Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

09/1270 - MCU - Detached House [As Published] · 132009.1270

of 48

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

—

 

‘Mandatory Information

 

Part D, Version 3.2

ae eee oy

‘

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. Confirm that the following mandatory information accompanies this application:
 edocment of Method of lodgement
For alt applications
(i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed use (e.g. number of employees, days and hours of operation, number of visitors, &] Confirmed mail
number of seats, capacity of storage area)
When the application involves reuse of existing buildings
(ii) Plans showing the size and location of the buildings to be reused im Confirmed
EX] Not applicable
When the application involves new building work
(iii) Plans showing the size and location of the proposed new building work & Confirmed
mail
[] Not applicable
When the application involves reuse of other existing works
{iv) Plans showing the nature and location of the works to be reused O Confirmed
[IX] _ Not applicable
When the application involves new operational work
{v) Plans showing the nature and location of the proposed new operational works [_] Confirmed
&X] Not applicable
OFFICE USE ONLY
Date received Reference numbers |

 

 

 

 

 

 

Advice for completing Part D

 

General advice

Part A must also be completed for all IDAS development applications.

The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to

another question.

When paying fees to the Environmental Protection Agency by electronic funds transfer (EFT) for coastal development applications, use the
process from the information sheet Electronically paying fees to the Environmental Protection Agency (EPA) and securely attach the form

Electronic Funds Transfer (EFT) payment notification to this application.

 

 

 

Q3 A development permit authorises development to occur. A preliminary approval is a step in the approval process and does not authorise
development to occur - a subsequent application for a development permit must be sought.
Table D if the MCU application involves operational work that is the building of a retaining wall on the premises, the application is taken also to be for the

operational work if approval for the operational work has not been applied for in this application or in a separate application.

 

 

* This form is also used for material change of use assessable against the land use plan for Cairns airport land or Mackay airport land, Wherever planning scheme is

mentioned, take it to mean the land use plan for the airport land.

Used in these records

About this file

File size
4.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_1270 - MCU - Detached House [As Published].pdf · 4.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.