Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Unitywater Noosa Netserv Plan - Planning Assumptions · Attachment 1 - Draft Technical Note on Noosa Shire Netserv Plan Planning Assumptions

of 45

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                      l   Noosa Netserv Plan Planning Assumptions June 2024




Figure 4 - BN Node configuration

The relationships between development sequencing criteria (nodes) in the DMaTT BN is
shown in Figure 5. As shown in Figure 5, development sequencing criteria combines into
four main criteria namely, development influences, development margin, proximity to
development, approvals and application, financial feasibility and proximity to existing and
future water, sewer, road and train station infrastructure. Each criterion has a weighted
development factor score based upon its influence in determining the propensity for
development.

The development sequencing criteria and associated development factor scores are shown
in Table 5.

The applied weightings and an example of how individual criteria scores result in a DDI
score is shown in Figure 6.




                                                                                                     19
Log in to download the original file

Attachment 1 - Draft Technical Note on Noosa Shire Netserv Plan Planning Assumptions.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.