IPS REF: 585

  v.    Site cover – The proposed dwelling has a site cover of less than 1%.

 vi.    Access configuration and Parking – The current access arrangements are not proposed to change
        as part of the construction of the dwelling. A double garage is proposed for the purposes of
        parking.

 vii.   Refuse collection – The current refuse collection service afforded to the site is not proposed to
        change due to this application.

viii.   Infrastructure servicing – The proposed dwelling will be serviced via an effluent disposal. The site
        will also have stormwater management in place as per the geotechnical advice. The dwelling will
        also be connected to a water and an electricity supply.

3.3     Supporting Technical Reports

In support of this development application, the following specialist reports listed in Table 5 below have
been commissioned and accompany this planning assessment report:

Table 5: Supporting documentation
 Report title                      Prepared by                         Date               Reference
 Geotechnical Report               Engineering and Building            4 March 2022       Attachment 3
                                   Investigation Services
 Site Investigation and            Engineering and Building            4 March 2022       Attachment 4
 Footing/Slab Design Report        Investigation Services
 Site Assessment and Soil Test for Engineering and Building            7 February 2022    Attachment 5
 onsite disposal                   Investigation Services
 Bushfire Attack Level Assessment Caloundra Building Approvals         22 January 2022    Attachment 6
 Report

A summary of the supporting technical reports commissioned to support the proposed MCU (dwelling
house) development is provided below.

   i.   Summary of Geotechnical and Engineering Matters – The proposed development consists of a
        single level dwelling on a concrete slab with elevated timber framed decks to the southeast side.
        The development will require earthworks for access construction, cut/fill earthworks for building
        site preparations, excavations of footings/foundations and installation of services. Earthworks will
        also be required for site drainage works. The assessment considered the required works, slope
        stability, drainage and effluent disposal required to establish the dwelling house on the site. The
        assessment found that the works required will not adversely impact the site stability, adjoining
        sites or the viability of the proposed dwelling. Please refer to engineering assessments and reports
        included at Attachment 3, 4 and 5 for further details.

  ii.   Summary of Bushfire Matters – A bushfire attack level assessment report has been undertaken
        over the site to assess the risk for the proposed dwelling – refer to Attachment 6. The BAL




                                                                                               Page 9 of 18
Log in to download the original file

585_Planning Report.pdf · 819 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.