Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Bio Retention Plan Set BR190571-C4.02

of 5

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                                               BIORETENTION NOTES
                                                                                                                                                                                                                                                                                                                                                                                                          1. THE CONTRACTOR SHALL PROVIDE CERTIFICATION FROM THE SUPPLIER THAT THE BIO-FILTRATION
                                                                                                                                                                                                                                                                                                                                                                                                             MEDIA COMPLIES WITH THE CURRENT VERSION OF THE 'GUIDELINES FOR SOIL FILTER MEDIA IN
                                                                                                                                                                                                                                                                                                                                                                                                             BIORETENTION SYSTEMS (VERSION 2.01, MARCH 2008 OR LATER)' PREPARED BY THE FACILITY FOR
                                                                                                                                                                                                                                                                                                                                                                                                             ADVANCING WATER BIOFILTRATION (FAWB), MONASH UNIVERSITY PRIOR TO INSTALLATION (THE
                                                                                                                                                                                                                                                                                                                                                                                                             CURRENT VERSION OF THE GUIDELINES IS AVAILABLE FOR FREE DOWNLOAD FROM
                                                                                                                                                                                                                                                                                                                                                                                                             HTTP:\\WWW.MONASH.EDU.AU/FAWB/PUBLICATIONS/INDEX.HTML).
                                                                                                                                                                                                                         PROVIDE ROW OF BLOCKWORK                                   2.47m                             PROPOSED CONCRETE SCOUR                                                             2. SANDY LOAM FILTER MATERIAL PROPERTIES
                                                                                                                                                                                                                        WITHIN 45° OF INLET. 300mm GAP                                                                PROTECTION FOR
                                                                                                                                                                                                                                       BETWEEN ROWS.                                  D                               STORMWATER OUTLET                                                                   HYDRAULIC CONDUCTIVITY                                                                       180 mm/hr
                                                                                                                                                                                                                                                                                    C4.03
                                                                                                                                                                                                                                                     TW                                                                                                                                                   PARTICLE CONTENT        CLAY AND SILY (<0.05m DIAMETER)                                      <3%
                                                                                                                                                                                                                                                                                                                 0
                                                                                                                                                                                                                                                         2.                                                    01
                                                                                                                                                                                                                                                           01
                                                                                                                                                                                                                                                                         RWB                                2.                                                                                                                    VERY FINE SAND (0.05-0.15m DIAMETER)                                 5-30%
                                                                                                                                                                                                                                                             0
                                                                                                                                                                                                                                                                                                         TW                                                                                                                       FINE SAND (0.15-0.25mm DIAMETER)                                     10-30%
                                                                                                                                                                                                                                                                                                                                                                                                                                  MEDIUM TO COARSE SAND (0.25-1.00mm DIAMETER                          40-60%




                                                                                                                                                                                                                                                                       S1




                                                                                                                                                                                                                                                                                                   00



                                                                                                                                                                                                                                                                                                              1.00m
                                                                                                                                                                                                                                                                                                .0
                                                                                                                                                                                                                                                                          .0




                                                                                                                                                                                                                                                                                             S1
                                                                                                                                                                                                                                                                             00
                                                                                                                                                                                                                                                                                                                                                                                                                                  COARSE SAND (1.0-2.0mm DIAMETER)                                     7-10%
                                                                                                                      A                                                                                                                                                                                                                                                                                                           FINE GRAVEL (2.0-3.4mm DIAMETER)                                     <3%
                                                                         TW




                                                                                                                                         0
                                                                                                                                      98
                                                                                                                    C4.03
                                                                           1.




                                                                                                                                 1.
                                                                                              RWB                                                                                                                                                                                                                                                                                                         ORGANIC MATTER CONTENT                                                                       <5% w/w
                                                                                98




                                                                                                                               TW
                                                                                  0                                                                                                                                                                                         HER        HER
                                                                                                                                                                                                                                                                                                                                                                                                          pH                                                                                           5.5 - 7.5 pH
                                                                                             S0




                                                                                                                          80
                                                                                                                                                                                                                                                                                                                                                                                                          ELECTRICAL CONDUCTIVITY                                                                      <1.2 ds/m




                                                                                                                      .7
                                                                                               .7




