site are
            not modified as a result of the development, no mitigation of these flows through the
            onsite rainwater detention tanks is warranted however some mitigation will occur as the
            run-off is drained through the proposed bioretention area prior to discharge from the site.

            The stormwater strategy ensures that the proposed site discharges do not exceed the
            pre-development peak flow rates in Myall Street and typically result in a significant
            improvement over existing flow rates. The development will not result in a material
            worsening impact to the state-controlled road as required by State Code 1.

            We believe that the above satisfactorily addresses the matters raised in the above
            information request however, should additional information be required, please contact
            our office directly.

            Yours faithfully,
            RECOR Pty Ltd

            Prepared by



            Ben Parry
            Civil Engineer
            BEng (Hons), MIEAust CPEng NER RPEQ
            RPEQ: 28084



P +61 7 5211 1003          A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]   recorconsulting.com

Log in to download the original (20230504 SARA response.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.