Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Unitywater Noosa Netserv Plan - Planning Assumptions · Attachment 1 - Draft Technical Note on Noosa Shire Netserv Plan Planning Assumptions

of 45

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                      l   Noosa Netserv Plan Planning Assumptions June 2024




3. Information Inputs
The information inputs covered in the following sections include:
   a. Population projections
   b. Baseline land use
   c. Dwelling occupancy rates
   d. M2 GFA per employee conversion rates
   e. GFA projections
   f. Development Approvals
   g. Noosa Planning Scheme density provisions
   h. Noosa Planning Scheme zone land use assumptions
   i. Development constraints
   j. Ultimate development calculation process
   k. Development sequencing (propensity for development) criteria
   l. Forecast modelling scenario testing and validation


3.1.   Population Projections

The DMaTT tool utilises population projections as the control total for property based
projected residential dwellings and population at a SA2 catchment and small area catchment
scale that has regard to:
    • Queensland Government (QGSO) Medium and High Series population projections
        2023 edition;
    • the 2021 baseline population based upon land use information which may result in
        variations to 2021 QGSO population projections at a SA2 level (i.e. higher/lower
        2021 population than projected by QGSO);
    • approved development which may result in variations to QGSO population
        projections at a SA2 level;
    • realistic availability of land supply and development capacity that considers
        development allowable under such planning instruments as the Noosa Planning
        Scheme and existing land uses where properties are already substantially developed
        and don’t have any realistic capacity for future development; and
    • the SEQ Regional Plan such as planning for development within the urban footprint
        and dwelling benchmarks.

Small area catchments have been utilised for properties zoned medium and high density
residential and emerging communities to facilitate the consideration of:
     • SEQ Regional Plan consolidation and expansion dwelling benchmarks;
     • realistic availability of land supply and development capacity within consolidation
        areas; and
     • the timing and ability to service with infrastructure.

Refer to Section 4 regarding the testing and validation of population projections.




                                                                                                       7
Log in to download the original file

Attachment 1 - Draft Technical Note on Noosa Shire Netserv Plan Planning Assumptions.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.