                                                                                                                     S0
                                                                                               80                                                                                                                                      PROPOSED HIGH                                                                                                                                                      PHOSPHORUS CONCENTRATION                                                                     <100 mh/kg
                                                                                                                                                                                                                                           END RISER
                                                                                                                                                                                                                                                                                                                                                                                                          3. FILTER MEDIA SHOULD BE FREE FROM RUBBISH, DELETERIOUS MATERIAL, TOXICANTS, DECLARED
                                                                                                                                                                                                                                                                                                                                                                                                             PLANTS AND LOCAL WEEDS. FILTER MEDIA SHOULD NOT BE HYDROPHOBIC OR DISPERSIBLE.
                                                                                                                                                                                                                                                                                                                                                                                                          4. ALL LAYERS OF BIORETENTION SYSTEM TO BE INSTALLED DURING DRY WEATHER.
                                                                                                                                                                                                                                                                                                                                                                                                          5. FILTER MEDIA SHOULD BE WELL GRADED, WITH NO GAPS IN THE PARTICLE SIZE GRADING.
                                                                                                                                                                                                                                                                                                                                                                                                          6. TRANSITION LAYER TO BE CLEAN, WELL-GRADED COARSE SAND (CONTAINING < 2% FINES).
                                                                                                                                                                                                                                                                                                                                                                                                          7. DRAINAGE LAYER TO BE CLEAN, FINE GRAVEL WITH 2-5mm WASHED SCREENINGS (CONTAINING < 2%
                                                                                                                                                                                                                                                                                                                                                                                                             FINES, MIN. SATURATED HYDRAULIC CONDUCTIVITY 4000mm/hr).
                                                                                                                                                                                                                                                                                                                                                                                                          8. INSTALL FILTER MEDIA IN TWO LIFTS IF DEPTH >500mm.
                                                                                                                                                                                                                                                                                                                                                                                                          9. FILTER MEDIA TO BE LIGHTLY COMPACTED DURING INSTALLATION, USING A SINGLE PASS WITH A LIGHT
                                                         B                                                                                                                                                                                                                                                                                                                                                   ROLLER. NO OVER TRAFFICKING, MULTIPLE PASSES OR HEAVY COMPACTION TO BE APPLIED TO THE
                                                                                RWB




                                                                                                                                      RWB
                                                       C4.03                                                                                                                                                                                                                        1.00m                                                                                                                    FILTER MEDIA.
                                                                     6.60m




                                                                                                                                                                                                                                                                                                                                                                                                          10.ENSURE SURFACE OF BIORETENTION BASIN IS FLAT AT DESIGN LEVEL.
                                                                                                                                                                                                                                                                                                                                                                                                          11. CONSTRUCTION TOLERANCES SHOULD BE IN ACCORDANCE WITH TABLE BELOW, UNLESS NOTED
                                                                                                                                                                                                                                                                                                                                                                                                             DIFFERENTLY BY LOCAL AUTHORITY GUIDELINES/STANDARDS.
                                                                                                                                                                                                                                                                                                                                                                                                          HYDRAULIC STRUCTURES                              +/- 25mm*




                                                                                                                                                                                                                                                                                                           9.65m
                                                                                                         1.00m
                                                                                                                                                                                                                                                                                                                                                                                                          UNDER-DRAINAGE PIPES                              +/- 25mm




                                                                                                                                                                                                                                                                                                         RWB
                                                                                                                                                                                                                                                          RWB
                                                                                                                                                                                                                                                                                                                                                                                                          EARTHWORKS FOR BASIN BASE                         +/- 25mm
                                                                                                                                                                                                                                                                                                                                                                                                          DRAINAGE AND TRANSITION LAYERS                    +/- 25mm

