09/1270 - MCU - Detached House [As Published] · 132009.1270
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1.3 March 2008
lAppticant
details
if the applicant is a company or organisation, a contac! person must be nominated. The applicant's signature is not required to be provided
under the IPA.
[Details of
the premises
The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land {whether or not a building or other
Structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over ot under the land.
Details of the fand are not required if the application involves a mobile and temporary Environmentally Relevant Activily only. instead Complete
Table A.
The premises may be identified in a number of ways --
« Street address and !ot on plan are most common and will apply to most applicalions.
+ Coordinales may provide the best means of accurately identifying the location of development proposed in walers, or on a relatively small
development sile distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and ottver
(specified) datum such as Zone Reference or GS84 may be provided.
The definition of ‘water body’ and ‘watercourse’ can vary Irom Act to Aci.
SirategicPortLaadis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to iDAS Gute 1i (Development on
Strategic por land) and the Queensland Transport (Ports) website.
“Tidal water’ is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and far strategic
port land is defined in the IPA (schedule 10}. Generally. the area below ‘high-water mark’ (defined by the Coastal Act in relation to high) water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local government's area unless
provided for under the Local Government Act 1993. Unless otherwise provided for by legislation, a local government has No jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant pon authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives loca! governments jurisdiction far assessing and
deciding applications for prescribed tidat works within the focal government tidal area, and the planning scheme may be applied to that
assessment (to [he extent provided for in the code for prescribed tidal work).
Resource
>
entittement
Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking oF interfering wih a
prescribed State resource. Schedule 10 of the integrated Planning Regulation 1998 (IPR) prescribes the State resources. including State-
owned land, where evidence is required to be given, and the evidence required to suppor the application. Link to Integrated Planuing
Regulation Section 3.2.1(10)(a){ii} states an applicalion cannot be taken to be properly made without the required evidence.
For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Naiural Resources and Waiter will accept the application as properly made.
For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (iden tified by
gazette notice under the Transport infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection
Agency for quarry matesiat below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
above high water mark.
Owner's consent
Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, ifthe
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within 2 canai as defined
under the Coasia/ Protection and Management Act 1995, or work on tail corridor land defined under the Transport infrastructure Act 1994.
Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
“Owner for the purpose of a lodging an IDAS development application means the person at the lime of lodging the application, entitled to
receive the rent for the fand (or would be entitled to receive the rent for it if it were let lo a tenant at a rent).
Templates are available from the §4 website for the provision of owners consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided i is clear lhe documentation relates to the development apptication for the premises.
Owner's consent, if required, must be provided even if the applicant is the owner, Owner's consent is nol required for a mobile and temporary
ERA
*
Portable Long Service Leave (PLSL) Levy
The Building and Construction Industry Portable Long Service Leave Scheme provides long service ‘eave entitiements to workers in the building
and construction industry who would be unlikely io accrue enough service with one empioyer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried oul inQueensland,
The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry
{Portable Long Service Leave} Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
The Building and Construction Indusiry (Ponable Long Service Leave} Act 1991 (PLSL Act) defines the buitding and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines. fences or earthworks, and works for subdividing, irrigating or draining land.
The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy lo be paid before a development permil may
be issued.
The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from anyQueensiandpost office or agency, on request from QLeave, or can
be completed on the QLeave website al www gleave sf) gov au. For further information contact QLeave (Tel: 1800 803 481 Web:
=aye ald cov.au )
Og SEP 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/1270 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.