Decision Notice OPW25 0021 · OPW25/0021
Plan No. Rev. Plan/Document Name Date
24191 B “Site Plan & Schedules” 30 January 2025
Sheet 1 of 2 Prepared by Millwell Services
24191 B “Existing & Proposed LV Geographics” 30 January 2025
Sheet 2 of 2 Prepared by Millwell Services
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 10 March 2027, unless an application to extend the currency period
is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. All necessary approvals from external service providers (e.g., Energex) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
4. A condition report including photographs of the frontage of the site must be completed and
submitted to council prior to the prestart meeting.
5. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
6. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Electrical reticulation works.
7. A Construction Management Plan must be submitted prior to the prestart meeting and must
address the following:
a. Traffic management during all phases of construction;
b. Adequate parking arrangements for works and deliveries;
c. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
d. provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
8. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
9. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
10. All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
who is independent of the Developer and Principal Contractor, and they must certify that all
works conform to the Operational Works permit. Where municipal works are involved, such
confirmation must be submitted for the respective hold points prior to any site inspection by
Council Officers.
11. All works must be constructed and work procedure undertaken in accordance with:
Page 2 of 7
Document Set ID: 23621660
Version: 2, Version Date: 07/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice OPW25 0021.pdfRelated documentApplication case desk ↗
About this file
- File size
- 153 KB (small file)
- File type
No other editions are linked here.