                                                                                                                                             PROVIDE ROW OF BLOCKWORK                                                                                                                                                                                                                                     SURFACE LEVEL                                     +/- 25mm
                                                                                                                                             WITHIN 45° OF INLET. 300mm GAP                                                                                                                                                                                                                               EMBANKMENT AND BUNDS                              - 25mm, + 50mm
                                                PROPOSED HIGH                                                                                BETWEEN ROWS.
                                                                                                  HER         HER
                                                                                                                                                                                                                                                                                                                        C
                                                    END RISER                                                                                                                                                                                                                                                                                                                                             12.UNDERDRAINAGE PIPES SHOULD BE 100mm DIAMETER SLOTTED PVC PIPES AT A MINIMUM GRADE OF
                                                                                                                                                                                                                                                                                                                      C4.03
                                                                                                                                                                                                                                                                                                                                                                                                              0.5% SLOPED TOWARD OUTLET (UNLESS NOTED OTHERWISE ON DRAWING). PIPE SLOTS TO BE 2MM OR
                                                                                                                                                                                                                                                                                                                                                                                                              SMALLER (AS2439 PART 1).
                                                                                                                                             PROPOSED CONCRETE SCOUR                                                                                                                                                                                                                                      13.UNDERDRAINAGE PIPES SHOULD NOT BE WRAPPED IN GEOFABRIC OR FILTER SOCKS AND SHOULD
                                                                                                                                             PROTECTION FOR                                                                                                                                                                                                                                                   HAVE A MINIMUM OF 50mm OF DRAINAGE MATERIAL ABOVE THE OBVERT OF THE PIPE.
                                                                      1.00m




                                                                                                                                             STORMWATER OUTLET                                                                                                                                                                                                                                            14.BASIN BASE TO BE SLOPED TOWARD OUTLET AT MINIMUM GRADE OF 0.5%. BASE OF TRENCH/BASIN TO
                                                                                                  80




                                                                                                                     S0
                                                                                               .7




                                                                                                                                                                                                                                                                                                                                                                                                              BE FREE OF LOCALISED DEPRESSIONS.
                                                                                                                      .7
                                                                                             S0




                                                                                                                         80




                                                                                                                                                                                                                                                                                                                                                                                                          15.BASIN WALLS, FLOOR AND BATTERS TO BE LINED WITH PERMEABLE GEOFABRIC LINER (BIDIM A29 OR
                                                                                                                               TW                                                                                                                                                                                                                                                                             EQUIVALENT). LINER TO BE KEYED INTO BATTERS AND PINNED TO IN-SITU SOILS.
                                                                                    9   80              RWB                         1.                                                                                                                                                                                                                                                                    16. CONTRACTOR TO GET SIGN OFFS FOR HEALTHY WATERWAYS BIORETENTION BASIN CONSTRUCTION
                                                                                 1.                                                    980
                                                                              T W                                                                                                                                  POOL FENCE TO BE CONSTRUCTED                                                                                                                                                               AND ESTABLISHMENT SIGN OFF FORMS (INCLUDING INCLUDING PRE-START MEETING FORM AND FORMS
                                                                                                                                                                                                                ALONG TOP OF RETAINING STRUCTURE.                                                                                                                                                             A-G) FOR USE THROUGHTOUT CCONSTRUCTION.
                          POOL FENCE TO BE CONSTRUCTED                                                                                                                                                                                                                      HER        HER
                                                                                                                                                                                                                   TO BE BUILT IN ACCORDANCE WITH                                                                                                                                                         17. STORMWATER QUALITY TREATMENT EFFECTIVENESS CONFORMS TO THE FOLLOWING TABLE
                       ALONG TOP OF RETAINING STRUCTURE.




                                                                                                                                                                                                                                                                            0




                                                                                                                                                                                                                                                                                             S1
                                                                                                         2.38m




                                                                                                                                                                                                                                                                             0
                                                                                                                                                                                                                   MANUFACTURERS SPECIFICATIONS




                                                                                                                                                                                                                                                                          .0
                          TO BE BUILT IN ACCORDANCE WITH




                                                                                                                                                                                                                                                                                                .
                                                                                                                                                                                                                                                                                                00
                                                                                                                                                                                                                                                                       S1
                                                                                                                                                                                                                                                                                                                                                                                                                                                WATER QUALITY TARGET




                                                                                                                                                                                                                                                                                                    0
                          MANUFACTURERS SPECIFICATIONS                                                                                                                                                                                                                                                                                                                                                             POLLUTANT                                                         REDUCTION (%)
                                                                                                                                                                                                                                                                                                                                                                                                                                                        (%)
                                                                                                                                                                                                                                                                  10




                                                                                                                                                                                                                                                                                                        TW
                                                                                                                                                                                                                                                                 0            RWB                                                                                                                           TOTAL SUSPENDED SOLIDS                             80                            82.1
                                                                                                                                                                                                                                                              2.




