Council archive · source document
Unitywater Noosa Netserv Plan - Planning Assumptions · Attachment 1 - Draft Technical Note on Noosa Shire Netserv Plan Planning Assumptions
Plans and drawings: the text below has words only, no drawings.
l Noosa Netserv Plan Planning Assumptions June 2024
Appendix 3 - Network Demand Projections
Unitywater’s Netserv Plan contains demand projections which form the basis of Unitywater’s
planning assumptions for network master planning, Unitywater’s capital works program and
schedule of planned trunk works expressed in Equivalent Persons (EP).
Residential demand projections are sourced from the Netserv Plan population forecasts
(resident and non-resident) and non-residential demand projections are based on the
Netserv Plan GFA forecasts and calculated network demand within DMaTT utilising
EP/100m2 GFA conversion rates contained with the Netserv Plan.
Residential and non-residential demand projections have been summarised by future water
supply and sewerage service catchments. Future service catchments reflect the future
service areas where water supply and sewerage infrastructure will be provided to
accommodate growth from development under the Moreton Bay Planning Scheme,
approved development and development within the Shaping SEQ Urban Footprint to 2056.
45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.