                                                                                                                                                                                                                                                                                                          2.
                                                                                                                                                                                                                                                         TW




                                                                                                                                                                                                                                                                                                            01
                                                                                                                                                                                                                                                                                                                                                                                                                TOTAL PHOSPHORUS                               60                              74




                                                                                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                PROPOSED HIGH                                                                                                                                                    TOTAL NITROGEN                                45                              50
                                                                                                                                                                                                                                                    END RISER
                                                                                                                                                                                                                                                                                                                                                                                                                GROSS POLLUTANTS                               90                             100

                                                                                                                                                                                                                                                                                                                                                                                                          CONSTRUCTION PHASE PROTECTION
                                                                                                                                                                                                                                                                                                                                                                                                          1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE BIORETENTION SYSTEM IS
                                                                                                                                                                                                                                                                                                                                                                                                             APPROPRIATELY PROTECTED THROUGHOUT THE DURATION OF CONSTRUCTION WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                          2. AS SOON AS FILTER MEDIA INSTALLED IN BIORETENTION SYSTEM, FILTER MEDIA SHOULD BE
                                                                                                                                                                                                                                                                                                                                                                                                             PROTECTED WITH GEOFABRIC, TOPSOIL AND TURF UNTIL 90% OF CONSTRUCTION AND BUILDINGS
                                                                                                                                                                                                                                                                                                                                                                                                             WORKS COMPLETED. THEREAFTER, THE GEOFABRIC TO BE REMOVED AND LANDSCAPING WORKS TO
                                                                                                                                                                                                                                                                                                                                                                                                             BE UNDERTAKEN.
                                                                                                                                                                                                                                                                                                                                                                                                          3. CONTRACTOR TO LIMIT FOOT AND VEHICULAR TRAFFIC WITHIN BIORETENTION SYSTEM ONCE FILTER
                                                                                                                                                                                                                                                                                                                                                                                                             MEDIA INSTALLED.

                                                                                                                                                                                                                                                                                                                                                                                                          LANDSCAPING
                                                                                                                                                                                                                                                                                              LEGEND                                                                                                      1. LANDSCAPING WORKS TO OCCUR AS SOON AS POSSIBLE AFTER CIVIL WORKS. MINIMUM PLANT
                                                                                                                                                                                                                                                                                                                                                                                                             DENSITY 6 (Qty/m²). REFER DAVID KEARNEY AND ASSOCIATED DRAWINGS.
                                                                                                                                                                                                                                                                                                                              PROPOSED BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                                                          MAINTENANCE REQUIREMENTS
                                                                                                                                                                                                                                                                                                                              PROPOSED EARTHWORKS TOP OF BATTER                                           1. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE BIORETENTION BASIN IS REGULARLY
                                                                                                                                                                                                                                                                                                                              PROPOSED EARTHWORKS TOE OF BATTER                                              INSPECTED AND MAINTAINED, DURING THE 'ON-MAINTENANCE' PERIOD.
                                                                                                                                                                                                                                                                                                                              PROPOSED BIORETENTION AREA - REFER DETAIL ON DRAWING C04.12                 2. INSPECTIONS TO BE CARRIED OUT BY THE CONTRACTOR ON A REGULAR BASIS, AT LEAST EVERY
                                                                                                                                                                                                                                                                                                                                                                                                             THREE MONTHS AND FOLLOWING SIGNIFICANT RAINFALL EVENTS.
                                                                                                                                                                                                                                                                                                                                                                                                          3. MAINTENANCE TO INCLUDE:
                                                                                                                                                                                                                                                                                                                              PROPOSED LANDSCAPING AREA. REFER TO ARCHITECTURE DRAWING FOR                   - SEDIMENT AND DEBRIS REMOVAL FROM BASIN, INFLOW AREAS AND OUTLET PITS
                                                                                                                                                                                                                                                                                                                              DETAILS.                                                                       - REPAIR OF SCOUR DAMAGE
                                                                                                                                                                                                                                                                                                                              PROPOSED SCOUR PROTECTION                                                      - REPLACEMENT OF DISEASED OR DAMAGED PLANTS
                                                                                                                                                                                                                                                                                                                                                                                                             - VEGETATION PEST MONITORING AND CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                             - MAINTENANCE OF PLANTING DENSITY (6 PLANTS/M2)
                                                                                                                                                                                                                                                                                                                              PROPOSED SUBSOIL HIGH END RISER, DRAINAGE LINE AND INTERMEDIATE                - REGULAR IRRIGATION OF PLANTS UNTIL WELL ESTABLISHED
                                                                                                                                                                                                                                                                                                                              RISER. REFER DETAIL SHEET                                                      - MANUAL REMOVAL OF WEEDS (HERBICIDES SHOULD NOT BE USED)
                                                                                                                                                                                                                                                                                                                                                                                                             - ENSURING PERFORATED PIPES ARE NOT BLOCKED
                                                                                                                                                                                                                                                                                                        RWB                   PROPOSED BLOCK RETAINING WALL - REFER DRAWING C4.04 FOR DETAILS             5. PLANTS TO BE WATERED IN ACCORDANCE WITH SUGGESTED WATERING RATES:
                                                                                                                                                                                                                                                                                                                                                                                                             WEEK 1-6      5 VISITS/WEEK
                                                                                                                                                                                                                                                                                                                              PROPOSED FENCE                                                                 WEEK 6-10     3 VISITS/WEEK
                                                                                                                                                                                                                                                                                                                                                                                                             WEEK 11-15 2 VISITS/WEEK
                                                                                                                                                                                                                                                                                                                              EXISTING STORMWATER                                                            THE ABOVE WATERING PROGRAM SHOULD BE ADJUSTED (INCREASED)
                                                                                                                                                                                                                                                                                                                                                                                                             TO SUIT THE SITE CONDITIONS
                                                                                                                                                                                                                                                                                                                              EXISTING SEWER

                                                                                                                                                                                                                                                                                                                              EXISTING OVERHEAD ELECTRICAL

                                                                                                                                                                                                                                                                                                                              EXISTING TELECOMMUNICATIONS


                                                                                                                                                                                                                                                                                                                                                                                                                          ENGINEER'S CERTIFICATION
                                                                                                                                                                                                                                                                                                                                                                                                                          This drawing has been assigned an electronic code that
                                                                                                                                                                                                                                                                                                                                                                                                                          signifies the drawing has been checked and approved by:                 0           4               8           12m
                                                                                                                                                                                                                                                                                                                                                                                                                          NAME:               SHANE SUFFOLK

                                                                                                                                                                                                                                                                                                                                                                                                                          RPEQ No:          9330                                                              SCALE 1:200 @ A1



C COPYRIGHT of this design and plan is the property of ACOR Consultants (Qld) Pty Ltd, ACN 126 011 087 ABN 18 126 011 087, all rights reserved. It must not be used, modified, reproduced or
                                                                                                                                                                                                                                                                                                                                                                                                                          SIGNED:                                                                     FOR APPROVAL
  copied wholly or in part without written permission from ACOR Consultants (Qld) Pty Ltd. ACOR Consultants is a trademark licensed to ACOR Consultants (Qld) Pty Ltd by ACOR Consultants Pty Ltd.
                                                                                                                                                                                                     Client                        ARCHITECT                                                                                                                                                 Project                                                                Drawing Title
                                                                                                                                                                                                                                                                                                                                               ACOR Consultants (Qld) Pty Ltd                                                                                        BIO RETENTION PLAN
                                                                                                                                                                            North                    WESSEL PETROLEUM                                                                                                                                           LEVEL 4, 43 PEEL STR
                                                                                                                                                                                                                                                                                                                                                                                       PROPOSED BP SERVICE CENTRE
                                                                                                                                                                                                                                                                                                                                                               South Brisbane QLD 4101
   A     FOR APPROVAL                                                                                                                           30/06/20 BVZ     SS                                                                                                                                                                                                  T +61 7 3844 5900 NOOSAVILLE                                                                   Drawn           Date              Scale         A1   Q.A. Check         Date
   P1    FOR INFORMATION                                                                                                                        12/06/20 BVZ     SS                                                                                                                                                                                                                                                                                                 BVZ             MAR 2020           51 SCALE          SS           -
Issue    Description                                                                                                                            Date     Drawn   Approved                                                                                                                                                                                                                    MARY STR & WEYBA ROAD                                                  Designed        Project No.                          Dwg. No.           Issue
                                                                                                                                                                                                     PHONE :                       PHONE :                                                                              ENGINEERS MANAGERS INFRASTRUCTURE PLANNERS DEVELOPMENT CONSULTANTS   NOOSAVILLE, QLD 4566                                                   BVZ                    BR190571                      C4.02              A
Log in to download the original file

BIO RETENTION PLAN SET BR190571-C4.02.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.